3 Section 6.3 GL GL : crane data only for XCMG QUY 650T ? Incorporated as is
6 Section 6.4 GL GL : and its option 2 with total weight of option 1 (page 30, 31) Incorporated as is
7 section 7.2 GL GL : one crawler crane 1600T & one 650T Incorporated as is
10 section 7.3 GL GL : crane operator report each reading of crane load after inclination Incorporated as is
GL : before moving and lift above the level of final position, crane
11 section 7.3 GL Incorporated as is
operator report each reading of crnae, after each action.
18 Section 9.2 RHE RHE : specify the case, 0 deg or iclination, (typical comment) Incorporated as is
GL : crane position like this to avoid clach with bracing, just remove the
24 Appendix 1 GL Incorporated as is
gas rack, if we have some angle is ok, we can adjust after moving.
27 Appendix 1 GL GL: if one sling take more tension its very bad Noted. Will re-arrange the slings in next revision.
GL: problem with this value. Must be checked. Rigging weight option 2 :
28 Appendix 1 GL Incorporated as is
7.32 & 8.18
31 Appendix 1 GL GL: need put the real radius the position of crane is not perpendicular (crawler & boom)
GL: you need show in one section the gap that we have between the
33 Appendix 1 GL Incorporated as is
scafolding already in place on the top panel ant the towers.
GL : 2 slings for 1 connection its not good, its one sling take more tension
34 Appendix 1 GL Noted. Will re-arrange the slings in next revision.
it's bad
35 Appendix 1 GL GL : 11.58T ?? Its 3.2T based on sling certificate the weight of sling 4.516T
a. Incorporated as is
b. Incorporated with minor modification
c. Not incorporated
For status b and c, Contractor shall justify the reasons of the modification or of the rejection and provide the associated benefits and/or impacts (Including Preparation of Change Order Request)
GLF-WHP02-EPCI4
Remarks:
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 1 of 28
Block 5 - AL SHAHEEN FIELD Development
REVISION HISTORY
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 2 of 28
Block 5 - AL SHAHEEN FIELD Development
TABLE OF CONTENTS
LIST OF FIGURES ........................................................................................................................................ 5
1. PURPOSE ............................................................................................................................................ 6
2. SCOPE ................................................................................................................................................ 6
3. REFERENCES ...................................................................................................................................... 7
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 3 of 28
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 4 of 28
Block 5 - AL SHAHEEN FIELD Development
LIST OF FIGURES
Figure 2-1 : General Arrangement of Lifting EH WHP Jacket Row 1 from Temporary Support to Final
Erection Supports .....................................................................................................................................6
Figure 5-1 : Al-Shaheen Field Block 5 Location. .......................................................................................9
Figure 5-2 : Field Layout for Gallaf Project. ............................................................................................10
Figure 6-1 : CoG Location of EH WHP Jacket Row 1 with 0 Degree ......................................................11
Figure 6-2 : CoG Location of EH WHP Jacket Row 1 with Inclination 5.7 Degree ...................................12
Figure 6-3 : EH WHP Location in Yard Lay-out.......................................................................................13
Figure 8-1 : 3D SACS Model of EH WHP Jacket Row 1 Lifting Analysis .................................................17
Figure 8-2 : Boundary Condition of Model ..............................................................................................18
Figure 9-1 : Maximum Member Stress ....................................................................................................20
Figure 9-2 : Maximum Tubular Joint Strength Check Locations ..............................................................21
Figure 9-3 : Member Maximum Relative Deflection Plot .........................................................................23
LIST OF TABLES
Table 6-1 : Weight and CoG Summary ...................................................................................................11
Table 6-2 : Crawler Crane Data ..............................................................................................................13
Table 6-3 : Lifting Rigging Data ..............................................................................................................14
Table 6-4 : Design Lift Criteria ................................................................................................................15
Table 8-1 : Material Parameters of Steel Members .................................................................................17
Table 8-2 : Weight Contingency .............................................................................................................18
Table 8-3 : Boundary Condition ..............................................................................................................18
Table 8-4 : Basic Load Case Description ................................................................................................19
Table 8-5 : Load Combinations Description ............................................................................................19
Table 9-1 : Member Stress Check Summary ..........................................................................................20
Table 9-2 : Tubular Joint Strength Check Summary ...............................................................................21
Table 9-3 : Hook Reaction Summary ......................................................................................................22
Table 9-4 : Sling Member End Forces Summary ....................................................................................22
Table 9-5 : Member Relative Deflection Summary ..................................................................................23
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 5 of 28
Block 5 - AL SHAHEEN FIELD Development
1. PURPOSE
The purpose of this document is to present lifting procedure of Gallaf Batch 2 EH Jacket Row 1 with an appropriate design
condition to meet the requirements.
