VVPSS Maintenance Tasks

Periodic Maintenance

Estimated Duration
Frequency Assumed Equipment
Maintenance Task (man.day) or basis for
(months) implementation Location
estimate
In-Service Inspection of ESPN: 4 VST 60 DTR
Scope – VSTs, all HMS tanks 4 process vessels
(x5), all HMS pipes up to EXC, PAR
RP lines between NRV and VST. Approx. 200m pipework
Calibration of Non-SIC 91 instruments LTM NBC /
instrumentation DTR / L3
Testing / Calibration of SIC 100 instruments LTM NBC / DTR
instrumentation (depends on

integrity level)
Sampling and dosing of water in 7 vessels LTM DTR
VSTs and HMS process vessels
Replacement of gas analysers 6 analysers DTR
Purging/evacuation of gas NBC / DTR
spaces
Leak testing of primary vacuum 2 x bleed valves NBC
barrier 2 x rupture discs
Exercise of WRC pumps 0.5 (2 pumps) LTM DTR
Exercise/testing of ST-VS fans 1 (2 fans) B14
Exercise of valves 120 process valves LTM NBC /
+solenoid valves for DTR / L3
instruments
Demonstration of Hard-Core 8 valves LTM DTR
isolation post valve exercise
Testing of PAR 1 18-24 DTR
Reactivation of PAR 10 120 DTR
Testing of WRC 1 18-24 DTR
Reactivation of WRC 10 120 DTR
DOP testing filters 1 24 (LTM) L3
Flow testing of PST dilution air 1 LTM DTR
filters
Radiological monitors calibrated DTR
Flame arrestors inspection 1 (4 arrestors) DTR
VST ejector testing 1 (4 ejectors) DTR

Post-operation Maintenance (post incident or accident)

Task Estimated Duration (man.day) Frequency Equipment


(month) Location
Sampling tanks
Draining tanks to Hot Cell
Blowing through system to
dislodge contamination
Washing tanks
Cleaning of relief lines
Filter change (Cat II LOCA and all
LOVA)
Large filter dust removal (Cat III/IV)
Task Estimated Duration (man.day) Frequency Equipment
(month) Location
Removal of bleed valves assembly NBC
(all accident/incident) (RH)
Removal of rupture disk assembly NBC
(Cat III/IV) (RH)
Post operation inspection – visual
inspection of system
Reinstallation of refurbished RD / NBC
BV assemblies (RH)
Refilling tanks
System function tests:
 Rotating equipment
 Valves
 Hydrogen recombination
 Instrumentation
Evacuation and setting to Standby
State