CONCEPTUAL DESIGN
Instructor / Facilitator:
Ir. Daru Wiyono, IPU
Received bachelor degree in Chemical Engineering from Engineering Faculty, Gadjah Mada University (UGM). He has
a professional and practice experiences as Senior Process Engineer / Senior Resident Engineer / Engineering
Manager / Commissioning Coordinator more than 35 years in both National and Multinational Company specially Oil
& Gas Onshore , Offshore Industries and Water Treatment Plant (WTP). He works at various engineering company
and operating oil company in Indonesia and overseas: PETRONAS Carigali, PT. ELNUSA, PT. PETROSEA Tbk, CNOOC
(China National Offshore Oil Corporation) SES Ltd, Ranhill Worley Parson Sdn. Bhd., Malaysia, PT. Enerkon, PT
Synergy Engineering and PT. Kelsri. Implementing both International and National best practice of safety.
Email : daru.wiyono@gmail.com
HP : 08121399761
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
AGENDA
Day 1
1. Introduction to ” Sistem Penyediaan Air Minum (SPAM)”
2. Feasibilty Study
3. Feasibilty Study – SPAM Case Study
4. Conceptual Design
Day 2
5. Front End Engineering Design (FEED)
6. Front End Engineering Design (FEED) – SPAM Case Study
7. Detailed Engineering Design (DED)
8. Procurement
Day 3
9. Construction
10. Engineering, Procurement & Construction (EPC)
11. Start Up & Commissioning and Performance Test
12. Operation
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
REINJECTION INJECTION
GAS WELLS
GAS
SEPARATOR
NEW
SLUGCATCHER
PROD
WELLS
WEST TUNA
INSTALLATION BARGE REQUIRED
Conceptual Design
TURRUM
PLATFORM
DSV FOR TRUSS INSTALLATION
Power Cable
Fuel Gas?
Glycol
Flowline (insulated)
1. Introduction
2. Background
3. Study Objectives
4. Conclusions
5. Basis of Study
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
CONCEPTUAL DESIGN
FOR
BUKIT TUA DEVELOPMENT PROJECT KETAPANG PSC
EAST JAVA, INDONESIA
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
Content
Introduction
Background
Study Objectives
Conclusions
Basis of Study
- Pipeline Route
- Exsiting Company H Sales Gas Pipeline Data
- Pipeline Burial Depth
- Environmental Conditions
- Analysis Method
- Design Data
- ORF Sales Gas Specifications
- ORF Sales Gas Data at Company H Baterry Limit
- Boundary Conditions
- Production Rate and Fluids Basis
- Design Input Summary
- Line Sizing
- ORF Sales Gas Pipeline
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
INTRODUCTION
• Company PC plans to develop the Bukit Tua Field, in the Ketapang Block, East Java. Bukit Tua
• Located 35 km north of Madura Island and 110 km northeast of Gresik at a water depth of approximately 57 m.
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
MIE
8 km
PLNE
BACKGROUND
• Company PC to study of selling Bukit Tua sales gas to (PLN) at Gresik area.
• The PLN is 8 km south east of Bukit Tua ORF in Maspion Industrial Estate (MIE).
• There suppliers to the PLN : Company HS and Company KD
• Company HESS gas processing plant in MIE have a 20” sales gas pipeline to PLN, a feasibility study on
the possibility of tie-in to Company H sales gas pipeline to PLN is carried out.
• Production profile of Company H gas processing plant is not available, the pipeline steady-state
simulation model is limited to using the Company HESS design production rate from the Steady State
Hydraulic Analysis for Sales Gas Pipeline provided by Company HESS
• The preliminary schematic for the tie-in to existing Company HESS sales gas pipeline is shown in
Figure 2.1.
• The method of tie-in hot-tapping to avoid total plant shutdown of Company HESS gas processing
facilities
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
BASIS OF STUDY
Pipeline Route
• Company H sales gas pipeline route in Figure Company H sales gas pipeline started at HESS gas processing
plant battery limit then runs under the existing Maspion Road to seashore). Total length existing HESS sales
gas pipeline is approximately 8 km and the size is 20” HESS sales gas pipeline to several segments
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
31 barg
20”
8 km
29.1 barg
41.4 barg
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
STUDY OBJECTIVES
This study report the findings of steady state pipeline simulation for ORF pipeline tie-in to existing HESS sales
gas pipeline.
The objective of the steady state analysis is to determine :
Line size for the ORF sales gas pipeline (From ORF to Company H sales gas pipeline)
Capacity of HESS sales gas pipeline to achieve minimum delivery pressure of 29.1 barg at PLN upstream of
metering package
Pressure and temperature profiles along the pipeline route
Steady state simulations using PIPESIM corresponding to the maximum normal operations of the ORF and HESS
sales gas pipeline.
Advanced EPC Sistem Penyediaan Air Minum (SPAM)
CONCLUSIONS