2. SCOPE
This document presents general activity and procedure during installation of EH Jacket Row 1 from temporary fabrication
support to final erection support at the fabrication yard. This procedure covers the methodology, lifting arrangement,
equipment and engineering calculation for the entire activities in the most efficient and practical way.
Figure 2-1 : General Arrangement of Lifting EH WHP Jacket Row 1 from Temporary Support to Final Erection Supports
The soil test activity in this area has been completed, hence the ground bearing assessment for this activity will be
presented in the Appendix 4.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 6 of 28
Block 5 - AL SHAHEEN FIELD Development
3. REFERENCES
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 7 of 28
Block 5 - AL SHAHEEN FIELD Development
4. NOMENCLATURE
4.1. Acronym
Acronym Description
4.2. Definitions
Term Definition
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 8 of 28
Block 5 - AL SHAHEEN FIELD Development
5. PROJECT DESCRIPTION
The Al-Shaheen field is QATAR’s largest oil field. It is a conventional oil field (of approximately 60 m water depth) situated
offshore the State of Qatar approximately 70 km north-north-east of Ras Laffan. The field overlays the giant pre-Khuff gas field
known as North Field.
Thirty three platforms, including five production hubs, are installed in Al-Shaheen field. These are spread over nine different
areas across the field - Locations A to I. Crude is exported by tanker via tandem offloading from two FSOs which are
permanently moored in the field to two (of three) SPMs. Gas is gathered in a gas grid pipeline system and exported via North
Field Alpha.
The field has been developed through several phases and further development phases are envisaged by COMPANY as operator
of the Al-Shaheen concession.
In order to improve the field production capacity COMPANY has initiated Al-Shaheen Gallaf project. Gallaf project consists in
installing 7 new WHPs and 1 process platform to existing Al-Shaheen field platforms. The project is planned to be developed in
3 batches:
i. The first batch (Batch 1) consists of three (3) new wellhead platforms (DC, EG and FC) bridge-linked to existing
platforms (DA, ED and FA).
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 9 of 28
Block 5 - AL SHAHEEN FIELD Development
ii. The second batch (Batch 2) consists of 2 new wellhead platforms (CE and EH) bridge-linked to existing platforms (CD
and EG).
iii. The third batch (Batch 3) consists of 2 new remote wellhead platforms and one new process platform bridge-linked to
existing platform GD.
As a base case, platforms shall be designed for full 24 well-slot access and operation using 60-foot drilling jack-ups on one
defined footprint.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 10 of 28
Block 5 - AL SHAHEEN FIELD Development
6. GENERAL INFORMATION
The EH WHP Jacket Row 1 weight and CoG summary are shown in Table 6-1 below.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 11 of 28
Block 5 - AL SHAHEEN FIELD Development
Figure 6-2 : CoG Location of EH WHP Jacket Row 1 with Inclination 5.7 Degree
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 12 of 28
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 13 of 28
Block 5 - AL SHAHEEN FIELD Development
The rigging equipment to be used during lifting are presented in Table 6-3 at .
Total
Designated Diameter Length SWL Quantity
Item Description Weight
Rigging
(mm) (m) (mT) (Ea) (mT)
Sling 1 2 x Wire rope sling 80.00 15.000 170.00 1.00 1.18
Sling 2 2 x Wire rope sling 80.00 14.968 170.00 1.00 1.18
Sling 3 Cable Laid Grommet 78.00 6.000 116.50 1.00 0.23
Sling 4 2 x Wire rope sling 80.00 15.684 170.00 1.00 1.24
Sling 5 2 x Wire rope sling 80.00 14.956 170.00 1.00 1.18
Sling 6 Cable Laid Grommet 78.00 6.000 116.50 1.00 0.23
Sling 7 Wire rope sling 235.00 34.000 382.00 1.00 4.52
Sling 8 Cable Laid Grommet 78.00 14.000 116.50 1.00 0.53
Sling 9 Cable Laid Grommet 78.00 6.000 116.50 1.00 0.23
Sling 10 Wire rope sling 235.00 34.000 382.00 1.00 4.52
Sling 11 Cable Laid Grommet 78.00 14.000 116.50 1.00 0.53
Sling 12 Cable Laid Grommet 78.00 6.000 116.50 1.00 0.23
Shackle 1 Shackle Anchor Bolt Type - - 200.00 1.00 0.23
Shackle 2 Shackle Anchor Bolt Type - - 150.00 1.00 0.15
Shackle 3 Shackle Anchor Bolt Type - - 250.00 1.00 0.30
Shackle 4 Shackle Anchor Bolt Type - - 250.00 1.00 0.30
Shackle 5 Shackle Anchor Bolt Type - - 600.00 1.00 1.07
Shackle 6 Shackle Anchor Bolt Type - - 500.00 1.00 0.72
Shackle 7 Shackle Anchor Bolt Type - - 600.00 1.00 1.07
Shackle 8 Shackle Anchor Bolt Type - - 500.00 1.00 0.72
Total rigging weight at Hook 1 6.22
Total rigging weight at Hook 2 14.10
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 14 of 28
Block 5 - AL SHAHEEN FIELD Development
The design lift criteria for lifting analysis are taken from SD-NOC-STR-401 (Ref. 8) and SD-NOC-STR-411 (Ref. 7). Summary of
lift criteria is shown in Table 6-4.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 15 of 28
Block 5 - AL SHAHEEN FIELD Development
1. Job Risk Assessment (JRA) meeting shall be conducted with all relevant parties i.e. Engineering Team, Construction
Team, HSE Team, Riggers and Lifting Supervisor to ensure the procedure and safety during lifting operation.
