DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : A.1.1 (8)
Provision of Field Office for the Engineer (Rental Basis)
Unit of Measurement : Month
Output - As Submitted :1
Output - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


A.1 Labor

Sub- Total for A.1- As Submitted


Labor
A.2
Sub- Total for A.2- As Evaluated
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment

Sub- Total for B.1- As Submitted


Equipment
B.2
Sub- Total for B.2- As Evaluated
C.1 Total (A.1 + B.1) - As Submitted
C.2 Total (A.2 + B.2) - As Evaluated
D.1 Output - As Submitted
D.2 Output - As Evaluated
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Rental of Office / Storage House (Including light and water) mo 1.00 5,500.00 5,500.00
Sub- Total for F.1- As Submitted 5,500.00
Materials
F.2 a. Rental of Office / Storage House (Including light and water) mo 1.00 5,500.00 5,500.00
Sub- Total for F.2- As Evaluated 5,500.00
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 5,500.00
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 5,500.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% of G.2
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 550.00
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 550.00
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 302.50
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 302.50
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 6,352.50
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 6,352.50

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page No. 1

Page 1
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : A.1.4 (1)
Provision of Progress Photographs
Unit of Measurement : Each
Output - As Submitted : 240
Output - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


A.1 Labor

Sub- Total for A.1- As Submitted


Labor
A.2
Sub- Total for A.2- As Evaluated
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment

Sub- Total for B.1- As Submitted


Equipment
B.2
Sub- Total for B.2- As Evaluated
C.1 Total (A.1 + B.1) - As Submitted
C.2 Total (A.2 + B.2) - As Evaluated
D.1 Output - As Submitted
D.2 Output per - As Evaluated
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Photoprinting each 1.00 20.00 20.00
Sub- Total for F.1- As Submitted 20.00
Materials
F.2 a. Photoprinting each 1.00 20.00 20.00
Sub- Total for F.2- As Evaluated 20.00
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 20.00
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 20.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% of G.2 -
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 2.00
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 2.00
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 1.10
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 1.10
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 23.10
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 23.10

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page No. 2

Page 2
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : B.5
Project Billboard / Signboard
Unit of Measurement : Each
Output - As Submitted : 2.00
Output - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 8.00 101.43 811.44
b. Unskilled Labor 2 8.00 56.72 907.52
Sub- Total for A.1- As Submitted 1,718.96
Labor
a. Construction Foreman 1 8.00 101.43 811.44
A.2
b. Unskilled Labor 2 8.00 56.72 907.52
Sub- Total for A.2- As Evaluated 1,718.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
a. Miscellaneous Handtools 1 8.00 86.50 692.04
Sub- Total for B.1- As Submitted 692.04
Equipment
B.2 a. Miscellaneous Handtools 1 8.00 86.50 692.04
Sub- Total for B.2- As Evaluated 692.04
C.1 Total (A.1 + B.1) - As Submitted 2,411.00
C.2 Total (A.2 + B.2) - As Evaluated 2,411.00
D.1 Output - As Submitted 2.00
D.2 Output per - As Evaluated 2.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,205.50
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,205.50
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Marine Plywood 1/4" x 4" x 8" pc 1.00 495.00 495.00
b. Tarpauline pc 1.00 900.00 900.00
F.1
c. 2" x 2" x 10' Coco Lumber bd.ft 3.00 38.00 114.00
d. 2" x 3" x 12' Coco Lumber bd.ft 2.00 38.00 76.00
e. 2" x 2" x 12' Coco Lumber bd.ft 3.00 38.00 114.00
f. Assorted CW Nails kg 0.25 65.00 16.25
Sub- Total for F.1- As Submitted 1,715.25
Materials
a. Marine Plywood 1/4" x 4" x 8" pc 1.00 495.00 495.00
b. Tarpauline pc 1.00 900.00 900.00
c. 2" x 2" x 10' Coco Lumber bd.ft 3.00 38.00 114.00
F.2
d. 2" x 3" x 12' Coco Lumber bd.ft 2.00 38.00 76.00
e. 2" x 2" x 12' Coco Lumber bd.ft 3.00 38.00 114.00
f. Assorted CW Nails kg 0.25 65.00 16.25
Sub- Total for F.2- As Evaluated 1,715.25
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 2,920.75
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 2,920.75
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 438.11
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 438.11
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 292.07
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 292.07
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 182.55
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 182.55
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 3,833.48
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 3,833.48

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page No. 3

Page 3
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : B.7 (1)
Occupational Safety and Health Program
Unit of Measurement : Month
Output per Month - As Submitted : 1.00
Output per Month - As Evaluated :

Designation No. of Person/s Man-days Hourly Rate Amount (PhP)


A.1 Labor
a. Part Time Safety Officer 1 100.00 280.00 28,000.00
Sub- Total for A.1- As Submitted 28,000.00
Labor
A.2 a. Part Time Safety Officer 1 100.00 280.00 28,000.00
Sub- Total for A.2- As Evaluated 28,000.00
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment

Sub- Total for B.1- As Submitted


Equipment
B.2
Sub- Total for B.2- As Evaluated
C.1 Total (A.1 + B.1) - As Submitted 28,000.00
C.2 Total (A.2 + B.2) - As Evaluated 28,000.00
D.1 Output per Month - As Submitted 1.00
D.2 Output per Month - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 28,000.00
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 28,000.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Safety Helmet man-days 1312.00 0.25 328.00
b. Safety Shoes man-days 1163.00 2.77 3,221.51
c. Safety Gloves man-days 1312.00 7.67 10,063.04
F.1 d. Vest man-days 1312.00 2.22 2,912.64
f. Dust Mask man-days 254.00 15.00 3,810.00
g. Eye Goggles man-days 178.00 2.82 501.96
h. Ear Muff man-days 76.00 0.83 63.08
i. Body Harness and Lanyard man-days 120.00 3.21 385.20
j. Rubber Boots man-days 335.00 1.39 465.65
Sub- Total for F.1- As Submitted 21,751.08
Materials
a. Safety Helmet man-days 1312 0.25 328.00
b. Safety Shoes man-days 1163 2.77 3,221.51
c. Safety Gloves man-days 1312 7.67 10,063.04
d. Vest man-days 1312 2.22 2,912.64
F.2 f. Dust Mask man-days 254 15 3,810.00
g. Eye Goggles man-days 178 2.82 501.96
h. Ear Muff man-days 76 0.83 63.08
i. Body Harness and Lanyard man-days 120 3.21 385.20
j. Rubber Boots man-days 335 1.39 465.65
Sub- Total for F.2- As Evaluated 21,751.08
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 49,751.08
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 49,751.08
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1 -
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% of G.2
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 4,975.11
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 4,975.11
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 2,736.31
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 2,736.31
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 57,462.50
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 57,462.50

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 4
Page No. 4

Page 5
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : B.9
Mobilization / Demobilization
Unit of Measurement : Lump Sum
Output - As Submitted : 1.00
Output - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


A.1 Labor

Sub- Total for A.1- As Submitted -


Labor
A.2
Sub- Total for A.2- As Evaluated
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. Self Loading Truck & Accessories 1 4.00 1,300.00 5,200.00
b. Miscellaneous Handtools 5,000.00
Sub- Total for B.1- As Submitted 10,200.00
Equipment
a. Self Loading Truck & Accessories 1 4.00 1,300.00 5,200.00
B.2
b. Miscellaneous Handtools 5,000.00
Sub- Total for B.2- As Evaluated 10,200.00
C.1 Total (A.1 + B.1) - As Submitted 10,200.00
C.2 Total (A.2 + B.2) - As Evaluated 10,200.00
D.1 Output - As Submitted 1.00
D.2 Output - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 10,200.00
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 10,200.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
-
Sub- Total for F.1- As Submitted -
Materials
F.2
Sub- Total for F.2- As Evaluated
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 10,200.00
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 10,200.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1 -
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% of G.2
I.1 Contractor's Profit (CP) - As Submitted 0% of G.1 -
I.2 Contractor's Profit (CP) - As Evaluated 0% of G.2
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 510.00
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 510.00
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 10,710.00
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 10,710.00

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 6
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 101 (1)
Removal of Structures and Obstruction
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 8.00 101.43 811.44
b. Skilled Labor 1 8.00 73.65 589.20
c. Unskilled Labor 2 8.00 56.72 907.52
Sub- Total for A.1- As Submitted 2,308.16
Labor
a. Construction Foreman 1 8.00 101.43 811.44
A.2 b. Skilled Labor 1 8.00 73.65 589.20
c. Unskilled Labor 2 8.00 56.72 907.52
Sub- Total for A.2- As Evaluated 2,308.16
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Backhoe w/ Breaker (0.80 m3) 1 8.00 1,998.10 15,984.80
b. Dump Truck (12 yd3) 1 2.00 1,420.00 2,840.00
c. Cutting Outfit 1 5.00 45.45 227.25
Sub- Total for B.1- As Submitted 19,052.05
Equipment
a. Backhoe w/ Breaker (0.80 m3) 1 8.00 1,998.10 15,984.80
B.2 b. Dump Truck (12 yd3) 1 2.00 1,420.00 2,840.00
c. Cutting Outfit 1 5.00 45.45 227.25
Sub- Total for B.2- As Evaluated 19,052.05
C.1 Total (A.1 + B.1) - As Submitted 21,360.21
C.2 Total (A.2 + B.2) - As Evaluated 21,360.21
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 21,360.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 21,360.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
-
Sub- Total for F.1- As Submitted -
Materials
F.2
Sub- Total for F.2- As Evaluated
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 21,360.21
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 21,360.21
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 3,204.03
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 3,204.03
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 2,136.02
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 2,136.02
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 1,335.01
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 1,335.01
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 28,035.28
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 28,035.28

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 7
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 803 (1) a
Structure Excavation, Common Soil
Unit of Measurement : cu.m.
Output per hour - As Submitted : 20.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 271.59
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 271.59
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Backhoe (0.80 m3) 1 1.00 1,537.00 1,537.00
b. Dumptruck (12 yd3) 1 1.00 1,420.00 1,420.00
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.1- As Submitted 2,984.16
Equipment
a. Backhoe (0.80 m3) 1 1.00 1,537.00 1,537.00
B.2 b. Dumptruck (12 yd3) 1 1.00 1,420.00 1,420.00
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.2- As Evaluated 2,984.16
C.1 Total (A.1 + B.1) - As Submitted 3,255.75
C.2 Total (A.2 + B.2) - As Evaluated 3,255.75
D.1 Output per hour - As Submitted 20.00
D.2 Output per hour - As Evaluated 20.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 162.79
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 162.79
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials

Sub- Total for F.1- As Submitted


Materials
F.2
Sub- Total for F.2- As Evaluated
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 162.79
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 162.79
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 24.42
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 24.42
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 16.28
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 16.28
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 10.17
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 10.17
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 213.66
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 213.66

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 8
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 804 (1) a
Embankment, From roadway/structure excavation
Unit of Measurement : cu.m.
Output per hour - As Submitted : 9.84
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 271.59
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 271.59
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Plate Compactor (5 hp) 1 0.75 123.00 92.25
b. Backhoe (0.80 m3) 1 0.75 1,537.00 1,152.75
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.1- As Submitted 1,272.16
Equipment
a. Plate Compactor (5 hp) 1 0.75 123.00 92.25
B.2 b. Backhoe (0.80 m3) 1 0.75 1,537.00 1,152.75
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.2- As Evaluated 1,272.16
C.1 Total (A.1 + B.1) - As Submitted 1,543.75
C.2 Total (A.2 + B.2) - As Evaluated 1,543.75
D.1 Output per hour - As Submitted 9.84
D.2 Output per hour - As Evaluated 9.84
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 156.89
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 156.89
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
-
Sub- Total for F.1- As Submitted -
Materials
F.2
Sub- Total for F.2- As Evaluated
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 156.89
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 156.89
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 23.53
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 23.53
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 15.69
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 15.69
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 9.81
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 9.81
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 205.91
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 205.91

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

#REF!

Page 9
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 804 (1) b
Embankment, From borrow
Unit of Measurement : cu.m.
Output per hour - As Submitted : 9.84
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 271.59
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 271.59
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Plate Compactor (5 hp) 1 0.75 123.00 92.25
b. Backhoe (0.80 m3) 1 0.75 1,537.00 1,152.75
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.1- As Submitted 1,272.16
Equipment
a. Plate Compactor (5 hp) 1 0.75 123.00 92.25
B.2 b. Backhoe (0.80 m3) 1 0.75 1,537.00 1,152.75
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.2- As Evaluated 1,272.16
C.1 Total (A.1 + B.1) - As Submitted 1,543.75
C.2 Total (A.2 + B.2) - As Evaluated 1,543.75
D.1 Output per hour - As Submitted 9.84
D.2 Output per hour - As Evaluated 9.84
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 156.89
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 156.89
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Embankment Materials (25% shringkage factor) cu.m. 1.25 323.00 403.75
Sub- Total for F.1- As Submitted 403.75
Materials
F.2 a. Embankment Materials (25% shringkage factor) cu.m. 1.25 323.00 403.75
Sub- Total for F.2- As Evaluated 403.75
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 560.64
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 560.64
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 84.10
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 84.10
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 56.06
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 56.06
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 35.04
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 35.04
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 735.83
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 735.83

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

#REF!

Page 10
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 804 (4)
Gravel fill
Unit of Measurement : cu.m.
Output per hour - As Submitted : 1.20
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 271.59
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2
b. Unskilled Labor 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 271.59
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. Plate Compactor (5 hp) 1 0.50 123.00 61.50
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.1- As Submitted 88.66
Equipment
a. Plate Compactor (5 hp) 1 0.50 123.00 61.50
B.2
Minor Tools (10% of Labor Cost) 27.16
Sub- Total for B.2- As Evaluated 88.66
C.1 Total (A.1 + B.1) - As Submitted 360.25
C.2 Total (A.2 + B.2) - As Evaluated 360.25
D.1 Output per hour - As Submitted 1.20
D.2 Output per hour - As Evaluated 1.20
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 300.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 300.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
a. Gravel Bedding (G1) cu.m. 1.05 917.50 963.38
(w/ 5% Shrinkage Factor) -
Sub- Total for F.1- As Submitted 963.38
Materials
a. Gravel Bedding (G1) cu.m. 1.05 917.50 963.38
F.2
(w/ 5% Shrinkage Factor) -
Sub- Total for F.2- As Evaluated 963.38
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 1,263.58
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 1,263.58
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 189.54
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 189.54
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 126.36
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 126.36
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 78.97
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 78.97
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 1,658.45
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 1,658.45

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 11
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 900 (1) c2
Structural Concrete (Footings and Slab on Fill), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.36
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 401.96
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 401.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. One Bagger Mixer 1 1.00 172.00 172.00
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.1- As Submitted 192.10
Equipment
a. One Bagger Mixer 1 1.00 172.00 172.00
B.2
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.2- As Evaluated 192.10
C.1 Total (A.1 + B.1) - As Submitted 594.06
C.2 Total (A.2 + B.2) - As Evaluated 594.06
D.1 Output per hour - As Submitted 0.36
D.2 Output per hour - As Evaluated 0.36
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,650.16
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,650.16
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1.00 1,067.50 1,067.50
b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.1- As Submitted 3,883.15
Materials
a. Gravel cu.m. 1.00 1,067.50 1,067.50
F.2 b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.2- As Evaluated 3,883.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 5,533.31
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 5,533.31
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 830.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 830.00
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 553.33
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 553.33
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 345.83
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 345.83
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,262.47
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,262.47

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!

Page 12
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 900 (1) c3
Structural Concrete (Footing Tie Beams), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 401.96
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 401.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. One Bagger Mixer 1 1.00 172.00 172.00
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.1- As Submitted 192.10
Equipment
a. One Bagger Mixer 1 1.00 172.00 172.00
B.2
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.2- As Evaluated 192.10
C.1 Total (A.1 + B.1) - As Submitted 594.06
C.2 Total (A.2 + B.2) - As Evaluated 594.06
D.1 Output per hour - As Submitted 0.27
D.2 Output per hour - As Evaluated 0.27
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,200.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,200.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1.00 1,067.50 1,067.50
b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.1- As Submitted 3,883.15
Materials
a. Gravel cu.m. 1.00 1,067.50 1,067.50
F.2 b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.2- As Evaluated 3,883.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 6,083.36
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 6,083.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 912.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 912.50
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 608.34
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 608.34
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 380.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 380.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,984.42
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,984.42

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!

Page 13
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 900 (1) c4
Structural Concrete (Columns), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 401.96
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 401.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. One Bagger Mixer 1 1.00 172.00 172.00
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.1- As Submitted 192.10
Equipment
a. One Bagger Mixer 1 1.00 172.00 172.00
B.2
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.2- As Evaluated 192.10
C.1 Total (A.1 + B.1) - As Submitted 594.06
C.2 Total (A.2 + B.2) - As Evaluated 594.06
D.1 Output per hour - As Submitted 0.27
D.2 Output per hour - As Evaluated 0.27
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,200.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,200.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1.00 1,067.50 1,067.50
b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.1- As Submitted 3,883.15
Materials
a. Gravel cu.m. 1.00 1,067.50 1,067.50
F.2 b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.2- As Evaluated 3,883.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 6,083.36
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 6,083.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 912.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 912.50
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 608.34
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 608.34
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 380.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 380.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,984.42
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,984.42

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!

Page 14
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 900 (1) c5
Structural Concrete (Suspended Slab), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 401.96
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 401.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. One Bagger Mixer 1 1.00 172.00 172.00
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.1- As Submitted 192.10
Equipment
a. One Bagger Mixer 1 1.00 172.00 172.00
B.2
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.2- As Evaluated 192.10
C.1 Total (A.1 + B.1) - As Submitted 594.06
C.2 Total (A.2 + B.2) - As Evaluated 594.06
D.1 Output per hour - As Submitted 0.27
D.2 Output per hour - As Evaluated 0.27
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,200.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,200.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1.00 1,067.50 1,067.50
b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.1- As Submitted 3,883.15
Materials
a. Gravel cu.m. 1.00 1,067.50 1,067.50
F.2 b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.2- As Evaluated 3,883.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 6,083.36
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 6,083.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 912.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 912.50
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 608.34
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 608.34
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 380.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 380.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,984.42
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,984.42

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Page No. #REF!

Page 15
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 900 (1) c6
Structural Concrete (Beams/Girders), A, 28 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 0.27
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 401.96
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 1 1.00 73.65 73.65
b. Unskilled Labor 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 401.96
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1
a. One Bagger Mixer 1 1.00 172.00 172.00
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.1- As Submitted 192.10
Equipment
a. One Bagger Mixer 1 1.00 172.00 172.00
B.2
Minor Tools (5% of Labor Cost) 20.10
Sub- Total for B.2- As Evaluated 192.10
C.1 Total (A.1 + B.1) - As Submitted 594.06
C.2 Total (A.2 + B.2) - As Evaluated 594.06
D.1 Output per hour - As Submitted 0.27
D.2 Output per hour - As Evaluated 0.27
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,200.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,200.21
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Gravel cu.m. 1.00 1,067.50 1,067.50
b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.1- As Submitted 3,883.15
Materials
a. Gravel cu.m. 1.00 1,067.50 1,067.50
F.2 b. Sand cu.m. 0.50 1,008.50 504.25
c. Cement bags 9.10 254.00 2,311.40
Sub- Total for F.2- As Evaluated 3,883.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 6,083.36
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 6,083.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 912.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 912.50
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 608.34
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 608.34
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 380.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 380.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,984.42
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,984.42

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 16
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 902 (1) a
Reinforcing Steel (Deformed), Grade 40
Unit of Measurement : kg.
Output per hour - As Submitted : 129.09
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Labor 3 1.00 73.65 220.95
b. Unskilled Labor 12 1.00 56.72 680.64
Sub- Total for A.1- As Submitted 1,003.02
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. S\killed Labor 3 1.00 73.65 220.95
b. Unskilled Labor 12 1.00 56.72 680.64
Sub- Total for A.2- As Evaluated 1,003.02
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Bar Cutter 1 0.50 219.75 109.88
b. Bar Bender 1 0.50 351.50 175.75
Minor Tools (10% of Labor Cost) 100.30
Sub- Total for B.1- As Submitted 385.93
Equipment
a. Bar Cutter 1 0.5 219.75 109.88
B.2 b. Bar Bender 1 0.5 351.50 34.03
Minor Tools (10% of Labor Cost) 100.30
Sub- Total for B.2- As Evaluated 244.21
C.1 Total (A.1 + B.1) - As Submitted 1,388.95
C.2 Total (A.2 + B.2) - As Evaluated 1,388.95
D.1 Output per hour - As Submitted 129.09
D.2 Output per hour - As Evaluated 129.09
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 10.76
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 10.76
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Deformed Reinforcing Steel kg 1.00 41.00 41.00
b. #16 Galvanized iron wire kg 0.02 87.00 1.31
c. Consumables (5% of Material Cost) 2.12
Sub- Total for F.1- As Submitted 44.42
Materials
a. Deformed Reinforcing Steel kg 1.00 41.00 41.00
F.2 b. #16 Galvanized iron wire kg 0.02 87.00 1.31
c. Consumables (5% of Material Cost) 2.12
Sub- Total for F.2- As Evaluated 44.42
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 55.18
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 55.18
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 8.28
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 8.28
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 5.52
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 5.52
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 3.45
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 3.45
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 72.42
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 72.42

