Report Metro
Tasek
LOC ID : A00104
CONTACT/ADDRESS INFORMATION
E-PTW NO
W/S Number
SURVEYOR PARTICULAR
2.
3.
4.
5.
Site Survey
Report Metro
Tasek
WE HAD CHECKED, VERIFY AND CONFIRMED THAT ALL THE PARTICULARS IN THIS
SURVEY ARE ACCORDINGLY TO STANDRAD AS AGREED BETWEEN CELCOM (NETWORK
SDN BHD AND HUAWEI TECHNOLOGIES (M) SDN BHD AS PER STIPULATED IN THE LOA
Proposed to replace
Attached 2x125A,2x10A, 2x62A 2x10A with 2x63A
Brand AGISSON to NA 2x16A, 2x80A, 1x32A 15 breaker for DWDM.
rectifier 2x20A,1x32A Proposed to replace
(SYS B) 44.2 1x20A with 1x32A for
Agg B Rectifier B
Rating (V) 55 NA NA NA NA NA
LC/PC – LC/PC
RJ45
CAT6
ATTENUATOR
1. New 1xETSI OSN 9800 (2200x600x300)mm rack will be installed at proposed location. Please refer to
photo & drawing
2. Power A - Propose to power up DCPDB A and reserve 2x63A for DWDM and 2x32A for Agg B
3. Rectifier B - Proposed to replace 2x10A with 2x63A breaker for DWDM. Proposed to replace 1x20A with
1x32A for Agg B
4. Proposed new 1xODF panel (24port) for services at existing Open Rack
5. Proposed to test 4 cores facing direction 1 as per topo design
6. Proposed to test 4 cores facing direction 2 as per topo design
7. Reserved GND termination in existing GND Busbar
Site Survey
Report Metro
Tasek
1. Proposed ETSI rack location 2. Proposed location to install new ETSI rack
7. Rectifier Huawei 1 – Existing breaker 8. Propose to power up DCPDB A and reserve 2x63A
for DWDM and 2x32A for Agg B
9. Load Display Agisson rectifier ( 44.2 A) 10. Power Module rectifier Agisson