2. All lifting rigging equipment and certificates shall be checked in accordance with Lifting Plan Checklist to ensure all the
equipment is as per lifting design.
3. Environmental assessment shall be performed prior to lifting operation to ensure the current wind speed does not
exceed the maximum wind speed limit of 15 Knots.
4. All perimeters shall be secured by using barricade fences prior to lifting operation. Only authorized personnel shall be
permitted to enter the perimeter during lifting operation.
5. All crane routes shall be checked for any obstacle prior to start the lifting activity.
1. Crawler cranes are in initial position. Crane 1 shall set the boom length and working radius to 60 m and 24.00m
respectively. Crane 2 shall set the boom length and working radius to 114 m and 29 m respectively.
2. All rigging equipment is connected to crane hooks.
3. Lift crane hooks to start tensioning all slings. The jacket panel shall remain supported on the temporary support.
4. Increase the crane load incrementally by 10% of lift weight until the reading on the crane load reaches 100% lift
weight. Crane operator to report each reading of crane load to the Lifting Supervisor.
5. After reading on the crane load shows 100% lift weight have been taken by the crane, lift-up until the panel ROW-1 3
meter from temporary support and start to inclination panel ROW-1 with 5.7 degree at crane 2 with hook-up & change
radius from 29 meter up to 29.20 meter, crane operator report each reading of crane load after inclination.
6. Before moving and lift above the level of final position, crane operator report each reading of crane after each action
and panel ROW-1 ready to start moving to side of final position.
1. All cranes prepare for traveling to final position on the erection support.
2. Lifting Supervisor shall guide all the crane operators and signal man to ensure all cranes operates simultaneously.
3. After crane movement until at side of the final position, panel ROW-1 continue to lift-up until aproximatelly 2 meter
from top of horizontal X-Brace.
4. Continue movement to the final position, all clearances to the structure below it shall be maintained and monitored.
1. At the final position, crane operator report each reading of crane load before to lowered down the hooks.
2. All hooks shall be lowered down to install the panel on top of jacket structure below.
3. Lifting Supervisor to communicate with Dimensional Controller to achieve the correct installation position.
4. After the panel has been installed with minimum 30% welding, all crawler cranes shall release the crane loads
gradually by 10% of lift weight until the reading on the crane shows that the crane is free loaded. Crane Operators to
report the reading of crane loads to Lifting Supervisor.
5. All riggings shall be dismantled and then the crane hook shall be raised up and secured in the safe clearance from
jacket structure.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 16 of 28
Block 5 - AL SHAHEEN FIELD Development
8. COMPUTER MODEL
A three-dimensional model of EH WHP Jacket Row 1 has been developed using SACS v14.1 to check structural integrity during
lifting from temporary support to final erection support. The general isometric views of EH WHP Jacket Row 1 lifting are shown
in Figure 8-1.
Relevant material parameters as described below have been assigned for each member accordingly in the model.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 17 of 28
Block 5 - AL SHAHEEN FIELD Development
Weight contingencies for jacket structure shall be in-line with Structural Design Basis, Ref. [1].
The structure is assumed to be supported on hook points. The boundary condition on hook point is presented in Table 8-3.
Joint Fixity
Description Joint ID Remarks
Tx Ty Tz Rx Ry Rz
Hook 1 HK01 1 1 1 1 1 1 -
Hook 2 HK02 1 1 1 1 1 1 -
Notes:
0 = Released 1 = Restrained
T = Translational R = Rotational
Lateral springs are also introduced in the model to prevent rigid body movement and to ensure numerical stability of structure.
