You are on page 1of 1

SD-WAN

Router Installation Report


Installation Date*: Sol /Location ID*: 3002
Contact Person: Extn.No./MobileNo.:
Emp. No.*: Location*: Sholinganallur
Sr. No.*: SDWAN Router Make*:

Activity / Particulars Status / Details

Hardware engineer has properly connected the SDWAN


Router

Drivers loaded by hardware engineer

Users comments

Checklist for SDWAN Migration & Application Testing

All Application Testing/ ATM Working

Labeling and Tagging to new SD-WAN router

Exiting Router details (Make/Model/Sr. No)

Handover of Existing Router with Power Code

________________________________________________
________________________________________________
*User’s Signature with Axis Bank Stamp

You might also like