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 17
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 903 (2)
Formworks and Falseworks
Unit of Measurement : sq.m.
Output per hour - As Submitted : 4.50
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
Installation
a. Construction foreman 1 1.00 101.43 101.43
A.1 b. Skilled Laborer 4 1.00 73.65 294.60
c. Unskilled Laborer 6 1.00 56.72 340.32
Stripping -
a. Construction foreman 1 0.56 101.43 56.80
b. Unskilled Laborer 6 0.56 56.72 190.58
Sub- Total for A.1- As Submitted 983.73
Labor
Installation
a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 4 1.00 73.65 294.60
A.2 c. Unskilled Laborer 6 1.00 56.72 340.32
Stripping
a. Construction foreman 1 0.56 101.43 56.80
b. Unskilled Laborer 6 0.56 56.72 190.58
Sub- Total for A.2- As Evaluated 983.73
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
Area = 4.5 sq.m.
a. H-Frame 1.7 m x 1.2m, set 0.878 14.00 6.08 74.74
2 pes H-frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
B.1 b. Shoring Jack, 3.8 m full extension 1.361 14.00 4.50 85.74
c. Adjustable U-head Jack, 0.6m 1.756 14.00 0.85 20.90
d. Adjustable Base Jack, 0.6m 1.756 14.00 0.85 20.90
e. 1-1/2" GI Pipe x 6.0 m 1.361 14.00 2.50 47.63
f. 1-1/2" GI Pipe x 3.0 m 0.351 14.00 1.25 6.15
g. 1-1/2" GI Pipe x 4.0 m 0.702 14.00 1.75 17.21
h. 1-1/2" GI Pipe x 1.0 m 4.741 14.00 0.50 33.19
i. Tie Rod x 0.60m 6.102 14.00 1.00 85.43
j. Round Wing Nut 12.248 14.00 0.15 25.72
Sub- Total for B.1- As Submitted 417.59
Equipment
Area = 4.5 sq.m.
a. H-Frame 1.7 m x 1.2m, set 0.878 14.00 6.08 74.74
2 pes H-frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
b. Shoring Jack, 3.8 m full extension 1.361 14.00 4.50 85.74
B.2 c. Adjustable U-head Jack, 0.6m 1.756 14.00 0.85 20.90
d. Adjustable Base Jack, 0.6m 1.756 14.00 0.85 20.90
e. 1-1/2" GI Pipe x 6.0 m 1.361 14.00 2.50 47.63
f. 1-1/2" GI Pipe x 3.0 m 0.351 14.00 1.25 6.15
g. 1-1/2" GI Pipe x 4.0 m 0.702 14.00 1.75 17.21
h. 1-1/2" GI Pipe x 1.0 m 4.741 14.00 0.50 33.19
i. Tie Rod x 0.60m 6.102 14.00 1.00 85.43
j. Round Wing Nut 12.248 14.00 0.15 25.72
Sub- Total for B.2- As Evaluated 417.59
C.1 Total (A.1 + B.1) - As Submitted 1,401.32
C.2 Total (A.2 + B.2) - As Evaluated 1,401.32
D.1 Output per hour - As Submitted 4.50
D.2 Output per hour - As Evaluated 4.50
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 311.41
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 311.41
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Phenolic board (.0019 x 1.2 x 2.4) - 5 uses pc 0.35 1,336.00 92.72
b. Good Lumber bd.ft 4.73 55.00 86.66
c. Consumables (5% of Material Cost) 20.88
Sub- Total for F.1- As Submitted 200.26

Page 18
Materials
a. Phenolic board (.0019 x 1.2 x 2.4) - 5 uses pc 0.35 1,336.00 92.72
F.2 b. Good Lumber bd.ft 4.73 55.00 86.66
c. Consumables (5% of Material Cost) 20.88
Sub- Total for F.2- As Evaluated 200.26
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 511.66
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 511.66
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 76.75
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 76.75
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 51.17
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 51.17
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 31.98
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 31.98
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 671.56
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 671.56
Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 19
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1000 (1)
Soil Poisoning
Unit of Measurement : Liter
Output per hour - As Submitted : 5.40
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.1- As Submitted 288.52
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.2- As Evaluated 288.52
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.1- As Submitted 28.85
Equipment
B.2 Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.2- As Evaluated 28.85
C.1 Total (A.1 + B.1) - As Submitted 317.37
C.2 Total (A.2 + B.2) - As Evaluated 317.37
D.1 Output per hour - As Submitted 5.40
D.2 Output per hour - As Evaluated 5.40
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 58.77
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 58.77
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Soil Poisoning L 1.00 275.00 275.00
Sub- Total for F.1- As Submitted 275.00
Materials
F.2 a. Soil Poisoning L 1.00 275.00 275.00
Sub- Total for F.2- As Evaluated 275.00
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 333.77
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 333.77
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 50.07
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 50.07
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 33.38
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 33.38
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 20.86
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 20.86
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 438.08
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 438.08

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 20
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1001 (8)
Sewer Line Works
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 4.00 101.43 405.72
b. Skilled Laborer 1 4.00 73.65 294.60
c. Unskilled Laborer 2 4.00 56.72 453.76
Sub- Total for A.1- As Submitted 1,154.08
Labor
a. Construction foreman 1 4.00 101.43 405.72
A.2 b. Skilled Laborer 1 4.00 73.65 294.60
c. Unskilled Laborer 2 4.00 56.72 453.76
Sub- Total for A.2- As Evaluated 1,154.08
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 115.41
Sub- Total for B.1- As Submitted 115.41
Equipment
B.2 Minor Tools (10% of Labor Cost) 115.41
Sub- Total for B.2- As Evaluated 115.41
C.1 Total (A.1 + B.1) - As Submitted 1,269.49
C.2 Total (A.2 + B.2) - As Evaluated 1,269.49
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,269.49
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,269.49
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
100mm dia PVC pipe pcs 4.00 506.00 2,024.00
100mm x 50mm Tee pcs 4.00 140.00 560.00
100mm dia wye pcs 2.00 150.00 300.00
100mm x 50mm wye pcs 2.00 140.00 280.00
100mm elbow 45 deg pcs 2.00 90.00 180.00
F.1 100mm elbow 90 deg pcs 2.00 81.00 162.00
100mm dia cleanout pcs 2.00 36.00 72.00
50mm dia PVC pipe pcs 2.00 168.00 336.00
50mm dia p-trap pcs 1.00 98.00 98.00
50mm dia tee pcs 2.00 37.00 74.00
50mm dia PVC elbow 45 deg pcs 3.00 50.00 150.00
50mm dia elbow 90 deg pcs 3.00 26.00 78.00
Consumable (5%) 215.70
Sub- Total for F.1- As Submitted 4,529.70
Materials
100mm dia PVC pipe pcs 4.00 506.00 2,024.00
100mm x 50mm Tee pcs 4.00 140.00 560.00
100mm dia wye pcs 2.00 150.00 300.00
100mm x 50mm wye pcs 2.00 140.00 280.00
100mm elbow 45 deg pcs 2.00 90.00 180.00
100mm elbow 90 deg pcs 2.00 81.00 162.00
F.2 100mm dia cleanout pcs 2.00 36.00 72.00
50mm dia PVC pipe pcs 2.00 168.00 336.00
50mm dia p-trap pcs 1.00 98.00 98.00
50mm dia tee pcs 2.00 37.00 74.00
50mm dia PVC elbow 45 deg pcs 3.00 50.00 150.00
50mm dia elbow 90 deg pcs 3.00 26.00 78.00
Consumable (5%) 215.70
Sub- Total for F.2- As Evaluated 4,529.70
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 5,799.19
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 5,799.19
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 869.88
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 869.88
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 579.92
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 579.92
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 362.45
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 362.45
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 7,611.43
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 7,611.43

Prepared by: Checked/ Reviewed by:

Page 21
PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 22
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1001 (9)
Storm Drainage and Downspout
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 8.00 101.43 811.44
b. Skilled Laborer 1 8.00 73.65 589.20
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.1- As Submitted 2,308.16
Labor
a. Construction foreman 1 8.00 101.43 811.44
A.2 b. Skilled Laborer 1 8.00 73.65 589.20
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.2- As Evaluated 2,308.16
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 230.82
Sub- Total for B.1- As Submitted 230.82
Equipment
B.2 Minor Tools (10% of Labor Cost) 230.82
Sub- Total for B.2- As Evaluated 230.82
C.1 Total (A.1 + B.1) - As Submitted 2,538.98
C.2 Total (A.2 + B.2) - As Evaluated 2,538.98
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,538.98
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,538.98
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
4" dia PVC pipe pcs 5.00 506.00 2,530.00
F.1 4" dia elbow 90deg pcs 10.00 81.00 810.00
4" dia elbow 45deg pcs 10.00 90.00 900.00
coupling pcs 16.00 60.00 960.00
Consumable (5%) 260.00
Sub- Total for F.1- As Submitted 5,460.00
Materials
4" dia PVC pipe pcs 5.00 506.00 2,530.00
4" dia elbow 90deg pcs 10.00 81.00 810.00
F.2 4" dia elbow 45deg pcs 10.00 90.00 900.00
coupling pcs 16.00 60.00 960.00
Consumable (5%) 260.00
Sub- Total for F.2- As Evaluated 5,460.00
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 7,998.98
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 7,998.98
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 1,199.85
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 1,199.85
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 799.90
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 799.90
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 499.94
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 499.94
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 10,498.66
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 10,498.66