The generated reaction shall not exceed 0.1% of structure total weight.
For sling members, releases are applied to allow only tension in member internal end forces.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 18 of 28
Block 5 - AL SHAHEEN FIELD Development
8.5. Loadings
Various loads have been simulated in the model, either by auto-generation or user-input. These loads have been grouped into
specific basic load cases number as defined in Table 8-4. Then, the basic load cases are factored and combined to generate the
worst possible loading conditions that the structure expected to experience during lifting condition. Description of load
combination is presented in Table 8-5.
JTRU Trunnion
JANO Anodes
JPAI Painting
SCAF Scaffolding
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 19 of 28
Block 5 - AL SHAHEEN FIELD Development
9. ANALYSIS RESULT
Member Sizes
Group ID Member ID Load Combination UC Location
(mm)
JL1 JA1D-1005 OD 1985 x 20 WT 4001 0.75 Jacket leg
J24 JA12-J212 OD 762 x 12 WT 4001 0.77 Horizontal framing
JC1 0014-JV11 OD 813 x 15WT 4001 0.39 X-brace
TM1 0015-0018 OD 609.6 x 12.7 WT 4001 0.45 Temporary Support
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 20 of 28
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 21 of 28
Block 5 - AL SHAHEEN FIELD Development
Sling member end forces summary which will be used as input for rigging calculation is presented in Table 9-4.
Sling 10, 11 & 12 1004-HK01 1440.30 0.00 0.00 0.00 0.00 0.00
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 22 of 28
Block 5 - AL SHAHEEN FIELD Development
The relative vertical deflection is checked against the allowable deflection for Load Combination 1000. Allowable deflection
(SPAN/200) is taken in accordance with CE & EH WHP Structural Design Basis (Ref. 1). Summary of the maximum member
relative vertical deflection is shown in Table 9-5.
Initial Lifting
1000 JA12 -174.92 J211 -230.26 JB12 -166.64 55.34 63.62 25.76 128.80 X-brace
1000 1002 -161.31 JA13 -205.92 0009 -95.50 44.61 110.42 44.39 221.95 Leg
1000 1002 -161.58 JA13 -205.23 0009 -95.29 43.65 109.94 44.39 221.95 Leg
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 23 of 28
Block 5 - AL SHAHEEN FIELD Development
10. APPENDICES
APPENDIX 1 – Drawings
APPENDIX 2 – Miscellaneous Calculation
APPENDIX 3 – Crane Data
APPENDIX 4 – Soil Capacity Assessment
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 24 of 28
Block 5 - AL SHAHEEN FIELD Development
APPENDIX 1 – DRAWINGS
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 25 of 28
(20x110m)
(60x110m) (60x110m)
(60x110m)
FORMOSA
Access Road (Concrete)
CE PILES P1
05
NOTE:
EH PILES P1 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATION IN
METERS U.N.O.
A B
PT SMOE
WHP02-SMO1-ASEHS-19-300003-0001
GALLAF BATCH 2 - DETAILED DESIGN
EH WHP JACKET
LIFTING PROCEDURE ROW-1
SITE MOVEMENT
DRW 65 ASEHS-19-300003-0001 DE 2
AS-SHOWN A1 2013J310005-ASEHS-19-300003-0001-GA-001 001 05
05
DETAIL DETAIL
CC 8800
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATION IN
METERS U.N.O.
PT SMOE
WHP02-SMO1-ASEHS-19-300003-0001
CC 8800 GALLAF BATCH 2 - DETAILED DESIGN
EH WHP JACKET
LIFTING PROCEDURE ROW-1
SIDE VIEW LIFTING ARRANGEMENT
DRW 65 ASEHS-19-300003-0001 DE 2
AS-SHOWN A1 2013J310005-ASEHS-19-300003-0001-GA-002 002 05
05
CC 8800
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATION IN
METERS U.N.O.
PT SMOE
CC 8800
WHP02-SMO1-ASEHS-19-300003-0001
GALLAF BATCH 2 - DETAILED DESIGN
EH WHP JACKET
LIFTING PROCEDURE ROW-1
SIDE VIEW LIFTING ARRANGEMENT
DRW 65 ASEHS-19-300003-0001 DE 2
AS-SHOWN A1 2013J310005-ASEHS-19-300003-0001-GA-003 003 05
05
1 A
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATION IN
METERS U.N.O.
