DOCUMENT CLASS: 2
Task Risk Assessment (TRA) for Erection of No.1 Sulphur Storage
DOCUMENT DESCRIPTION / TITLE :
Tank (Tag No. 750TK-001) by Conventional Method
EQUIPMENT TAG NUMBERS : 750TK-001
TOTAL NUMBER OF SHEETS :
37
(Including this coversheet)
DUQM REFINERY
Company Approval Status
Status :
Signed :
Dept :
Date :
COMMENT STATUS CODE: A-Accepted; B-Accepted With Comments
C-Reviewed with Comments; D-No Comments; E-Rejected
PURCHASER APPROVAL STATUS
Approval
Status Contractor Approval Code Description
Code
1 REJECTED. REVISE & RESUBMIT. WORK MAY NOT PROCEED.
MAJOR COMMMENTS AS NOTED.
2 REVISE & RESUBMIT. WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS
INDICATED.
ACCEPTABLE. INCORPORATE MINOR COMMENTS (IF ANY). RESUBMIT AS CERTIFIED FINAL.
3
WORK MAY PROCEED.
Reviewing Engineer’s Full Name (IN BLOCK LETTERS), Sign and Date
Purchaser’s review of this document does not relieve Vendor of the responsibility for correctness under the Subcontractor Order.
Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or materials developed or selected
by the Subcontractor and does not relieve the Subcontractor from full compliance with the Subcontractor Order or any other obligations,
nor detract from any of the Purchaser’s rights.
Revision History
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
1.2 Preparatory Incompetent and untrained Personal Injuries 3 3 9 First Aid Training (First Aider) Low
work site Workers Rigging and lifting operation awareness Adequate monitoring
(Storage Property Damage Medium training for all lifting equipment
Tank operators and Riggers.
Fabrication) A competent flagman man with
fluorescent jacket and two (Red and
Green) flags shall be deployed.
Location and route shall be surveyed.
2 Transportation
2.1 Transportatio Collision of vehicle Injury 5 3 15 Follow traffic management procedure. Low
n of Overturning, run over Ensure vehicle are in a good and road Emergency
Personnel Ejecting out of the Burn High worthy condition. Preparedness and
Men, Material vehicles Ensure No hand held equipment is Medevac
Fatality
& Equipment. Dust used while driving.
Fire & Explosions Property Damage Ensure driver competency as required
Fuel / oil spill by the project
Straying of material
Page 2 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 3 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 4 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 5 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 6 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 7 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 8 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 9 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 10 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 11 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Rotating parts of power tools Ensure bottles cylinders are stored and
grinding wheel. secured up right and hose & valves in
Exposure to heat (including good condition
direct sunlight) Ensure flash back arrester fitted.
Dropping of cylinders / Use specific P.P.E (Fire proof apron/
Damaged valves. gloves/ screen, etc.)
Incorrect storage and Required number of suitable fire
transportation of cylinders extinguishers shall be kept available
Electrocution near the welding/grinding booths.
Not qualified/ not competent Trained Fire watchers shall be
personnel performing the provided to monitor hot work and
tasks initiate basic firefighting when
required and shutdown welding
machines, generators in case of
emergencies.
Provide proper clamp and support
Keep work place clean and no
combustible material in work area.
All welding cables, hoses, valves
and connections are to shall be
inspected for defects prior to use
for defects by competent person.
Loose connections may lead to
cable heating and melting.
Hoses are to be used for one kind
of gas only. E.g. Acetylene and
oxygen hoses are not to be
Page 12 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 13 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 14 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 15 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
8.1 Using Fall from height Injury 4 3 12 Access ladder is properly secured Low
Ladder Awkward work posture, at top and bottom
strain, Fatality Medium Ladder shall be inspected prior to First aider
slip & fall each use.
Do not use a ladder that has Medevac
cracks, loose or corroded rivets,
defective braces, or parts
(including the slip resistant feet)
that are in poor condition. Make
sure it is free of grease or oil or
other slippery substances.
For stepladders, open the
stepladder spreaders and shelf
fully and lock the braces.
Check stability. Ensure that all
ladder feet are on a firm, level and
non-slippery surface.
Place a stepladder at right angles
to the work, with either the front or
back of the steps facing the work.
Keep the stepladder close to the
work.
Face the stepladder when climbing
up or down. Keep body centered
between side rails.
Page 16 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
8.2 Scaffolding Faulty – substandard Personal Injury 4 4 16 Standard scaffold materials will only be Low
erection, use, scaffold material used for scaffolding erection. Emergency
and Fall from height Fatality High Check the ground condition. if Preparedness and
dismantling Struck by falling object Property Damage necessary, compact the same. Medevac
Exposed to Line of Fire Wear proper PPE. Insists to use the
helmet with proper chin strap.
Area needs to be barricaded and
proper signs need to be placed
Only certified scaffolders engage in
scaffolding erection and dismantling
activity under competent supervision
Use double lanyard full body safety
harness and 100% tie off.
Use proper anchorage point on
scaffold.
Do not over load the scaffold.
Ensure ladder properly secured.
Scaffold shall be inspected by third
party certified competent scaffolding
inspector and tagged.
Page 17 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 18 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 19 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
9.1 Erection of Failure of Hydraulic Jack Personal Injury 4 3 12 Ensure hydraulic jack lifting
Tank shell by Overloading of Jack operation should be done by
Hydraulic Lifting of cleat Broken/cracks Property Damage Medium competent and experience person.
