(LPK –TMI)
Online Workshop
25, 27 – 28 May 2021
Instructor / Facilitator:
Ir. Daru Wiyono, IPU
Received bachelor degree in Chemical Engineering from Engineering Faculty, Gadjah Mada University (UGM). He has
a professional and practice experiences as Senior Process Engineer / Senior Resident Engineer / Engineering
Manager / Commissioning Coordinator more than 35 years in both National and Multinational Company specially Oil
& Gas Onshore , Offshore Industries and Water Treatment Plant (WTP). He works at various engineering company
and operating oil company in Indonesia and overseas: PETRONAS Carigali, PT. ELNUSA, PT. PETROSEA Tbk, CNOOC
(China National Offshore Oil Corporation) SES Ltd, Ranhill Worley Parson Sdn. Bhd., Malaysia, PT. Enerkon, PT
Synergy Engineering and PT. Kelsri. Implementing both International and National best practice of safety.
Email : daru.wiyono@gmail.com
HP : 08121399761
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
AGENDA
Day 1
1. Introduction to ” Sistem Penyediaan Air Minum (SPAM)”
2. Feasibilty Study
3. Feasibilty Study – SPAM Case Study
4. Conceptual Design
Day 2
5. Front End Engineering Design (FEED)
6. Front End Engineering Design (FEED) – SPAM Case Study
7. Detailed Engineering Design (DED)
8. Procurement
Day 3
9. Construction
10. Engineering, Procurement & Construction (EPC)
11. Start Up & Commissioning and Performance Test
12. Operation
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
REINJECTION INJECTION
GAS WELLS
GAS
SEPARATOR
NEW
SLUGCATCHER
PROD
WELLS
WEST TUNA
INSTALLATION BARGE REQUIRED
Conceptual Design
TURRUM
PLATFORM
DSV FOR TRUSS INSTALLATION
Power Cable
Fuel Gas?
Glycol
Flowline (insulated)
COMPANY : PC
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
Outline
1.0 Facility Overview
4.2 Utilities
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
Ketapang PSC
Java Sea
Bukit Tua
Facilities
Field JS 2-1 JS 3-1
Garit-1
Payang-1
Bukit Tua-3A
JS 8-1
Bukit Panjang-1
Perawan-1
JS 19-1
JS44A-1
~ 30 km to land
ik ~30km to Madura
es
Gr
to Madura
East
East ~9
0k
m Madura
Gresik
Java
Java
Surabaya
20
20km
km
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PIG RECEIVER
PIG RECEIVER
21
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
INLET SEPARATOR
Description Requirement
INLET SEPARATOR
23
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
Description Requirement
Type Ultrasonic
Capacity (MMscfd) 77
Fuel Gas Scrubber Fuel Gas Filter Separator Fuel Gas Superheater Instrument Gas Receiver
Equipment
(V-6060) (S-6060A/B) (E-6060) (V-6070)
Size (mm) 1800 (ID) x 4500 (T/T) 273 (OD) x 2845 (S/S) - 1950 (ID) x 4900 (T/T)
Description Requirement
CLOSED DRAIN/
FLARE KO DRUM
27
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
OPEN
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
29
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PFD OVERVIEW
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PFD PURPOSE
A schematic illustration of the system
Shows the relationships between the major components in the system
PFD should include :
Process Piping
Major equipment symbols, names and identification number
Control valves and valves that affect operation of the system.
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PFD PURPOSE
Interconnection with other systems
Major bypass and recirculation lines
System ratings and operational values as minimum, normal and
maximum flow, temperature and pressure
Composition of fluids
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PFD CONTENT
PFD CONTENT
Major process equipment
Major process and utility streams – all numbered
Major process controls necessary to operate the process
Operating temperatures
Operating pressures
Operating flows
Equipment sizes
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PFD CONTENT
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PFD SAMPLE
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PFD SAMPLE
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PFD SYMBOLS
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
P&ID EXAMPLE
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PURPOSE OF P&ID
P&ID show all mechanical equipment, piping, valving, etc. and their
interconnections.
P&IDs also show how the process or plant will achieve the required
functions through monitoring and control
PURPOSE OF P&ID
EQUIPMENT DESCRIPTION
Equipment number/title/description blocks shall be
placed at the following locations:
all pumps along bottom of sheet
all other equipment along top of sheet
Other names
– Engineering Flow Diagram (EFD)
– Mechanical Flow Diagram (MFD)
– Utility Flow Diagram (UFD)
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
EQUIPMENT DESCRIPTION
Equipment number labels follow notation :
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
EQUIPMENT DESCRIPTION
LINES
VESSEL
EQUIPMENT NUMBER
DESCRIPTIVE TITLE
NOMINAL DIAMETER (mm) & TAN TO TAN LENGTH (mm)
DESIGN PRESSURE AND TEMPERATURES
INSULATION (SYMBOL FOR TYPE OR “NONE”)
TRIM PIPING
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
VESSEL
EXAMPLE:
V-2602
LP HYDROGEN SURGE DRUM
NOMINAL: 1800 ID 3000 T/T
DESIGN: 500 kPag @ 250°C
20kPa.A @ 100°C
INSULATION H
TRIM: VT-0001-BA1-H
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
VESSEL
Show height of normal liquid level and alarm or switch levels
HHLL HIGH HIGH LIQUID LEVEL – FOR SHUTDOWN CASE
HLL HIGH LIQUID LEVEL – ALARM
NLL NORMAL LIQUID LEVEL
LLL LOW LIQUID LEVEL - ALARM
LLLL LOW LOW LIQUID LEVEL –FOR SHUTDOWN CASE
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
HEATER
Show at top of flow diagram above heater outline,
the following information:
EQUIPMENT NUMBER
DESCRIPTION TITLE
FIRED DUTY kW
EXAMPLE:
X-2402
RECYCLE GAS HEATER
FIRED DUTY: 5000 kW
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
HEATER
Show at top of flow diagram above heater outline,
the following information:
EQUIPMENT NUMBER
DESCRIPTION TITLE
FIRED DUTY kW
EXAMPLE:
X-2402
RECYCLE GAS HEATER
FIRED DUTY: 5000 kW
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
COOLER
EXAMPLE:
X-3001
BUTANE RUNDOWN COOLER
DUTY: 530 kW
DESIGN: 2100 kPag @ 300ºC
FULL VAC @ 90ºC
FANS: TOTAL 2, 15 kW EACH
INSULATION: NONE
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
EQUIPMENT NUMBER
DESCRIPTIVE TITLE
DESIGN DUTY kW
SHELL DESIGN PRESSURE AND TEMPERATURE
TUBE DESIGN PRESSURE AND TEMPERATURE
INSULATION
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
PUMP
Show at bottom of flow diagram below the
pump(s), the following:
EQUIPMENT NO.
DESCRIPTIVE TITLE
DUTY / STANDBY
DESIGN: m3/h (FLOWING TEMPERATURE)
DESIGN DIFFERENTIAL PRESSURE: kPa
MOTOR kW
INSULATION (SYMBOL FOR TYPE OR “NONE”)
COOLING WATER, FLUSHING OIL, SEAL OIL, ETC.
REQUIRED WITH TYPE OF API PLANS INDICATED
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
C-2102
DRY GAS COMPRESSOR
DESIGN CAPACITY: 92 Nm3/h
ΔP: 700 kPa
MOTOR: 95 kW