PT SMOE
WHP02-SMO1-ASEHS-19-300003-0001
GALLAF BATCH 2 - DETAILED DESIGN
EH WHP JACKET
LIFTING PROCEDURE ROW-1
RIGGING & LIFTING ARRANGEMENT
DRW 65 ASEHS-19-300003-0001 DE 2
AS-SHOWN A1 2013J310005-ASEHS-19-300003-0001-GA-004 004 05
A
B
05
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATION IN
METERS U.N.O.
PT SMOE
WHP02-SMO1-ASEHS-19-300003-0001
CC 8800 GALLAF BATCH 2 - DETAILED DESIGN
EH WHP JACKET
LIFTING PROCEDURE ROW-1
SITE MOVEMENT
DRW 65 ASEHS-19-300003-0001 DE 2
AS-SHOWN A1 2013J310005-ASEHS-19-300003-0001-GA-005 005 05
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 26 of 28
1
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 13-Apr-21 04
SUBJECT : Lifting EH WHP Jacket ROW-1 PREP'D. BY CHECKED BY :
Rigging Calculation (Option 1) AH YM
A. DESCRIPTION
This spreadsheet presents rigging equipments capacity check against occurring load during Row 1 panel lifting to
erection supports. The occurring loads, taken as maximum sling tensions, are obtained from SACS analysis result,
as complete output is provided in Appendix 2.
As per Section 16.3.4 of DNVGL-ST-N0001 (Ref.8), the sling design load shall be taken as maximum calculated
dynamic axial load in the sling by considering relevant factors. The factors considered for this are as per the
the following
FSD = DF x Static Sling Tension
DF = CF x CoGF x DAF x YF x SKL
Where :
CF = Weight contingency factor = 1.05
CoGF = CoG variation factor = 1.05
DAF = Dynamic Amplification Factor = 1.10
YF = Yaw factor = 1.05
SKL = Skew load factor = 1.10
Total Design Load Factor (DF) = 1.40
2
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 13-Apr-21 04
SUBJECT : Lifting EH WHP Jacket ROW-1 PREP'D. BY CHECKED BY :
Rigging Calculation (Option 1) AH YM
C. INPUT DATA
Input data is taken from SACS output as sling member end forces in static condition (LCOMB 1000). Summary of sling
forces is listed in table below.
Based on the above sling forces data, the designated riggings are as per table below.
Item
SWL Design Load (FSD) Safety Factor SWL Eficiency Check
Description
No. Sling mT mT SWL/FSD (FSD/SWL)x100(%) SF>1, OK!
Sling 2 170.00 91.73 1.85 53.96 OK!
Sling 3 116.50 91.73 1.27 78.74 OK!
Sling 5 170.00 91.74 1.85 53.97 OK!
Sling 6 116.50 91.74 1.27 78.75 OK!
Sling 8 116.50 103.35 1.13 88.71 OK!
Sling 9 116.50 103.35 1.13 88.71 OK!
Sling 11 116.50 103.32 1.13 88.68 OK!
Sling 12 116.50 103.32 1.13 88.68 OK!
Table 5 - Rigging Assessment for Shackle
Item
SWL Design Load (FSD) Safety Factor SWL Eficiency Check
Description
No. Sling mT mT SWL/FSD (FSD/SWL)x100(%) SF>1, OK!
Shackle 1 200.00 91.73 2.18 45.87 OK!
Shackle 2 150.00 91.73 1.64 61.16 OK!
Shackle 3 250.00 91.74 2.73 36.70 OK!
Shackle 4 250.00 91.74 2.73 36.70 OK!
Shackle 5 600.00 103.35 5.81 17.22 OK!
Shackle 6 500.00 103.35 4.84 20.67 OK!
Shackle 7 600.00 103.32 5.81 17.22 OK!
Shackle 8 500.00 103.32 4.84 20.66 OK!
1
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 13-Apr-21 04
SUBJECT : Lifting EH WHP Jacket ROW-1 PREP'D. BY CHECKED BY :
Rigging Calculation (Option 2) AH YM
A. DESCRIPTION
This spreadsheet presents rigging equipments capacity check against occurring load during Row 1 panel lifting to
erection supports. The occurring loads, taken as maximum sling tensions, are obtained from SACS analysis result,
as complete output is provided in Appendix 2.
