You are on page 1of 5

METERING

VAULT

CK
TRU / EXIT
TRY
EN

OUTLINE OF
BUILDING
SETBACK

GUARD
HOUSE 2
O A D
R
R
CA /EXIT OUTLINE OF
Y
TR BUILDING
EN PAVED
SETBACK
AREA

FUTURE EXPANSION
OF RAW MATERIALS PROPERTY LINE
STORAGE

R O A D
PROPERTY LINE

main fan

consumer
electric
PROPOSED

purging air
consumer
electric
FENCING

consumer
electric

RTK 30/5 D

consumer
for the crude gas ductwork in combination
please proof the position of the supports

electric
Luft. Sauber. Punkt.
to the possible 2nd RTO-line.
1.5 MTS

barrier air
consumer
electric
hot water pumps
SIDEWALK
Thermal-Oil

heat exchanger
PROPOSED BUILDING

with bypass
Heati recovery from VOC

WT 15
LINE OF

consumer
collecting tank

electric
2x electric
consumer
TEMPORARY ROAD THERMAL-OIL

heat exchanger

expansion vessel

pump
silencer
thermal oil
UNIT

WT 25

heat exchanger
thermal oil
WT 10
24

burner

WT 20
2x electric
consumer
1
LOADING
2 DOCK

R O A D
PARKING
3

4 PUMP RM/ GENSET


& CHILLER ROOM
5

7 LINE OF TEMPORARY FENCE

8 CHILLER
BUILDING OUTLINE OF

D
UNDERGROUND
FUTURE EXPANSION OF WATER
PRODUCTION AREA

R O A
RAMP RESERVOIR
GUARD LINE OF
HOUSE TEMPORARY FACILITY
UNDERGROUND
STORAGE
TANK
PEDESTRIAN
ENTRY

VEHICLE
ENTRY GRAVEL ROAD

PROPERTY LINE EXTENT OF


PARKING AREA CONCRETE PAVEMENT

1 2 3 4 5 6 7 8

LINE OF
FUTURE ROAD

SPACE FOR FUTURE UTILITIES


Wandschrank Wandschrank
Ablagetisch Klopft. Ablagetisch Klopft.
lage lage
-Ab -Ab
Bob Bob
Ker

Ker
nrin

nrin
ge
ge

r r
ine ine
nta nta
llco llco
Ro Ro
r r
r ine r ine
ine nta ine nta
nta llco nta llco
llco Ro llco Ro
Ro Ro
Ker

Ker
Ker

Ker
nrin

nrin
nrin

nrin
ge

ge
ge

ge
lage lage
-Ab -Ab
Bob Bob
Ablagetisch Klopft. Ablagetisch Klopft.
Wandschrank Wandschrank
Wandschrank Wandschrank
EPMD-P2

EPMD-P2

You might also like