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 23
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1002 (4)
Plumbing Fixtures
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.1- As Submitted 288.52
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.2- As Evaluated 288.52
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.1- As Submitted 28.85
Equipment
B.2 Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.2- As Evaluated 28.85
C.1 Total (A.1 + B.1) - As Submitted 317.37
C.2 Total (A.2 + B.2) - As Evaluated 317.37
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 317.37
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 317.37
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Water Closet including fittings and accessories (elongated) american std. or equivalent set/s 1.00 12,000.00 12,000.00
F.1
Lavatory including fittings and accessories american std. or equivalent set/s 1.00 4,700.00 4,700.00
Faucet pcs. 1.00 240.00 240.00
Floor Drains (stainless steel with waterless trap) pcs. 1.00 195.00 195.00
Sub- Total for F.1- As Submitted 17,135.00
Materials
Water Closet including fittings and accessories (elongated) american std. or equivalent set/s 1.00 12,000.00 12,000.00
Lavatory including fittings and accessories american std. or equivalent set/s 1.00 4,700.00 4,700.00
F.2
Faucet pcs. 1.00 240.00 240.00
Floor Drains (stainless steel with waterless trap) pcs. 1.00 195.00 195.00
Sub- Total for F.- As Evaluated 17,135.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 17,452.37
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 17,452.37
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 2,617.86
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 2,617.86
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 1,745.24
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 1,745.24
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 1,090.77
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 1,090.77
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 22,906.24
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 22,906.24

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 24
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1002 (24)
Cold Water Lines
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 8.00 101.43 811.44
b. Skilled Laborer 1 8.00 73.65 589.20
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.1- As Submitted 2,308.16
Labor
a. Construction foreman 1 8.00 101.43 811.44
A.2 b. Skilled Laborer 1 8.00 73.65 589.20
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.2- As Evaluated 2,308.16
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 230.82
Sub- Total for B.1- As Submitted 230.82
Equipment
B.2 Minor Tools (10% of Labor Cost) 230.82
Sub- Total for B.2- As Evaluated 230.82
C.1 Total (A.1 + B.1) - As Submitted 2,538.98
C.2 Total (A.2 + B.2) - As Evaluated 2,538.98
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,538.98
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,538.98
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
G.I Pipe 12.7mm pcs 3.00 336.00 1,008.00
G.I tee 12.70mm pcs 3.00 12.00 36.00
F.1 G.I elbow 12.70mm pcs 4.00 15.00 60.00
G.I end cap pcs 4.00 7.00 28.00
G.I union patente pcs 1.00 33.00 33.00
G.I gate valve pcs 1.00 379.00 379.00
Consumable (5%) 77.20
Sub- Total for F.1- As Submitted 1,621.20
Materials
G.I Pipe 12.7mm pcs 3.00 336.00 1,008.00
G.I tee 12.70mm pcs 3.00 12.00 36.00
G.I elbow 12.70mm pcs 4.00 15.00 60.00
F.2 G.I end cap pcs 4.00 7.00 28.00
G.I union patente pcs 1.00 33.00 33.00
G.I gate valve pcs 1.00 379.00 379.00
Consumable (5%) 77.20
Sub- Total for F.1- As Submitted 1,621.20
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 4,160.18
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 4,160.18
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 624.03
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 624.03
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 416.02
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 416.02
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 260.01
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 260.01
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 5,460.23
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 5,460.23

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 25
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1003 (1) a1
Ceiling, 4.5 mm, Metal Frame, Fiber Cement Board
Unit of Measurement : sq.m.
Output per hour - As Submitted : 1.49
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.1- As Submitted 288.52
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.2- As Evaluated 288.52
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.1- As Submitted 28.85
Equipment
B.2 Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.2- As Evaluated 28.85
C.1 Total (A.1 + B.1) - As Submitted 317.37
C.2 Total (A.2 + B.2) - As Evaluated 317.37
D.1 Output per hour - As Submitted 1.49
D.2 Output per hour - As Evaluated 1.49
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 213.14
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 213.14
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 4.5mm Fiber Cement Board/ 4.5mm Marine Plywood/ 6mm Marine Plywood/ 6mm Ordin pc. 0.365 450.00 164.25
b. Metal Furring pc. 1.131 130.00 147.03
c. Carrying Channels pc. 0.357 150.00 53.55
F.1
d. Hanger Bars/Rod pc. 1.000 80.00 80.00
e. Channel Clip pc. 6.000 20.00 120.00
f. Wall Angle pc. 0.238 100.00 23.80
g. Rivets pc. 14.000 1.50 21.00
h. 1" Metal Screw pc. 4.000 3.00 12.00
Sub- Total for F.1- As Submitted 621.63
Materials
a. 4.5mm Fiber Cement Board/ 4.5mm Marine Plywood/ 6mm Marine Plywood/ 6mm Ordin pc. 0.365 450.00 164.25
b. Metal Furring pc. 1.131 130.00 147.03
c. Carrying Channels pc. 0.357 150.00 53.55
d. Hanger Bars/Rod pc. 1.000 80.00 80.00
F.2
e. Channel Clip pc. 6.000 20.00 120.00
f. Wall Angle pc. 0.238 100.00 23.80
g. Rivets pc. 14.000 1.50 21.00
h. 1" Metal Screw pc. 4.000 3.00 12.00
Sub- Total for F.1- As Submitted 33.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 834.77
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 834.77
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 125.22
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 125.22
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 83.48
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 83.48
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 52.17
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 52.17
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 1,095.64
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 1,095.64

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 26
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1004 (2)
Finishing Hardware
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 12.00 101.43 1,217.16
b. Skilled Laborer 1 12.00 73.65 883.80
c. Unskilled Laborer 2 12.00 56.72 1,361.28
Sub- Total for A.1- As Submitted 3,462.24
Labor
a. Construction foreman 1 12.00 101.43 1,217.16
A.2 b. Skilled Laborer 1 12.00 73.65 883.80
c. Unskilled Laborer 2 12.00 56.72 1,361.28
Sub- Total for A.2- As Evaluated 3,462.24
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 346.22
Sub- Total for B.1- As Submitted 346.22
Equipment
B.2 Minor Tools (10% of Labor Cost) 346.22
Sub- Total for B.2- As Evaluated 346.22
C.1 Total (A.1 + B.1) - As Submitted 3,808.46
C.2 Total (A.2 + B.2) - As Evaluated 3,808.46
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 3,808.46
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 3,808.46
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a.Finishing Hardware (Lockset/Latches, Bolts, set/s 4.00 922.00 3,688.00
Door Closer, Knobs/Handles/Hinges/ -
Ladder/Grab Bar) -
Sub- Total for F.1- As Submitted 3,688.00
Materials
a.Finishing Hardware (Lockset/Latches, Bolts, set/s 4.00 922.00 3,688.00
F.2 Door Closer, Knobs/Handles/Hinges/ -
Ladder/Grab Bar) -
Sub- Total for F.1- As Submitted 3,688.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 7,496.46
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 7,496.46
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 1,124.47
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 1,124.47
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 749.65
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 749.65
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 468.53
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 468.53
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 9,839.11
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 9,839.11

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 27
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1007 (1) a
Aluminum Framed Glass Door, Sliding Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.26
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 0.26
D.2 Output per hour - As Evaluated 0.26
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 980.69
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 980.69
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Aluminum Glass Door (Sliding Type/ sq.m. 1.00 2,450.00 2,450.00
Swing Type) -
b. Consumables (3% of Materials Cost) 73.50
Sub- Total for F.1- As Submitted 2,523.50
Materials
a. Aluminum Glass Door (Sliding Type/ sq.m. 1.00 2,450.00 2,450.00
F.2 Swing Type) -
b. Consumables (3% of Materials Cost) 73.50
Sub- Total for F.1- As Submitted 2,523.50
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,504.19
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 3,504.19
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 525.63
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 525.63
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 350.42
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 350.42
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 219.01
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 219.01
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 4,599.25
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 4,599.25

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 28
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1007 (1) b
Aluminum Framed Glass Door, Swing Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.26
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 0.26
D.2 Output per hour - As Evaluated 0.26
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 980.69
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 980.69
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Aluminum Glass Door (Sliding Type/ sq.m. 1.00 2,450.00 2,450.00
Swing Type) -
b. Consumables (3% of Materials Cost) 73.50
Sub- Total for F.1- As Submitted 2,523.50
Materials
a. Aluminum Glass Door (Sliding Type/ sq.m. 1.00 2,450.00 2,450.00
F.2 Swing Type) -
b. Consumables (3% of Materials Cost) 73.50
Sub- Total for F.1- As Submitted 2,523.50
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,504.19
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 3,504.19
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 525.63
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 525.63
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 350.42
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 350.42
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 219.01
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 219.01
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 4,599.25
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 4,599.25

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 29
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1008 (1) a
Aluminum Glass Windows, Sliding Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.26
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 0.26
D.2 Output per hour - As Evaluated 0.26
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 980.69
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 980.69
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Aluminum Glass Window (Sliding Type/ sq.m. 1.00 2,800.00 2,800.00
Swing Type) -
b. Consumables (3% of Materials Cost) 84.00
Sub- Total for F.1- As Submitted 2,884.00
Materials
a. Aluminum Glass Window (Sliding Type/ sq.m. 1.00 2,800.00 2,800.00
F.2 Swing Type) -
b. Consumables (3% of Materials Cost) 84.00
Sub- Total for F.1- As Submitted 2,884.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,864.69
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 3,864.69
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 579.70
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 579.70
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 386.47
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 386.47
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 241.54
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 241.54
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 5,072.41
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 5,072.41

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 30
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1008 (1) c
Aluminum Glass Windows, Awning Type
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.36
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 0.36
D.2 Output per hour - As Evaluated 0.36
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 708.28
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 708.28
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 a. Aluminum Glass Window (Sliding Type/ Awning Type/ sq.m. 1.00 2,450.00 2,450.00
Casement Type) -
b. Consumables (3% of Materials Cost) 73.50
Sub- Total for F.1- As Submitted 2,523.50
Materials
a. Aluminum Glass Window (Sliding Type/ Awning Type/ sq.m. 1.00 2,450.00 2,450.00
F.2 Casement Type) -
b. Consumables (3% of Materials Cost) - 73.50
Sub- Total for F.1- As Submitted 2,523.50
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,231.78
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 3,231.78
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 484.77
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 484.77
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 323.18
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 323.18
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 201.99
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 201.99
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 4,241.71
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 4,241.71