As per Section 16.3.4 of DNVGL-ST-N0001 (Ref.8), the sling design load shall be taken as maximum calculated
dynamic axial load in the sling by considering relevant factors. The factors considered for this are as per the
the following
FSD = DF x Static Sling Tension
DF = CF x CoGF x DAF x YF x SKL
Where :
CF = Weight contingency factor = 1.05
CoGF = CoG variation factor = 1.05
DAF = Dynamic Amplification Factor = 1.10
YF = Yaw factor = 1.05
SKL = Skew load factor = 1.10
Total Design Load Factor (DF) = 1.40
2
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 13-Apr-21 04
SUBJECT : Lifting EH WHP Jacket ROW-1 PREP'D. BY CHECKED BY :
Rigging Calculation (Option 2) AH YM
C. INPUT DATA
Input data is taken from SACS output as sling member end forces in static condition (LCOMB 1000). Summary of sling
forces is listed in table below.
Based on the above sling forces data, the designated riggings are as per table below.
Item
SWL Design Load (FSD) Safety Factor SWL Eficiency Check
Description
No. Sling mT mT SWL/FSD (FSD/SWL)x100(%) SF>1, OK!
Sling 2 180.00 91.73 1.96 50.96 OK!
Sling 3 180.00 91.73 1.96 50.96 OK!
Sling 5 180.00 91.74 1.96 50.97 OK!
Sling 6 180.00 91.74 1.96 50.97 OK!
Sling 8 180.00 103.35 1.74 57.42 OK!
Sling 9 116.50 103.35 1.13 88.71 OK!
Sling 11 180.00 103.32 1.74 57.40 OK!
Sling 12 116.50 103.32 1.13 88.68 OK!
Table 5 - Rigging Assessment for Shackle
Item
SWL Design Load (FSD) Safety Factor SWL Eficiency Check
Description
No. Sling mT mT SWL/FSD (FSD/SWL)x100(%) SF>1, OK!
Shackle 1 120.00 91.73 1.31 76.44 OK!
Shackle 2 120.00 91.73 1.31 76.44 OK!
Shackle 3 120.00 91.74 1.31 76.45 OK!
Shackle 4 120.00 91.74 1.31 76.45 OK!
Shackle 5 120.00 103.35 1.16 86.12 OK!
Shackle 6 150.00 103.35 1.45 68.90 OK!
Shackle 7 120.00 103.32 1.16 86.10 OK!
Shackle 8 150.00 103.32 1.45 68.88 OK!
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 13-Apr-21 04
SUBJECT : Lifting EH WHP Jacket ROW-1 PREP'D. BY CHECKED BY :
Stopper Design AH YM
1. Preface
This section purposes is to check the stopper support integrity during lifting
Rv
Leg α
Stopper Pipe
Sling
Material Properties
- Material Grade S355 Fy = 345 Mpa = 3517.97 kg/cm2
- Allowable Bending Stress Fb = 0.66 x Fy = 2321.86 kg/cm2
- Allowable Shear Stress Fs = 0.40 x Fy = 1407.19 kg/cm2
- Allowable Bearing Stress FBr = 0.90 x Fy = 3166.17 kg/cm2
- Outside Diameter D = 10 inch = 27.31 cm
- Wall Thickness t = SCH = 1.27 cm
- Inside Diameter d = = 24.77 cm
- Length L = = 25.00 cm
- K-Value k = 1.00
2
- Section Area Ap = p (D2-d2) / 4 = 103.82 cm (Pipe)
- Shear Area Asp = prt = 54.44 cm2 (Pipe)
- Inertia Moment Ip = p (D - d4) / 64
4
= 8817.56 cm4 (Pipe)
- Section Modulus Sp = I / (1/2 D) = 645.86 cm3 (Pipe)
2. Design Load
- Sling Diameter DSL = 11.5 cm
- Maximum Sling Force R = 206700 Kg
- Sling Angle α = 84.3 Degree
- Horizontal Force Rh = 20529.3923 Kg
- Vertical Force Rv = 205677.986 Kg
i) Shear Check
L = 25.00 cm
F
fs = < 0.40 x Fy
Asp
20529.392
= < 0.40 x Fy
54.44
2 2
= 377.08 kg/cm < 1407.19 kg/cm OK
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 13-Apr-21 04
SUBJECT : Lifting EH WHP Jacket ROW-1 PREP'D. BY CHECKED BY :
Stopper Design AH YM
Based on the above table, it is found that maximum sling force occurs on Sling 2, where
the sling shall be attached to pipe 2005mm OD x 30mm WT. Local stress check on the pipe
due to sling force is presented in the followings.
P R 3 tonne
Local stress at pipe σ K ln 8,88 10
2 t 2
t m
Material yield strength Fy 345 MPa
σ ge
Stress UC UC 0,34
σallow
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 27 of 28
EN 13000
Superlift Counterweight (t) 0 100 180 240 340 440 540 640
Radius (m)
16 334 479* 546* (547*) (550*) (551*) (552*) (553*)
18 295 427* 533* 547* (550*) (551*) (552*) (553*)
20 263 384* 481* 547* (550*) (551*) (552*) (553*)
22 236 347 437* 504* 550* (551*) (552*) (553*)
24 212 316 399* 461* 550* (551*) (552*) (553*)
26 192 289 367 425* 522* 551* (552*) (553*)
28 174 265 338 393* 484* 548* (548*) (548*)
30 158 244 313 364 450* 528* 539* (539*)
34 132 209 270 316 393* 453* 511* 521*
38 110 180 234 274 339 393* 446* 496*
42 91,5 153 200 235 293 346 393* 440*
46 73 129 172 204 257 307 350 393*
50 58 109 149 178 226 274 313 353
54 45,5 92,5 130 157 201 245 283 319
58 34,9 78 113 139 180 220 256 290
62 25,9 66 98,5 122 161 199 233 265
66 18,1 55,5 86 108 145 181 213 243
70 11,4 46,8 75 96 131 165 196 224
74 38,8 65,5 85,5 118 151 180 207
78 31,8 57 76 107 138 166 192
82 25,6 49,6 67,5 97 127 154 178
86 20,2 42,9 59,5 88 116 143 166
90 15,3 37 53 80 107 133 154
94 11 31,7 47,2 73 98,5 123 144
98 27 41,9 66,5 91 115 135
102 22,9 37,1 60,5 84,5 108 127
double hook block * 9 9 9 9 9 9 9 9
single hook block 11 11 11 11 11 11 11 11
DS-Code 0223000018 0223000018 0223000018 0223000018 0223000018 0223000018 0223000018 0223000018
Attention!
Loads in brackets () do not lift up the SL-counterweight from ground.
In case of runner mounted: reduce the load!
Reduce the load by the weight of runner and hook block on the runner!
If the jib suspension rods WU are on the main boom:
Reduce the load by the half weight of the rods!
only valid for "tele-SL".
Capacities only valid for the following number of sheave sets: 1 !
BOLT TYPE • Capacities 1/3 thru 150 metric tons. BOLT TYPE
• Working Load Limit permanently shown on every shackle.
ANCHOR • Forged — Quenched and Tempered, with alloy pins.
CHAIN
SHACKLES • Hot Dip galvanized or Self Colored. SHACKLES
Shackles
• Fatigue rated (1/3t - 55t).
• Shackles 25t and larger are RFID EQUIPPED.
• Crosby products meet or exceed all requirements of
ASME B30.26 including identification, ductility, design factor, proof load
and temperature requirements. Importantly, Crosby products meet other
critical performance requirements including fatigue life, impact
properties and material traceability, not addressed by ASME B30.26.
• Sizes 1/2t-25t meet the performance requirements of EN13889:2003.
• Shackles 55 metric tons and smaller can be furnished proof tested with
certificates to designated standards, such as ABS, DNV, Lloyds, or other
G-2130 S-2130 certification when requested at time of order. G-2150 S-2150
Bolt Type Anchor shackles with thin Bolt Type Chain shackles. Thin hex head
• Shackles 85 metric tons and larger can be provided as follows.
head bolt - nut with cotter pin. Meets the bolt - nut with cotter pin. Meets the
performance requirements of Federal • Non Destructive Tested performance requirements of Federal
Specification RR-C-271D Type IVA, • Serialized Pin and Bow Specification RR-C271D Type IVB, Grade
Grade A, Class 3, except for those provi- • Material Certification (Chemical) Certification must be A, Class 3, except for those provisions
sions required of the contractor. For requested at time of order. required of the contractors. For
additional information, see page 391. • Look for the Red Pin® . . . the mark of genuine Crosby quality. additional information, see page 391.
• Type Approval and certification in accordance with ABS 2006 Steel Vessel
Rules 1-1-17.7, and ABS Guide for Certification of Cranes.
