So now calculate the Total Work by taking the L.C.M which is equal to 360.
2(A+B+C)=12 unit
Now from (iii) and (v) we'll get the A's one day work, which is equal to 3 unit
Now from (i) and (vi) we'll get the days that A can complete the work alone.
A and B can do a piece of work in 5 days; Band C can do it in, 7 days; A and C can do it in 4 days. Who
among these will take the least time if put to do it alone?
=83/140=83/140
2A, 2B and 2C’s one day's work =83/140.=83/140.
A,B and C's one day's work =83/2×140.=83/2×140.
=83/280.=83/280.
If one day's work of A and B is subtracted from one day's work of A,B and C together we get
C's one day's work. Likewise we can get B and C's work of one day.
A's one day work = A,B and C's one day's work- B and C's one day's work.
=(83/280)−(1/7)=43/280=(83/280)−(1/7)=43/280
B's one day's work =(83/280)−(1/4)=13/280.=(83/280)−(1/4)=13/280.
C's one day's work =(83/280)−(1/5)=27/280.=(83/280)−(1/5)=27/280.
A is most efficient fallowed by C and B.
If A, B and C together can finish a piece of work in 4 days; A alone can do it in 12 days and B in 18 days,
then C alone can do it in: