You are on page 1of 18

Site Survey

Report Metro
Tasek

CELCOM NETWORK SDN BHD

SITE SURVEY REPORT

SITE NAME : TASEK

LOC ID : A00104

DATE SURVEY : 23/5/2019

Site Survey Report 1 of 19


Huawei Technologies (M) Sdn
Bhd
SITE SURVEY REPORT
Project Name DWDM Metro Northern Region
LOA No.
Equipment Model OSN9800
Site ID A00104 Site Name Tasek
Survey Start Date 23/05/2019 End date 23/05/2019

1.0 SITE INFORMATION

CONTACT/ADDRESS INFORMATION

Site Address Kolam Air Tasek, 31400 Ipoh, Perak (4.644700,101.089000)

Site Personal Zainoddin


019-5578900
Contact no

E-PTW NO

W/S Number

SURVEYOR PARTICULAR

No Person Name IC Number Phone Number Company/Department

1. Mohd Firdaus Bin Othman 870919-14-5993 019-2785700 FO&T

2.

3.

4.

5.
Site Survey
Report Metro
Tasek

WE HAD CHECKED, VERIFY AND CONFIRMED THAT ALL THE PARTICULARS IN THIS
SURVEY ARE ACCORDINGLY TO STANDRAD AS AGREED BETWEEN CELCOM (NETWORK
SDN BHD AND HUAWEI TECHNOLOGIES (M) SDN BHD AS PER STIPULATED IN THE LOA

HUAWEI TECHNOLOGIES MALAYSIA SDN BHD


CHECKED AND CONFIRMED BY
Name Muhammad Zulhilmi Hashim (013-9832310)

Designation Project Engineer

Signature & Date


30/7/2019

Celcom Network Sdn Bhd (PIC IMPLEMENTATION)


Approved By
Name
Designation

Signature & Date

Celcom Network Sdn Bhd (PIC OPERATION)


Approved By
Name
Designation

Signature & Date


Site Survey
Report Metro
Tasek

2.0 SITE SURVEY SUMMARY CHECKLIST

Meter New Power


DCPDB/Rect. Existing Breaker
Power Rectifier Type Reading DCPDB Breaker Cable Remarks
Slot Balance (Amp)
(Amp) (Amp) (mtr)

Attached NA Propose to power up


4x125A,3x16A,3x32A,
Brand HUAWEI to NA NA DCPDB A and
1x10A,2x20A
rectifier reserve 2x63A for
(SYS A) 57.2 DWDM and 2x32A
for Agg B
2x62A
Rating (V) 53.8 Yes NA NA 2x32A 15

Proposed to replace
Attached 2x125A,2x10A, 2x62A 2x10A with 2x63A
Brand AGISSON to NA 2x16A, 2x80A, 1x32A 15 breaker for DWDM.
rectifier 2x20A,1x32A Proposed to replace
(SYS B) 44.2 1x20A with 1x32A for
Agg B Rectifier B
Rating (V) 55 NA NA NA NA NA

EARTHING (PGND) REQUIREMENT


Existing bar New bar GND cable
Item ready to use required length (m) Remarks
Reserved GND termination at
EQPT RACK Yes No 15
existing MGB

PHYSICAL STRUCTURE REQUIREMENT


Existing ready New installation
Item to use required Remarks
Proposed new 1 x ETSI Rack
ETSI Rack No Yes
(2200x600x300)mm
Vertical Cable ladder Yes No
Horizontal Cable tray/ladder Yes No
Top fixing (ladder) from eqpt rack Yes No

Fiber patch cord cable trunk (yellow) No No


OTHER CABLE REQUIREMENT
Patch Cord Type Length (m) Quantity (pc) Remarks
LC/PC – E2K/PC 10m 4pcs Proposed 1unit new Service ODF 24port

LC/PC – LC/PC

RJ45

CAT6

ATTENUATOR

POWER CABLE 15mtr 4 2 Blue & 2 Black (Power A)

POWER CABLE 15mtr 4 2 Blue & 2 Black (Power B)

OPTICAL DISTRIBUTION FRAME (ODF) REQUIREMENT

Existing ready New installation


Item to use required Remarks

ODF Rack Yes No


Proposed 1unit new Service
ODF Panel Yes Yes
ODF 24port
PORT/ CORE AVAILBILITY Yes No .OSP ODF
3.0 ACCESS AND ENVIRONMENT INFORMATION

Site Information Summary

1. New 1xETSI OSN 9800 (2200x600x300)mm rack will be installed at proposed location. Please refer to
photo & drawing
2. Power A - Propose to power up DCPDB A and reserve 2x63A for DWDM and 2x32A for Agg B
3. Rectifier B - Proposed to replace 2x10A with 2x63A breaker for DWDM. Proposed to replace 1x20A with
1x32A for Agg B
4. Proposed new 1xODF panel (24port) for services at existing Open Rack
5. Proposed to test 4 cores facing direction 1 as per topo design
6. Proposed to test 4 cores facing direction 2 as per topo design
7. Reserved GND termination in existing GND Busbar
Site Survey
Report Metro
Tasek

OPTICAL DISTRIBUTION FRAME (ODF) INFORMATION


LINK NAME (ODF 1) TASEK-PMX-LABROOY
PORT PORT
AVAIL REMARKS AVAIL REMARKS
NUMBER NUMBER
PORT 1 Yes PORT 25 Yes

PORT 2 Yes PORT 26 Yes

PORT 3 Yes PORT 27 Yes

PORT 4 Yes PORT 28 Yes

PORT 5 Yes PORT 29 Yes

PORT 6 Yes PORT 30 Yes

PORT 7 Yes PORT 31 Yes

PORT 8 Yes PORT 32 Yes

PORT 9 Yes PORT 33 Yes

PORT 10 Yes PORT 34 Yes

PORT 11 Yes PORT 35 Yes

PORT 12 Yes PORT 36 Yes

PORT 13 Yes PORT 37 Yes

PORT 14 Yes PORT 38 Yes

PORT 15 Yes PORT 39 Yes

PORT 16 Yes PORT 40 Yes

PORT 17 Yes PORT 41 Yes

PORT 18 Yes PORT 42 Yes

PORT 19 Yes PORT 43 Yes

PORT 20 Yes PORT 44 Yes

PORT 21 Yes PORT 45 No TRUNK TO LABROOY

PORT 22 Yes PORT 46 No TRUNK TO LABROOY

PORT 23 Yes PORT 47 Yes

PORT 24 Yes PORT 48 Yes


OPTICAL DISTRIBUTION FRAME (ODF) INFORMATION
LINK NAME (ODF 2) 3036-TSEK-PTN1
PORT PORT
AVAIL REMARKS AVAIL REMARKS
NUMBER NUMBER
PORT 1 Yes PORT 25 Yes

PORT 2 Yes PORT 26 Yes

PORT 3 Yes PORT 27 Yes

PORT 4 Yes PORT 28 Yes

PORT 5 Yes PORT 29 Yes

PORT 6 Yes PORT 30 Yes

PORT 7 Yes PORT 31 Yes

PORT 8 Yes PORT 32 Yes

PORT 9 No PTN TO K. JAYA PORT 33 Yes

PORT 10 No PTN TO K. JAYA PORT 34 Yes

PORT 11 Yes PORT 35 Yes

PORT 12 Yes PORT 36 Yes

PORT 13 Yes PORT 37 Yes

PORT 14 Yes PORT 38 Yes

PORT 15 Yes PORT 39 Yes

PORT 16 Yes PORT 40 Yes

PORT 17 No PTN TO MERU PORT 41 Yes

PORT 18 No PTN TO MERU PORT 42 Yes


PTN TO
PORT 19 No PORT 43 Yes
KLEBANG
PTN TO
PORT 20 No PORT 44 Yes
KLEBANG
PORT 21 Yes PORT 45 Yes

PORT 22 Yes PORT 46 Yes

PORT 23 Yes PORT 47 Yes

PORT 24 Yes PORT 48 Yes

Site Survey Report 8 of 19


Huawei Technologies (M) Sdn
Bhd
OPTICAL DISTRIBUTION FRAME (ODF) INFORMATION
LINK NAME (ODF 3) TASEK TO SG SIPUT/KLEBANG JAYA/CHEMOR 2/CHEPOR
PORT PORT
AVAIL REMARKS AVAIL REMARKS
NUMBER NUMBER
PORT 1 Yes PORT 25 Yes

PORT 2 Yes PORT 26 Yes

PORT 3 Yes PORT 27 Yes

PORT 4 Yes PORT 28 Yes

PORT 5 Yes PORT 29 Yes

PORT 6 Yes PORT 30 Yes

PORT 7 Yes PORT 31 Yes

PORT 8 Yes PORT 32 Yes

PORT 9 Yes PORT 33 No PTN TO CHEMOR

PORT 10 Yes PORT 34 No PTN TO CHEMOR

PORT 11 Yes PORT 35 No NO LABEL

PORT 12 Yes PORT 36 No NO LABEL

PORT 13 Yes PORT 37 Yes


DWDM SG SIPUT
PORT 14 No PORT 38 Yes
- PMX
DWDM SG SIPUT
PORT 15 No PORT 39 Yes
- PMX
PORT 16 Yes PORT 40 Yes

PORT 17 Yes PORT 41 Yes

PORT 18 Yes PORT 42 Yes

PORT 19 Yes PORT 43 No NO LABEL

PORT 20 Yes PORT 44 No NO LABEL

PORT 21 Yes PORT 45 Yes

PORT 22 Yes PORT 46 Yes

PORT 23 Yes PORT 47 Yes

PORT 24 Yes PORT 48 Yes


Site Survey
Report Metro
Tasek

OPTICAL DISTRIBUTION FRAME (ODF) INFORMATION


LINK NAME (ODF 4) PMX MERU TO TASEK
PORT PORT
AVAIL REMARKS AVAIL REMARKS
NUMBER NUMBER
PORT 1 Yes PORT 25 Yes

PORT 2 Yes PORT 26 Yes

PORT 3 Yes PORT 27 Yes

PORT 4 Yes PORT 28 Yes

PORT 5 Yes PORT 29 Yes

PORT 6 Yes PORT 30 Yes

PORT 7 No MERU OSN PORT 31 Yes

PORT 8 No MERU OSN PORT 32 Yes

PORT 9 No PTN TO MERU PORT 33 Yes

PORT 10 No PTN TO MERU PORT 34 Yes

PORT 11 Yes PORT 35 Yes

PORT 12 Yes PORT 36 Yes

PORT 13 Yes PORT 37 Yes

PORT 14 Yes PORT 38 Yes

PORT 15 Yes PORT 39 Yes

PORT 16 Yes PORT 40 Yes

PORT 17 Yes PORT 41 Yes

PORT 18 Yes PORT 42 Yes

PORT 19 Yes PORT 43 Yes

PORT 20 Yes PORT 44 Yes

PORT 21 Yes PORT 45 Yes

PORT 22 Yes PORT 46 Yes

PORT 23 Yes PORT 47 Yes

PORT 24 Yes PORT 48 Yes

Site Survey Report 10 of 19


Huawei Technologies (M) Sdn
Bhd
Site Survey
Report Metro
Tasek
Cabin Overview Cabin Overview

Ca.b in Overview Cabin Overview


Site Survey Report 18 of 19
Huawei Technologies (M) Sdn
Bhd
Dimension ETSI Rack = 2200mm x 600mm x
300mm

1. Proposed ETSI rack location 2. Proposed location to install new ETSI rack

Site Survey Report 13 of 19


Huawei Technologies (M) Sdn
Bhd
3. Existing Open Rack 4. Proposed to install 1xODF panel in existing
Open Rack.
5. Existing Rectifier Huawei 1 with Power Module 6. Load Display Rectifier Huawei 1 (57.2 A)
& Battery

7. Rectifier Huawei 1 – Existing breaker 8. Propose to power up DCPDB A and reserve 2x63A
for DWDM and 2x32A for Agg B

Site Survey Report 15 of 19


Huawei Technologies (M) Sdn
Bhd
Site Survey
Report

9. Load Display Agisson rectifier ( 44.2 A) 10. Power Module rectifier Agisson

Site Survey Report 16 of 19


Huawei Technologies (M) Sdn
Bhd
11. Proposed to replace 2x10A with 2x63A breaker 12. Reserved GND termination point
for DWDM. Proposed to replace 1x20A with 1x32A