s e l k c a h S e p y T t l o B ® y •b s o r C
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Major Projects Template MAJOR-ASY-MPQA-FOR-000004_Rev00 Dated 09/06/2018
Page 28 of 28
1
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 13-Apr-21 04
SUBJECT : LIFTING EH WHP JACKET ROW-1 PREP'D. BY CHECKED BY :
GROUND BEARING PRESSURE CRANE 650 (HK1) AH YM
Input Data
Weight Data :
Lift Weight include DAF W LF = 277.38 mT
Weight of Crawler W CR = 100.60 mT
Weight of Front Boom (60 M Boom Length) 63.73 Meter W FR = 64.57 mT
Weight of Rear Boom W RR = 16.18 mT
Weight of Super Structure W SS = 134.00 mT
Weight of Turntable Counter Weight W TC = 240.25 mT
Weight of Superlift Counter Weight W SC = 320.00 mT
Total Weight WTOT = 1,152.98 mT
Crane Data
Distance between the centerlines of tracks, dt dt = 8.80 m
Width of the bearing plate, w w = 3.20 m
Length of the bearing plate, l l = 12.00 m
2
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 13-Apr-21 04
SUBJECT : LIFTING EH WHP JACKET ROW-1 PREP'D. BY CHECKED BY :
GROUND BEARING PRESSURE CRANE 650 (HK1) AH YM
1. Trapezoidal Diagram
Reaction under the more heavily loaded track, Rh Reaction under the more lightly loaded track, Rl
WTOT W TOT x CoGXCOMB x Sin α WTOT W TOT x CoGXCOMB x Sin α
Rh = + Rl = -
2 dt 2 dt
Ground Bearing Pressure at Heavily Loaded Track, PH Ground Bearing Pressure at Lightly Loaded Track, PL
Rh 1 + (6.e) Rl 1 - (6.e)
PH = x PL = x
wxl l wxl l
Reaction under the more heavily loaded track, Rh Reaction under the more lightly loaded track, Rl
WTOT W TOT x CoGXCOMB x Sin α WTOT W TOT x CoGXCOMB x Sin α
Rh = + Rl = -
2 dt 2 dt
Ground Bearing Pressure at Heavily Loaded Track, PH Ground Bearing Pressure at Lightly Loaded Track, PL
Rh Rl
PH = PL =
lxw lxw
3. Triangular Diagram
Reaction under the more heavily loaded track, Rh Reaction under the more lightly loaded track, Rl
WTOT W TOT x CoGXCOMB x Sin α WTOT W TOT x CoGXCOMB x Sin α
Rh = + Rl = -
2 dt 2 dt
Ground Bearing Pressure at Heavily Loaded Track, PH Ground Bearing Pressure at Lightly Loaded Track, PL
2 x Rh 2 x Rl
PH = PL =
lxw lxw
Input Data
Weight Data :
Lift Weight include DAF W LF = 286.76 mT
Weight of Crawler W CR = 180.00 mT
Weight of Front Boom (114 M Boom Length) W FR = 84.18 mT
Weight of Rear Boom W RR = 30.00 mT
Weight of Super Structure W SS = 190.80 mT
Weight of Turntable Counter Weight W TC = 295.00 mT
Weight of Superlift Counter Weight W SC = 240.00 mT
Total Weight WTOT = 1,306.74 mT
Crane Data
Distance between the centerlines of tracks, dt dt = 10.50 m
Width of the bearing plate, w w = 3.00 m
Length of the bearing plate, l l = 14.45 m
2
CALCULATION SHEET
PROJECT : GALLAF BATCH 2 DATE : REV'N. :
EH WHP JACKET 13-Apr-21 04
SUBJECT : LIFTING EH JACKET ROW-1 PREP'D. BY CHECKED BY :
GROUND BEARING PRESSURE CRANE 1600T (HK2) ASW YND
1. Trapezoidal Diagram
Reaction under the more heavily loaded track, Rh Reaction under the more lightly loaded track, Rl
WTOT W TOT x CoGXCOMB x Sin α WTOT W TOT x CoGXCOMB x Sin α
Rh = + Rl = -
2 dt 2 dt
Ground Bearing Pressure at Heavily Loaded Track, PH Ground Bearing Pressure at Lightly Loaded Track, PL
Rh 1 + (6.e) Rl 1 + (6.e)
PH = x PL = x
wxl l wxl l
Reaction under the more heavily loaded track, Rh Reaction under the more lightly loaded track, Rl
WTOT W TOT x CoGXCOMB x Sin α WTOT W TOT x CoGXCOMB x Sin α
Rh = + Rl = -
2 dt 2 dt
Ground Bearing Pressure at Heavily Loaded Track, PH Ground Bearing Pressure at Lightly Loaded Track, PL
Rh Rl
PH = PL =
lxw lxw
3. Triangular Diagram
Reaction under the more heavily loaded track, Rh Reaction under the more lightly loaded track, Rl
WTOT W TOT x CoGXCOMB x Sin α WTOT W TOT x CoGXCOMB x Sin α
Rh = + Rl = -
2 dt 2 dt
Ground Bearing Pressure at Heavily Loaded Track, PH Ground Bearing Pressure at Lightly Loaded Track, PL
2 x Rh 2 x Rl
PH = PL =