Jack Damage of Hydraulic hoses PTW system should be follow
Fire & Explosion Visual inspection of hydraulic jack
Faulty of Electrical conducted by competent person.
Connection Ensure that jack should work
properly as per capacity and install
as per specification.
Jack should be installed in equal
space with proper alignment and
ensure that if one jacks with fail the
nearby two jacks should near the
load.
Maintain distance from pressurized
jacks/equipment.
Calculating the load of the tank and the
jack capacity should be two times the
divided load.
Provide proper size of cleats which
should bear the calculated load
Ensure all the cleats welding should be
done properly.
Working materials should be handled
properly and this should not fall on the
working hoses.
Ensure all hydraulic connection are free
of leakage.
Page 20 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 21 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 22 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 23 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 24 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
11 Hydrostatic Testing
11.1 Hydrostatic Pressure stored inside tank. Personal Injury 4 4 16 All hydrostatic test equipment is Low
Testing, standing / exposed to / in the TPC and approve for use by PSJV. Emergency
vacuum test line of fire Fatality High preparedness and
Pressure testing working team shall
lack of communication, medevac
complete the awareness training on
hazard awareness Property damage
“Line of Fire”.
lack of work supervision and
safety monitoring All potential Line of Fire (LoF)
unsafe / substandard hazards shall be identified and
gauges, equipment, highlighted in daily TBT to all
materials, etc. working crews involves prior to
haste, not following safe pressure testing.
procedures
lack of attention
All potential Line of Fire shall be
Incompetent workers,
properly demarcated and
supervision awareness warning sign posted.
Mechanical failure
Ensure TBT and safety training to
Lines burst due to faulty
prevent Caught in between and
gauge & testing equipment other activity related hazards and
Unauthorized entry into test
exposed to line of fire.
area Ensure activity related hazards
pictorial signage at the work
location.
Page 25 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
12.1 Abrasive Flying particles due to sand 5 3 15 Remove unsafe slipping tripping Low
Surface blasting Injury, and fall hazards. First Aider
Preparation Breathing dust and vapour Occupational High Use full body harness with 100%
and Painting Fire disease, tie off with approved lanyard while
Slip, Trip and Fall Property Damage working above 2 meter.
Improper use of tools / Follow MSDS guidelines for
equipment chemicals
Use of chemicals Avoid skin and eye contact.
Eye wash station to be available
Page 26 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 27 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
13.1 Working in Oxygen-Deficiency Injury 4 4 16 Obtain PTW and confined space Stand by ERT
Confined Fire & Explosion entry certificate. Emergency
Space Toxic atmosphere Fatality Conduct Toolbox meeting. Low Preparedness and
Noise and Heat Appropriate means of clear Medevac
Poor visibility Property Damage communication to be established
Difficulty of access and Only trained and experienced
egress workers shall perform the job.
Inadequate knowledge about Check and ensure sufficient level
confined Space Conditions of oxygen before entry.
Inadequate communication/ Entry attendants know his
Miscommunication responsibilities, log in/out register
should be available. Gas test to be
carried out before every entry.
Available means of emergency
response should be readily
available.
Use of BA when necessary.
Never smoke while inside confined
space.
Isolate all equipment from all source
of energy when not in use.
Firefighting equipment with trained
personnel readily available in the
area.
Page 28 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 29 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
(animals, reptiles, rodents, Soil Contamination Work break will be followed as per Emergency
Bacteria etc) ministry decision and Omani Labour Preparedness and
Law during summer period. Medevac
If bad weather conditions hinder
visibility or workability, job to be put on
hold until conditions improve
First aid box must be available at the
close proximity of work area. First aid
will only be provided by qualified first
aider
First aider must be available at site.
Eating food inside work location is
prohibited. Food remains that can
attract animals shall not be thrown on
the ground
No horseplay with animals.
Look for reptiles under the stacked
materials.
Appropriate PPE
Heat stress awareness training should
be provided to all employees.
Drip tray shall be provided.
Re-fuelling shall be performed only by
trained and competent workers using
approved methods
Adequate number and type of fire
extinguishers to be made available at
sight
Page 30 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 31 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
17.1 Manlift Failure of Equipment Personal Injury 4 3 12 Man, lift shall be inspected and Low
Operation Fall from height certified by the third party certifying
Collision Fatality Medium competent person before
Overturn
Page 32 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
18 COVID -19
Page 33 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
18.1 COVID 19 All persons are at risk of Potential risks vary 4 4 16 Ensure a 2-metre Physical
infection that may have from mild cold distancing rule shall always be
various outcomes including symptom to death followed.
transmission to others both No unauthorized or unnecessary
at the work environment and visitors shall visit the site.
outside of it. Prevention and awareness to
COVID-19 shall be highlighted in
daily TBT or Onsite training.
Ensures all personnel shall always
adhere to mandatory use of face
mask.
Any personnel that are having high
temperature, (fever) or suffering
from cold like symptoms shall not
attend the site unless receives a
medical clearance certificate
confirming negative result from
MOH.
Any personnel that developed high
temperature (fever) or suffered
cold like symptoms at site must be
isolated and shall be subjected to
undergo medical examination.
Personnel that have high
temperature (fever) or suffer cold
like symptoms will be asked to
follow current MOH isolation
guidelines and protocols.
Page 34 of 35
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 35 of 35