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 31
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1010 (1)
Frames, Jambs, Sills, Head, Transoms and Mullion
Unit of Measurement : Set
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 2.00 101.43 202.86
b. Skilled Laborer 1 2.00 73.65 147.30
c. Unskilled Laborer 1 2.00 56.72 113.44
Sub- Total for A.1- As Submitted 463.60
Labor
a. Construction foreman 1 2.00 101.43 202.86
A.2 b. Skilled Laborer 1 2.00 73.65 147.30
c. Unskilled Laborer 1 2.00 56.72 113.44
Sub- Total for A.2- As Evaluated 463.60
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 46.36
Sub- Total for B.1- As Submitted 46.36
Equipment
B.2 Minor Tools (10% of Labor Cost) 46.36
Sub- Total for B.2- As Evaluated 46.36
C.1 Total (A.1 + B.1) - As Submitted 509.96
C.2 Total (A.2 + B.2) - As Evaluated 509.96
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 509.96
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 509.96
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
a. Jambs, Sill, Head, Transoms and Mullion set 4.00 2,027.00 8,108.00
b. Consumables (5% of Materials Cost) 405.40
Sub- Total for F.1- As Submitted 8,513.40
Materials
a. Jambs, Sill, Head, Transoms and Mullion set 4.00 2,027.00 8,108.00
F.2
b. Consumables (5% of Materials Cost) 243.24
Sub- Total for F.1- As Submitted 8,351.24
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 9,023.36
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 9,023.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 1,353.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 1,353.50
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 902.34
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 902.34
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 563.96
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 563.96
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 11,843.16
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 11,843.16

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 32
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1010 (2) a
Doors, Flush
Unit of Measurement : sq.m.
Output per hour - As Submitted : 0.36
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 2.00 101.43 202.86
b. Skilled Laborer 1 2.00 73.65 147.30
c. Unskilled Laborer 1 2.00 56.72 113.44
Sub- Total for A.1- As Submitted 463.60
Labor
a. Construction foreman 1 2.00 101.43 202.86
A.2 b. Skilled Laborer 1 2.00 73.65 147.30
c. Unskilled Laborer 1 2.00 56.72 113.44
Sub- Total for A.2- As Evaluated 463.60
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 46.36
Sub- Total for B.1- As Submitted 46.36
Equipment
B.2 Minor Tools (10% of Labor Cost) 46.36
Sub- Total for B.2- As Evaluated 46.36
C.1 Total (A.1 + B.1) - As Submitted 509.96
C.2 Total (A.2 + B.2) - As Evaluated 509.96
D.1 Output per hour - As Submitted 0.36
D.2 Output per hour - As Evaluated 0.36
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,416.56
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,416.56
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a.Wooden Flush Door sq.m. 1.00 1,800.00 1,800.00
Sub- Total for F.1- As Submitted 1,800.00
Materials
F.2 a.Wooden Flush Door sq.m. 1.00 1,800.00 1,800.00
Sub- Total for F.1- As Submitted 1,800.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 3,216.56
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 3,216.56
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 482.48
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 482.48
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 321.66
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 321.66
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 201.03
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 201.03
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 4,221.73
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 4,221.73

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 33
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1013 (2) b1
Fabricated Metal Roofing Accessory, gauge 24, Gutters
Unit of Measurement : l.m.
Output per hour - As Submitted : 11.80
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 11.80
D.2 Output per hour - As Evaluated 11.80
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 21.61
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 21.61
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Gutter (0.6 mm) m 1.00 168.00 168.00
F.1
b. 12" x 1" Plain GI Strap pc 3.00 40.00 120.00
c. Blind Rivets pc 16.00 1.50 24.00
c. Consumables (3% of Materials Cost) 9.36
Sub- Total for F.1- As Submitted 321.36
Materials
a. Gutter (0.6 mm) m 1.00 168.00 168.00
b. 12" x 1" Plain GI Strap pc 3.00 40.00 120.00
F.2
c. Blind Rivets pc 16.00 1.50 24.00
c. Consumables (3% of Materials Cost) 9.36
Sub- Total for F.1- As Submitted 321.36
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 342.97
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 342.97
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 51.45
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 51.45
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 34.30
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 34.30
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 21.44
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 21.44
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 450.15
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 450.15

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 34
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1014 (1) b2
Prepainted Metal Sheets, above 0.427 mm, Rib Type, Long Span
Unit of Measurement : sq.m.
Output per hour - As Submitted : 2.08
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.1- As Submitted 288.52
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 2 1.00 56.72 113.44
Sub- Total for A.2- As Evaluated 288.52
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.1- As Submitted 28.85
Equipment
B.2 Minor Tools (10% of Labor Cost) 28.85
Sub- Total for B.2- As Evaluated 28.85
C.1 Total (A.1 + B.1) - As Submitted 317.37
C.2 Total (A.2 + B.2) - As Evaluated 317.37
D.1 Output per hour - As Submitted 2.08
D.2 Output per hour - As Evaluated 2.08
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 152.88
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 152.88
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Prepainted Metal Sheets (Corrugated, Short sq.m. 1.05 370.00 388.50
F.1 Span/ Long Span, below 0.427mm thk/ above -
0.427mm thk) -
b. Tek screw/J-bolt with washers pc 10.00 4.00 40.00
c. Consumables (3% of Materials Cost) 12.86
Sub- Total for F.1- As Submitted 441.36
Materials
a. Prepainted Metal Sheets (Corrugated, Short sq.m. 1.05 370.00 388.50
Span/ Long Span, below 0.427mm thk/ above -
F.2 0.427mm thk) -
b. Tek screw/J-bolt with washers pc 10.00 4.00 40.00
c. Consumables (3% of Materials Cost) 12.86
Sub- Total for F.1- As Submitted 441.36
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 594.23
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 594.23
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 89.13
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 89.13
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 59.42
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 59.42
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 37.14
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 37.14
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 779.93
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 779.93

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 35
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1016 (1) a
Waterproofing, Cement-base
Unit of Measurement : sq.m
Output per hour - As Submitted : 1.88
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 1.88
D.2 Output per hour - As Evaluated 1.88
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 135.99
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 135.99
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
a. Cement-based waterproofing sq.m. 1.05 45.00 47.25
Sub- Total for F.1- As Submitted 47.25
Materials
F.2 a. Cement-based waterproofing sq.m. 1.05 45.00 47.25
Sub- Total for F.1- As Submitted 141.75
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 183.24
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 183.24
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 27.49
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 27.49
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 18.32
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 18.32
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 11.45
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 11.45
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 240.50
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 240.50

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 36
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1018 (1)
Glazed Tiles and Trims
Unit of Measurement : sq.m
Output per hour - As Submitted : 1.37
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 5 1.00 73.65 368.25
c. Unskilled Laborer 5 1.00 56.72 283.60
Sub- Total for A.1- As Submitted 753.28
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 5 1.00 73.65 368.25
c. Unskilled Laborer 5 1.00 56.72 283.60
Sub- Total for A.2- As Evaluated 753.28
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 75.33
Sub- Total for B.1- As Submitted 75.33
Equipment
B.2 Minor Tools (10% of Labor Cost) 75.33
Sub- Total for B.2- As Evaluated 75.33
C.1 Total (A.1 + B.1) - As Submitted 828.61
C.2 Total (A.2 + B.2) - As Evaluated 828.61
D.1 Output per hour - As Submitted 1.37
D.2 Output per hour - As Evaluated 1.37
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 607.04
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 607.04
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Glazed Tiles sq.m. 1.05 740.00 777.00
b. Cement bags 0.325 254.00 82.55
F.1
c. Sand cu.m. 0.026 1,008.50 26.22
d. Tile Grout bags 0.125 116.00 14.50
e. Tile Adhesive bags 0.143 306.40 43.82
f. Consumables (3% of Materials Cost) 28.32
Sub- Total for F.1- As Submitted 972.41
Materials
a. Glazed Tiles sq.m. 1.05 740.00 777.00
b. Cement bags 0.325 254.00 82.55
c. Sand cu.m. 0.026 1,008.50 26.22
F.2
d. Tile Grout bags 0.125 116.00 14.50
e. Tile Adhesive bags 0.143 306.40 43.82
f. Consumables (3% of Materials Cost) 28.32
Sub- Total for F.1- As Submitted 972.41
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 1,579.45
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 1,579.45
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 236.92
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 236.92
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 157.94
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 157.94
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 98.72
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 98.72
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 2,073.02
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 2,073.02

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 37
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1018 (2)
Unglazed Tiles
Unit of Measurement : sq.m
Output per hour - As Submitted : 1.95
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 5 1.00 73.65 368.25
c. Unskilled Laborer 5 1.00 56.72 283.60
Sub- Total for A.1- As Submitted 753.28
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 5 1.00 73.65 368.25
c. Unskilled Laborer 5 1.00 56.72 283.60
Sub- Total for A.2- As Evaluated 753.28
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 75.33
Sub- Total for B.1- As Submitted 75.33
Equipment
B.2 Minor Tools (10% of Labor Cost) 75.33
Sub- Total for B.2- As Evaluated 75.33
C.1 Total (A.1 + B.1) - As Submitted 828.61
C.2 Total (A.2 + B.2) - As Evaluated 828.61
D.1 Output per hour - As Submitted 1.95
D.2 Output per hour - As Evaluated 1.95
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 424.93
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 424.93
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Unglazed Tiles/ Granite Tiles/ Synthetic sq.m. 1.05 350.00 367.50
F.1 Granite -
b. Cement bags 0.33 254.00 82.55
c. Sand cu.m. 0.03 1,008.50 26.22
d. Tile Grout bags 0.13 116.00 14.50
Sub- Total for F.1- As Submitted 490.77
Materials
a. Unglazed Tiles/ Granite Tiles/ Synthetic sq.m. 1.05 350.00 367.50
Granite -
F.2 b. Cement bags 0.33 254.00 82.55
c. Sand cu.m. 0.03 1,008.50 26.22
d. Tile Grout bags 0.13 116.00 14.50
Sub- Total for F.1- As Submitted 490.77
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 915.70
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 915.70
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 137.35
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 137.35
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 91.57
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 91.57
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 57.23
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 57.23
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 1,201.85
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 1,201.85

