DOCUMENT CONTROL - ALLOCATION OF DUTIES (A)

MAINTENANCE OF REGISTERS
13 Sept' 04
JBR-1 JBR-3
REGISTER INCOMING Excel Mace Exp Local Exp Excel Mace Exp Local Exp
Correspondence Varghese Jessie
Shop Drawings Transmittal sheets Geetha Jessie
Shop Drawings Varghese Javed [Arenco] Jessie
MEP Shop Drawing Transmittal sheets Geetha Jessie
MEP Shop Drawings Javed Jessie
Contract Drawing Transmittal sheets Gopal Geetha
Contract Drawings Gopal
Method Statements Geetha Javed Jessie
MEP Method Statements Geetha Javed Jessie
Material Submittals Geetha Javed Jessie
MEP Material Submittals Geetha Javed Jessie
Prequalifications Geetha Javed Jessie
RFI / RFC Geetha Javed Jessie
NCR Geetha
Site Instructions Geetha Jessie
Bulletin Geetha
Programme
Sub Contractor Approvals SCAR Geetha Javed Jessie
Technical Submittals Geetha Javed Jessie
MEP Technical Submittals Geetha Javed Jessie
Test Reports Geetha Javed Jessie
REGISTER OUTGOING Excel Mace Exp Local Exp Excel Mace Exp Local Exp
Correspondence Varghese
Shop Drawings Transmittal sheets Gopal Chris
Shop Drawings Varghese Gopal Javed
MEP Shop Drawing Transmittal sheets Javed Chris
MEP Shop Drawings Malik Javed
Contract Drawing Transmittal sheets
Contract Drawings Chris
Method Statements Gopal Javed Chris
MEP Method Statements Javed Chris
Material Submittals Javed Chris
MEP Material Submittals Malik Malik Javed Chris
Prequalifications Malik/Gopal Javed Chris
RFI / RFC Malik Malik/Gopal Javed Chris
NCR
Site Instructions
Bulletin N/A N/A N/A
Programme
Sub Contractor Approvals SCAR Malik/Gopal Javed Chris
Technical Submittals Gopal Javed Chris
MEP Technical Submittals Javed Chris
Test Report Malik/Gopal Javed Chris
DOCUMENT CONTROL - ALLOCATION OF DUTIES (B)
ISSUE OF DOCUMENTS
13 Sept' 04
JBR-1 JBR-3
ISSUE INTERNALLY Issue only Excel Issue only Excel
Correspondence Varghese
Shop Drawings Deb
MEP Shop Drawings
Contract Drawings
Method Statements
MEP Method Statements
Material Submittals
MEP Material Submittals
Prequalifications
RFI / RFC
NCR
Fax
Site Instructions
Bulletins
Programme
Sub Contractor Approvals
Technical Submittals
MEP Technical Submittals
Test Report
ISSUE TO SUBCONTR. Issue only Excel Excel Local Exp
Correspondence Varghese
Shop Drawings Deb
MEP Shop Drawings
Contract Drawings
Method Statements
MEP Method Statements
Material Submittals
MEP Material Submittals
Prequalifications
RFI / RFC
NCR
Fax
Site Instructions
Bulletins
Programme
Sub Contractor Approvals
Technical Submittals
MEP Technical Submittals
Test Report

DOCUMENT CONTROL TEAM Chris, Jessy, Geetha, Malik & Gopal

TECHNICAL TEAM Deb, Jibbu & Safraz

SECRETARIAL TEAM Javed , Thuy ,Varghese,