Professional Documents
Culture Documents
Work Instructions
UCB Battery Replacement
Capstone Model C200 Microturbine/C1000 Series
Guidelines
Review entire procedure prior to performing. Ensure you have all material, tools/equipment,
and reference documents on hand.
Conduct maintenance in a clean, well-lighted area using normal shop tooling to avoid
damage to delicate components.
Retain all parts removed for use in re-assembly, unless otherwise specified.
Safety Procedures
Become familiar with general safety precautions in the Capstone Model C200 Microturbine
User’s Manual (400008) and Capstone C1000 Series User’s Manual (400024). Follow all
warnings and cautions in this work instruction.
Symbols
The following symbols are used throughout Capstone documents to alert you to potential
hazards to people or equipment and tips for proper operation of the equipment.
ELECTRICAL WARNING: Identifies an electrical hazard that can result in personal
injury or death.
Material Information
The part being replaced is BATTERY, 12V, 17AH, SEALED-LEAD (513717-XXX).
Reference Documents
The following Capstone documents are referenced in these Work Instructions:
400003 Recommended Tools, Capstone MicroTurbine
400008 Capstone Model C200 Microturbine User’s Manual
400024 Capstone C1000 Series User’s Manual
440000 Microturbine Standard Maintenance Schedule
512298 Field Service Report
Procedures
1. Prepare for procedure as follows.
WARNING: Fuel hazard! Shut off fuel supply. Failure to observe this warning can
result in personal injury, death, and/or equipment damage.
a. For C200 microturbine(s):
(1) Issue Stop command for affected microturbine.
(2) Shut off fuel inlet supply.
(3) Ensure that microturbine chassis remains properly grounded throughout
procedure.
(4) If microturbine is connected to grid, disconnect and lock out from utility in
accordance with local electrical regulations.
(5) If battery packs are installed, turn OFF and lock out main battery pack circuit
breakers and disconnect battery cables.
(6) Fully isolate microturbine from any other power sources (for example, solid state
relays on user communications board).
(7) Wait at least ten minutes to fully discharge power from the system.
(8) Use DMM to verify that there is no voltage on DC bus and no voltage on high
voltage AC terminal block.
b. For C1000 Series:
(1) If system is configured in MultiPac mode, perform the following steps.
i. Set Override Start to FORCED OFF via CRMS-APS.
ii. Once system is in Stand by mode, disable MultiPac via CRMS.
(2) Continue with the following for all systems.
i. Open C1000 Series Enclosure electrical panel door to access circuit
breakers.
ii. Turn OFF and lock out main circuit breaker for affected bay(s).
iii. Turn OFF and lock out auxiliary circuit breaker for affected bay(s).
iv. Open engine-side door on affected bay(s) and prop open.
v. Shut off fuel inlet supply to bay at ball valve located inside bay door.
vi. Ensure that C1000 enclosure remains properly grounded throughout
procedure.
vii. If battery packs are installed in affected bay, lock main battery pack circuit
breakers in OFF position and disconnect battery cables.
viii. Fully isolate microturbine from any other power sources (for example, solid
state relays on user communications board).
ix. Wait at least ten minutes to fully discharge power from the system.
x. Use DMM to verify that there is no voltage on DC bus and no voltage on
LCM AC output.
440212 Rev A (December 2011) Page 3 of 10
This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any
purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product
specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.
Copy is uncontrolled; user is responsible for verifying current revision.
Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA
C200/C1000 Work Instructions: UCB Battery Replacement
Communications
Bay
UCB Battery
(inside
communications
bay)
UCB
J13
(cable not
shown)
UCB Battery
(not shown)
UCB Cable
Screw (1)
Bracket Bracket
Screw (1) Screw (1)
UCB Cable
Screw (1)
UCB
UCB/J13
UCB Battery
Cable
Battery
Bracket Nut
(1)
UCB Battery
Cable Screw
(2)
Battery
Bracket
Screw (1)
Figure 4 - Disconnect UCB Battery Cable (C1000 SCM)
Bracket Nut
(1)
Bracket
Screws (2)
Bracket
Screw (1)
Responsibility
It is the responsibility of Capstone to:
• Make these procedures available to Authorized Service Providers so they can
successfully complete this task.
It is the responsibility of the Authorized Service Provider to:
• Read this document, understand its contents, and effectively complete procedures.
• Explain service benefits provided to end user.
• Upon completion of service, submit a Field Service Report (512298) to
service@capstoneturbine.com.