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 38
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1027 (1)
Cement Plaster Finish
Unit of Measurement : sq.m
Output per hour - As Submitted : 7.13
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 4 1.00 56.72 226.88
Sub- Total for A.1- As Submitted 475.61
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 4 1.00 56.72 226.88
Sub- Total for A.2- As Evaluated 475.61
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 47.56
Sub- Total for B.1- As Submitted 47.56
Equipment
B.2 Minor Tools (10% of Labor Cost) 47.56
Sub- Total for B.2- As Evaluated 47.56
C.1 Total (A.1 + B.1) - As Submitted 523.17
C.2 Total (A.2 + B.2) - As Evaluated 523.17
D.1 Output per hour - As Submitted 7.13
D.2 Output per hour - As Evaluated 7.13
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 73.43
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 73.43
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
a. Cement bag 0.33 254.00 83.82
b. Sand cu.m. 0.03 1,008.50 27.23
Sub- Total for F.1- As Submitted 111.05
Materials
a. Cement bag 0.33 254.00 83.82
F.2
b. Sand cu.m. 0.027 1,008.50 27.23
Sub- Total for F.1- As Submitted 111.05
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 184.48
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 184.48
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 27.67
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 27.67
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 18.45
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 18.45
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 11.53
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 11.53
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 242.13
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 242.13

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 39
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1032 (1) a
Painting Works, Masonry/Concrete
Unit of Measurement : sq.m
Output per hour - As Submitted : 2.10
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 305.45
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 305.45
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 30.55
Sub- Total for B.1- As Submitted 30.55
Equipment
B.2 Minor Tools (10% of Labor Cost) 30.55
Sub- Total for B.2- As Evaluated 30.55
C.1 Total (A.1 + B.1) - As Submitted 336.00
C.2 Total (A.2 + B.2) - As Evaluated 336.00
D.1 Output per hour - As Submitted 2.10
D.2 Output per hour - As Evaluated 2.10
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 160.00
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 160.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Concrete Neutralizer gal 0.02 112.00 2.24
F.1 b. Concrete Sealer/Primer gal 0.04 190.00 7.60
c. Patching Compound gal 0.05 60.00 3.00
d. Semi Gloss Latex (two coat only) gal 0.08 595.00 47.60
e. Consumables (5% of Materials Cost) 3.02
Sub- Total for F.1- As Submitted 63.46
Materials
a. Concrete Neutralizer gal 0.02 112.00 2.24
b. Concrete Sealer/Primer gal 0.04 190.00 7.60
F.2 c. Patching Compound gal 0.05 60.00 3.00
d. Semi Gloss Latex (two coat only) gal 0.08 595.00 47.60
e. Consumables (5% of Materials Cost) 3.02
Sub- Total for F.1- As Submitted 63.46
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 223.46
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 223.46
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 33.52
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 33.52
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 22.35
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 22.35
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 13.97
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 13.97
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 293.29
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 293.29

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 40
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1046 (2) a1
CHB Non Load Bearing (including Reinforcing Steel), 100 mm
Unit of Measurement : sq.m
Output per hour - As Submitted : 3.83
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 418.89
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 418.89
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 41.89
Sub- Total for B.1- As Submitted 41.89
Equipment
B.2 Minor Tools (10% of Labor Cost) 41.89
Sub- Total for B.2- As Evaluated 41.89
C.1 Total (A.1 + B.1) - As Submitted 460.78
C.2 Total (A.2 + B.2) - As Evaluated 460.78
D.1 Output per hour - As Submitted 3.83
D.2 Output per hour - As Evaluated 3.83
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 120.47
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 120.47
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 100 mm thk. CHB (Ordinary) pc 13.00 20.00 260.00
F.1 b. Cement bag 0.53 254.00 133.35
c. Sand cu.m 0.04 1,008.50 40.34
d. Reinforcing Steel kg 3.24 41.00 132.84
e. #16 Tie Wire kg 0.05 87.00 4.35
Sub- Total for F.1- As Submitted 570.88
Materials
a. 100 mm thk. CHB (Ordinary) pc 13.00 20.00 260.00
b. Cement bag 0.53 254.00 133.35
F.2 c. Sand cu.m 0.04 1,008.50 40.34
d. Reinforcing Steel kg 3.24 41.00 132.84
e. #16 Tie Wire kg 0.05 87.00 4.35
Sub- Total for F.1- As Submitted 570.88
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 691.35
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 691.35
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 103.70
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 103.70
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 69.13
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 69.13
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 43.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 43.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 907.39
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 907.39

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 41
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1046 (2) a2
CHB Non Load Bearing (including Reinforcing Steel), 150 mm
Unit of Measurement : sq.m
Output per hour - As Submitted : 3.18
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 1.00 101.43 101.43
b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 3 1.00 56.72 170.16
Sub- Total for A.1- As Submitted 418.89
Labor
a. Construction foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 3 1.00 56.72 170.16
Sub- Total for A.2- As Evaluated 418.89
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 41.89
Sub- Total for B.1- As Submitted 41.89
Equipment
B.2 Minor Tools (10% of Labor Cost) 41.89
Sub- Total for B.2- As Evaluated 41.89
C.1 Total (A.1 + B.1) - As Submitted 460.78
C.2 Total (A.2 + B.2) - As Evaluated 460.78
D.1 Output per hour - As Submitted 3.18
D.2 Output per hour - As Evaluated 3.18
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 144.90
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 144.90
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 150 mm thk. CHB (Ordinary) pc 13.00 22.00 286.00
F.1 b. Cement bag 1.50 254.00 381.00
c. Sand cu.m 0.04 1,008.50 40.34
d. Reinforcing Steel kg 3.24 41.00 132.84
e. #16 Tie Wire kg 0.05 87.00 4.35
Sub- Total for F.1- As Submitted 844.53
Materials
a. 150 mm thk. CHB (Ordinary) pc 13.00 22.00 286.00
b. Cement bag 1.50 254.00 381.00
F.2 c. Sand cu.m 0.04 1,008.50 40.34
d. Reinforcing Steel kg 3.24 41.00 132.84
e. #16 Tie Wire kg 0.05 87.00 4.35
Sub- Total for F.1- As Submitted 844.53
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 989.43
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 989.43
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 148.41
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 148.41
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 98.94
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 98.94
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 61.84
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 61.84
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 1,298.63
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 1,298.63

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 42
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1047 (2) a
Structural Steel, Trusses
Unit of Measurement : kg
Output per hour - As Submitted : 85.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
Fabrication
a. Construction Foreman 1 1.00 101.43 101.43
A.1 b. Skilled Laborer 2 1.00 73.65 147.30
c. Unskilled Laborer 2 1.00 56.72 113.44
Erection -
a. Skilled Laborer 3 0.49 73.65 108.27
b. Unskilled Laborer 3 0.49 56.72 83.38
Sub- Total for A.1- As Submitted 553.81
Labor
Fabrication
a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Laborer 2 1.00 73.65 147.30
A.2 c. Unskilled Laborer 2 1.00 56.72 113.44
Erection -
a. Skilled Laborer 3 0.49 73.65 108.27
b. Unskilled Laborer 3 0.49 56.72 83.38
Sub- Total for A.2- As Evaluated 553.81
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
a. Welding Machine 1 0.75 371.00 278.25
B.1
b .Cutting Outfit 1 0.25 45.45 11.36
c. Truck Mounted Crane (20-25 mt) 1 0.49 1,631.00 799.19
Minor Tools (10% of Labor Cost) 55.38
Sub- Total for B.1- As Submitted 1,144.18
Equipment
a. Welding Machine 1 0.75 371.00 278.25
b .Cutting Outfit 1 0.25 45.45 11.36
B.2
c. Truck Mounted Crane (20-25 mt) 1 0.49 1,631.00 799.19
Minor Tools (10% of Labor Cost) 55.38
Sub- Total for B.2- As Evaluated 1,144.18
C.1 Total (A.1 + B.1) - As Submitted 1,698.00
C.2 Total (A.2 + B.2) - As Evaluated 1,698.00
D.1 Output per hour - As Submitted 85.00
D.2 Output per hour - As Evaluated 85.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 19.98
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 19.98
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Structural Steel Framing including kg 1.00 50.00 50.00
cross bracing,truss,purlins) -
F.1
b. Acetylene kg 0.01 60.00 0.66
c. Oxygen kg 0.02 30.00 0.66
d. Welding Rod kg 0.02 110.00 2.20
e. Consumables (5% of Materials Cost) 2.68
Sub- Total for F.1- As Submitted 56.20
Materials
a. Structural Steel Framing including kg 1.00 50.00 50.00
cross bracing,truss,purlins) -
b. Acetylene kg 0.01 60.00 0.66
F.2
c. Oxygen kg 0.02 30.00 0.66
d. Welding Rod kg 0.02 110.00 2.20
e. Consumables (5% of Materials Cost) 2.68
Sub- Total for F.1- As Submitted 56.20
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 76.17
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 76.17
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 11.43
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 11.43
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 7.62
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 7.62
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 4.76
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 4.76
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 99.98
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 99.98

Prepared by: Checked/ Reviewed by:

Page 43
PRINCESS M. MURIA
Engineer II
#REF! Construction Section
Err:509

Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1047 (6)
Metal Structure Accessories (Steel Plates)
Unit of Measurement : kgs.
Output per hour - As Submitted : 12.995
Output per hour - As Evaluated : .

