This document provides a schedule of quantities for civil works for an IOCL bottling plant project in KHORDHA, Odisha. It includes items like dry stone rubble soling 230mm thick over an area of 256.63 sqm at a rate of Rs. 499.65 per sqm. It also includes providing and injecting chemical emulsion for pre-construction antitermite treatment over an area of 660.45 sqm at a rate of Rs. 118.90 per sqm. The document gives the item descriptions, units, quantities, rates, and total amounts for various civil works items.
This document provides a schedule of quantities for civil works for an IOCL bottling plant project in KHORDHA, Odisha. It includes items like dry stone rubble soling 230mm thick over an area of 256.63 sqm at a rate of Rs. 499.65 per sqm. It also includes providing and injecting chemical emulsion for pre-construction antitermite treatment over an area of 660.45 sqm at a rate of Rs. 118.90 per sqm. The document gives the item descriptions, units, quantities, rates, and total amounts for various civil works items.
This document provides a schedule of quantities for civil works for an IOCL bottling plant project in KHORDHA, Odisha. It includes items like dry stone rubble soling 230mm thick over an area of 256.63 sqm at a rate of Rs. 499.65 per sqm. It also includes providing and injecting chemical emulsion for pre-construction antitermite treatment over an area of 660.45 sqm at a rate of Rs. 118.90 per sqm. The document gives the item descriptions, units, quantities, rates, and total amounts for various civil works items.
SCHEDULE OF QUANTITIES CIVIL WORKS PACKAGE-B Sl.No Description Unit QTY. RATE Total Amount RATE Total Amount C.1.02.08 Dry stone rubble soling thk Sqm 256.63 499.65 1,28,225.18 403.72 1,03,605.95 Dry stone rubble soling 230 mm thick / 300 (Compacted thickness) with maximum 200 mm size hard stones set in regular lines, hand packed and interstices thoroughly filled with small stone chips including compaction by plate compactor and filling in with good quality murum brought from outside and compacted as directed and spreading 12 mm - - - compacted layer of murum on top. projection of rubble soiling should be 300mm all around from the edge of foundation (Net Bottom Area of Foundation as per drawing will Be Paid).
Providing and injecting chemical emulsion for pre-construction antitermite treatment and creating a chemical barrier ( through agency approved by Owner). Using Chloropyriphos Emulsifiable 1.0 % concentration by weight under and all- around foundation pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor, along the external perimeter of building atleast 2meter all around the - - - outer face of plinth area , expansion joints, surrounding of pipes, water conduits or at places suggested by Engineer etc. ( Plinth Area at ground floor shall be measured for payment).