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction Foreman 1 1.00 101.43 101.43
b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.1- As Submitted 231.80
Labor
a. Construction Foreman 1 1.00 101.43 101.43
A.2 b. Skilled Laborer 1 1.00 73.65 73.65
c. Unskilled Laborer 1 1.00 56.72 56.72
Sub- Total for A.2- As Evaluated 231.80
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.1- As Submitted 23.18
Equipment
B.2 Minor Tools (10% of Labor Cost) 23.18
Sub- Total for B.2- As Evaluated 23.18
C.1 Total (A.1 + B.1) - As Submitted 254.98
C.2 Total (A.2 + B.2) - As Evaluated 254.98
D.1 Output per hour - As Submitted 13.00
D.2 Output per hour - As Evaluated 13.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 19.62
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 19.62
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
a. Steel Plates kgs. 1.05 50.00 52.50
Consumables (3% of materials cost) 1.58
Sub- Total for F.1- As Submitted 54.08
Materials
a. Steel Plates kgs. 1.05 50.00 52.50
F.2
Consumables (3% of materials cost) 1.58
Sub- Total for F.1- As Submitted 54.08
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 73.70
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 73.70
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 11.05
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 11.05
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 7.37
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 7.37
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 4.61
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 4.61
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 96.73
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 96.73

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 44
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1051 (6)
Railing
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Construction foreman 1 8.00 101.43 811.44
b. Skilled Laborer 2 8.00 73.65 1,178.40
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.1- As Submitted 2,897.36
Labor
a. Construction foreman 1 8.00 101.43 811.44
A.2 b. Skilled Laborer 2 8.00 73.65 1,178.40
c. Unskilled Laborer 2 8.00 56.72 907.52
Sub- Total for A.2- As Evaluated 2,897.36
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Equipment
B.1 a. Welding machine 1 8.00 371.00 2,968.00
b. Cutting outfit 1 6.00 45.45 272.70
Minor Tools (10% of Labor Cost) 289.74
Sub- Total for B.1- As Submitted 3,530.44
Equipment
a. Welding machine 1 8.00 371.00 2,968.00
B.2 b. Cutting outfit 1 6.00 45.45 272.70
Minor Tools (10% of Labor Cost) 289.74
Sub- Total for B.2- As Evaluated 3,530.44
C.1 Total (A.1 + B.1) - As Submitted 6,427.80
C.2 Total (A.2 + B.2) - As Evaluated 6,427.80
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 6,427.80
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 6,427.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 38mm dia. G.I. Pipe pc 20.00 1,074.00 21,480.00
F.1 b. Prefab L-type Grab Bar 38mm x 1m x 1m pc 4.00 4,500.00 18,000.00
c. Prefab Stainless Steel Grab bar 38mm x 800mm pc 4.00 1,000.00 4,000.00
d. Welding Rod kg 5.00 110.00 550.00
Cosumable (5%) 2,201.50
Sub- Total for F.1- As Submitted 46,231.50
Materials
a. 38mm dia. G.I. Pipe pc 20.00 1,074.00 21,480.00
b. Prefab L-type Grab Bar 38mm x 1m x 1m pc 4.00 4,500.00 18,000.00
F.2 c. Prefab Stainless Steel Grab bar 38mm x 800mm pc 4.00 1,000.00 4,000.00
d. Welding Rod kg 5.00 110.00 550.00
Cosumable (5%) 2,201.50
Sub- Total for F.1- As Submitted 46,231.50
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 52,659.30
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 52,659.30
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 7,898.89
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 7,898.89
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 5,265.93
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 5,265.93
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 3,291.21
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 3,291.21
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 69,115.33
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 69,115.33

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 45
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1100 (10)
Conduits, Boxes and Fittings (Conduit Works/Conduit Rough-in)
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.1- As Submitted 7,372.32
Labor
a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
A.2 b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.2- As Evaluated 7,372.32
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.1- As Submitted 737.23
Equipment
B.2 Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.2- As Evaluated 737.23
C.1 Total (A.1 + B.1) - As Submitted 8,109.55
C.2 Total (A.2 + B.2) - As Evaluated 8,109.55
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 8,109.55
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 8,109.55
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
20 mmΦ uPVC Pipe m 160.00 30.67 4,906.67
20 mmΦ uPVC Elbow pcs 30.00 20.00 600.00
20 mmΦ uPVC Adapter with locknut sets 20.00 14.00 280.00
40 mmΦ uPVC Pipe m 15.00 230.00 3,450.00
F.1 40 mmΦ uPVC Elbow pcs 5.00 64.00 320.00
40 mmΦ uPVC Adapter with locknut sets 2.00 40.00 80.00
Utility box, 2" X 4" PVC pcs 15.00 38.00 570.00
Octagonal Junction Box, 4" X 4" with cover uPVC sets 8.00 32.00 256.00
Square Box with cover, uPVC sets 8.00 43.00 344.00
G.I. Wire gauge 16 kgs 5.00 87.00 435.00
Consumables (3% of material cost) 337.25
Sub- Total for F.1- As Submitted 11,578.92
Materials
20 mmΦ uPVC Pipe m 160.00 30.67 4,906.67
20 mmΦ uPVC Elbow pcs 30.00 20.00 600.00
20 mmΦ uPVC Adapter with locknut sets 20.00 14.00 280.00
40 mmΦ uPVC Pipe m 15.00 230.00 3,450.00
40 mmΦ uPVC Elbow pcs 5.00 64.00 320.00
F.2 40 mmΦ uPVC Adapter with locknut sets 2.00 40.00 80.00
Utility box, 2" X 4" PVC pcs 15.00 38.00 570.00
Octagonal Junction Box, 4" X 4" with cover uPVC sets 8.00 32.00 256.00
Square Box with cover, uPVC sets 8.00 43.00 344.00
G.I. Wire gauge 16 kgs 5.00 87.00 435.00
Consumables (3% of material cost) 337.25
Sub- Total for F.1- As Submitted 11,578.92
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 19,688.47
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 19,688.47
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 2,953.27
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 2,953.27
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 1,968.85
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 1,968.85
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 1,230.53
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 1,230.53
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 25,841.12
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 25,841.12

Prepared by: Checked/ Reviewed by:

Page 46
PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 47
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1101 (33)
Wires and Wiring Devices
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.1- As Submitted 7,372.32
Labor
a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
A.2 b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.2- As Evaluated 7,372.32
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.1- As Submitted 737.23
Equipment
B.2 Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.2- As Evaluated 737.23
C.1 Total (A.1 + B.1) - As Submitted 8,109.55
C.2 Total (A.2 + B.2) - As Evaluated 8,109.55
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 8,109.55
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 8,109.55
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
2.0 sq. mm. THHN m 150.00 20.00 3,000.00
3.5 sq. mm. THHN m 310.00 25.00 7,750.00
5.5 sq. mm. THHN m 12.00 36.00 432.00
14 sq. mm. THHN m 10.00 99.00 990.00
F.1 22 sq. mm. THHN m 20.00 143.00 2,860.00
PVC Electrical tape, big m 5.00 27.00 135.00
Single Pole Wall Switch on one switch plate sets 3.00 65.00 195.00
Duplex (2 Single Pole Wall Switches on one switch plate) sets 1.00 95.00 95.00
Single Convenience Outlet / Receptacle, Grounding Type (GT), 16A sets 2.00 90.00 180.00
Duplex Universal Convenience Outlets/Receptacles (GT), 16A sets 7.00 95.00 665.00
Consumables (3% of material cost) 489.06
Sub- Total for F.1- As Submitted 16,791.06
Materials
2.0 sq. mm. THHN m 150.00 20.00 3,000.00
3.5 sq. mm. THHN m 310.00 25.00 7,750.00
5.5 sq. mm. THHN m 12.00 36.00 432.00
14 sq. mm. THHN m 10.00 99.00 990.00
22 sq. mm. THHN m 20.00 143.00 2,860.00
F.2 PVC Electrical tape, big m 5.00 27.00 135.00
Single Pole Wall Switch on one switch plate sets 3.00 65.00 195.00
Duplex (2 Single Pole Wall Switches on one switch plate) sets 1.00 95.00 95.00
Single Convenience Outlet / Receptacle, Grounding Type (GT), 16A sets 2.00 90.00 180.00
Duplex Universal Convenience Outlets/Receptacles (GT), 16A sets 7.00 95.00 665.00
Consumables (3% of material cost) 489.06
Sub- Total for F.1- As Evaluated 16,791.06
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 24,900.61
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 24,900.61
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 3,735.09
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 3,735.09
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 2,490.06
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 2,490.06
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 1,556.29
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 1,556.29
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 32,682.05
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 32,682.05

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II

Page 48
#REF! Construction Section

Page 49
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1102 (1)
Panelboard with Main & Branch Breakers
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
b. Reg. Master Electrician / NCII Electrician 3 40.00 92.31 11,077.20
c. Helper 6 40.00 56.72 13,612.80
Sub- Total for A.1- As Submitted 28,747.20
Labor
a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
A.2 b. Reg. Master Electrician / NCII Electrician 3 40.00 92.31 11,077.20
c. Helper 6 40.00 56.72 13,612.80
Sub- Total for A.2- As Evaluated 28,747.20
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10 % of Labor Cost) 2,874.72
Sub- Total for B.1- As Submitted 2,874.72
Equipment
B.2 Minor Tools (10 % of Labor Cost) 2,874.72
Sub- Total for B.2- As Evaluated 2,874.72
C.1 Total (A.1 + B.1) - As Submitted 31,621.92
C.2 Total (A.2 + B.2) - As Evaluated 31,621.92
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 31,621.92
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 31,621.92
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Main: 70AT/150AF, 2P, 4 Branches, Bolt-on type, NEMA 3R ENCLOSURE, 240VAC 40KAI set 1.00 4,949.00 4,949.00
F.1
Branches: 20AT, 2P, BOLT-ON TYPE pc 3.00 532.00 1,596.00
30AT, 2P, BOLT-ON TYPE pc 2.00 532.00 1,064.00
Consumables (3% of material cost) 228.27
Sub- Total for F.1- As Submitted 7,837.27
Materials
Main: 70AT/150AF, 2P, 4 Branches, Bolt-on type, NEMA 3R ENCLOSURE, 240VAC 40KAI set 1.00 4,949.00 4,949.00
Branches: 20AT, 2P, BOLT-ON TYPE pc 3.00 532.00 1,596.00
F.2
30AT, 2P, BOLT-ON TYPE pc 2.00 532.00 1,064.00
Consumables (3% of material cost) 228.27
Sub- Total for F.1- As Evaluated 7,837.27
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 39,459.19
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 39,459.19
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 5,918.88
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 5,918.88
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 3,945.92
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 3,945.92
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 2,466.20
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 2,466.20
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 51,790.19
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 51,790.19

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 50
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1103 (1)
Lighting Fixtures and Lamps
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.1- As Submitted 7,372.32
Labor
a. Reg. Electrical Engr. 1 24.00 101.43 2,434.32
A.2 b. Reg. Master Electrician / NCII Electrician 1 24.00 92.31 2,215.44
c. Helper 2 24.00 56.72 2,722.56
Sub- Total for A.2- As Evaluated 7,372.32
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.1- As Submitted 737.23
Equipment
B.2 Minor Tools (10% of Labor Cost) 737.23
Sub- Total for B.2- As Evaluated 737.23
C.1 Total (A.1 + B.1) - As Submitted 8,109.55
C.2 Total (A.2 + B.2) - As Evaluated 8,109.55
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 8,109.55
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 8,109.55
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Twinhead Emergency Lamp 2x6Watts Bulb 6V 10Ah pcs 2.00 2,199.00 4,398.00
Louver - Surface Type w/ Aluminum Reflector - Fixture Only - 2X20W pcs 6.00 1,200.00 7,200.00
F.1 Led Fluorescent Tube 18W pcs 12.00 700.00 8,400.00
Led Bulb 14W pcs 6.00 300.00 1,800.00
Ceiling Receptacle 3½” set 3.00 25.00 75.00
Wall Lamp Fixture pcs 6.00 929.00 5,574.00
Consumables (3% of material coConsumab Consumables (3% of material cost) 823.41
Sub- Total for F.1- As Submitted 28,270.41
Materials
Twinhead Emergency Lamp 2x6Watts Bulb 6V 10Ah pcs 2.00 2,199.00 4,398.00
Louver - Surface Type w/ Aluminum Reflector - Fixture Only - 2X20W pcs 6.00 1,200.00 7,200.00
Led Fluorescent Tube 18W pcs 12.00 700.00 8,400.00
F.2 Led Bulb 14W pcs 6.00 300.00 1,800.00
Ceiling Receptacle 3½” set 3.00 25.00 75.00
Wall Lamp Fixture pcs 6.00 929.00 5,574.00
Consumables (3% of material cost) 823.41
Sub- Total for F.1- As Evaluated 28,270.41
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 36,379.96
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 36,379.96
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 5,456.99
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 5,456.99
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 3,638.00
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 3,638.00
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 2,273.75
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 2,273.75
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 47,748.70
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 47,748.70

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 51
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1105 (20)
Network Cabling
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 16.00 101.43 1,622.88
b. Reg. Master Electrician / NCII Electrician 1 16.00 92.31 1,476.96
c. Helper 2 16.00 56.72 1,815.04
Sub- Total for A.1- As Submitted 4,914.88
Labor
a. Reg. Electrical Engr. 1 16.00 101.43 1,622.88
A.2 b. Reg. Master Electrician / NCII Electrician 1 16.00 92.31 1,476.96
c. Helper 2 16.00 56.72 1,815.04
Sub- Total for A.2- As Evaluated 4,914.88
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 491.49
Sub- Total for B.1- As Submitted 491.49
Equipment
B.2 Minor Tools (10% of Labor Cost) 491.49
Sub- Total for B.2- As Evaluated 491.49
C.1 Total (A.1 + B.1) - As Submitted 5,406.37
C.2 Total (A.2 + B.2) - As Evaluated 5,406.37
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 5,406.37
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 5,406.37
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Telephone / Data Cabinet (304mm X 457mm X 127mm) GUAGE # 16, NEMA3R set 1.00 1,950.00 1,950.00
F.1
UTP CAT5 Cable (Telephone Jacketed Wire CAT 5E) m 15.00 15.00 225.00
Wall Plate Single (Teephone outlet, RJ 45) sets 1.00 200.00 200.00
Consumables (3% of material cost) 71.25
Sub- Total for F.1- As Submitted 2,446.25
Materials
Telephone / Data Cabinet (304mm X 457mm X 127mm) GUAGE # 16, NEMA3R set 1.00 1,950.00 1,950.00
UTP CAT5 Cable (Telephone Jacketed Wire CAT 5E) m 15.00 15.00 225.00
F.2
Wall Plate Single (Teephone outlet, RJ 45) sets 1.00 200.00 200.00
Consumables (3% of material cost) 71.25
Sub- Total for F.1- As Evaluated 2,446.25
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 7,852.62
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 7,852.62
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 1,177.89
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 1,177.89
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 785.26
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 785.26
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 490.79
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 490.79
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 10,306.56
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 10,306.56

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 52
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1109 (1)
Grounding System
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
b. Reg. Master Electrician / NCII Electrician 2 40.00 92.31 7,384.80
c. Helper 4 40.00 56.72 9,075.20
Sub- Total for A.1- As Submitted 20,517.20
Labor
a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
A.2 b. Reg. Master Electrician / NCII Electrician 2 40.00 92.31 7,384.80
c. Helper 4 40.00 56.72 9,075.20
Sub- Total for A.2- As Evaluated 20,517.20
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment

Sub- Total for B.1- As Submitted -


Equipment
B.2
Sub- Total for B.2- As Evaluated -
C.1 Total (A.1 + B.1) - As Submitted 20,517.20
C.2 Total (A.2 + B.2) - As Evaluated 20,517.20
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 20,517.20
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 20,517.20
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 Exothermic Weld Connector pcs 13.00 250.00 3,250.00
Bare Copper Wire, 50mm2 m 65.00 375.00 24,375.00
Grounding Rod Copper Clad 3m X 16mm dia. pcs 6.00 350.00 2,100.00
Sub- Total for F.1- As Submitted 29,725.00
Materials
Exothermic Weld Connector pcs 13.00 250.00 3,250.00
F.2 Bare Copper Wire, 50mm2 m 65.00 375.00 24,375.00
Grounding Rod Copper Clad 3m X 16mm dia. pcs 6.00 350.00 2,100.00
Sub- Total for F.1- As Evaluated 29,725.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 50,242.20
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 50,242.20
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 7,536.33
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 7,536.33
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 5,024.22
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 5,024.22
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 3,140.14
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 3,140.14
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 65,942.89
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 65,942.89

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 53
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1111 (8)
2 Spool Insulator Wire Rack
Unit of Measurement : Set
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 4.00 101.43 405.72
b. Reg. Master Electrician / NCII Electrician 1 4.00 92.31 369.24
c. Helper 2 4.00 56.72 453.76
Sub- Total for A.1- As Submitted 1,228.72
Labor
a. Reg. Electrical Engr. 1 4.00 101.43 405.72
A.2 b. Reg. Master Electrician / NCII Electrician 1 4.00 92.31 369.24
c. Helper 2 4.00 56.72 453.76
Sub- Total for A.2- As Evaluated 1,228.72
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 122.87
Sub- Total for B.1- As Submitted 122.87
Equipment
B.2 Minor Tools (10% of Labor Cost) 122.87
Sub- Total for B.2- As Evaluated 122.87
C.1 Total (A.1 + B.1) - As Submitted 1,351.59
C.2 Total (A.2 + B.2) - As Evaluated 1,351.59
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,351.59
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,351.59
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
2 Spool Insulator Wire Rack set 2.00 420.00 840.00
Consumables (3% of material cost) 25.20
Sub- Total for F.1- As Submitted 865.20
Materials
2 Spool Insulator Wire Rack set 2.00 420.00 840.00
F.2
Consumables (3% of material cost) 25.20
Sub- Total for F.1- As Evaluated 865.20
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 2,216.79
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 2,216.79
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 332.52
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 332.52
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 221.68
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 221.68
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 138.55
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 138.55
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 2,909.54
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 2,909.54

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 54
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1202 (6) a1
Fire Extinguisher, 10 lbs, ABC with bracket
Unit of Measurement : Set
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


A.1 Labor
Reg. Master Electrician / NCII Electrician 1 1.00 92.31 92.31
Sub- Total for A.1- As Submitted 92.31
Labor
A.2 Reg. Master Electrician / NCII Electrician 1 1.00 92.31 92.31
Sub- Total for A.2- As Evaluated 92.31
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 9.23
Sub- Total for B.1- As Submitted 9.23
Equipment
B.2 Minor Tools (10% of Labor Cost) 9.23
Sub- Total for B.2- As Evaluated 9.23
C.1 Total (A.1 + B.1) - As Submitted 101.54
C.2 Total (A.2 + B.2) - As Evaluated 101.54
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 101.54
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 101.54
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
Fire Extuinguisher, 10 Lbs, ABC, with bracket set 2.00 4,100.00 8,200.00
Sub- Total for F.1- As Submitted 8,200.00
Materials
F.2 Fire Extuinguisher, 10 Lbs, ABC, with bracket set 2.00 4,100.00 8,200.00
Sub- Total for F.1- As Evaluated 8,200.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 8,301.54
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 8,301.54
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 1,245.23
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 1,245.23
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 830.15
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 830.15
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 518.85
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 518.85
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 10,895.77
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 10,895.77

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 55
Err:509
Err:509
DETAILED UNIT PRICE ANALYSIS (DUPA)

FORM POW-2015-01D-00
Item No./ Description : 1208(1)
Fire Alarm System
Unit of Measurement : Lump Sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated :

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


Labor
A.1 a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
b. Reg. Master Electrician / NCII Electrician 3 40.00 92.31 11,077.20
c. Helper 6 40.00 56.72 13,612.80
Sub- Total for A.1- As Submitted 28,747.20
Labor
a. Reg. Electrical Engr. 1 40.00 101.43 4,057.20
A.2 b. Reg. Master Electrician / NCII Electrician 3 40.00 92.31 11,077.20
c. Helper 6 40.00 56.72 13,612.80
Sub- Total for A.2- As Evaluated 28,747.20
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Minor Tools (10 % of Labor Cost) 2,874.72
Sub- Total for B.1- As Submitted 2,874.72
Equipment
B.2 Minor Tools (10 % of Labor Cost) 2,874.72
Sub- Total for B.2- As Evaluated 2,874.72
C.1 Total (A.1 + B.1) - As Submitted 31,621.92
C.2 Total (A.2 + B.2) - As Evaluated 31,621.92
D.1 Output per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 31,621.92
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 31,621.92
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Smoke Detector with base set 7.00 1,950.00 13,650.00
Heat Detector with base set 2.00 1,950.00 3,900.00
F.1 Fire Alarm Bell, Vibrating type, 6" set 2.00 1,400.00 2,800.00
Fire Alarm Control Panel set 1.00 13,890.00 13,890.00
Manual Pull Station Switch Single action pc 2.00 1,500.00 3,000.00
Back-up Battery Pack, 12V DC set 1.00 1,200.00 1,200.00
Consumables (3% of material cost) 1,153.20
Sub- Total for F.1- As Submitted 39,593.20
Materials
Smoke Detector with base set 7.00 1,950.00 13,650.00
Heat Detector with base set 2.00 1,950.00 3,900.00
Fire Alarm Bell, Vibrating type, 6" set 2.00 1,400.00 2,800.00
F.2 Fire Alarm Control Panel set 1.00 13,890.00 13,890.00
Manual Pull Station Switch Single action set 2.00 1,400.00 2,800.00
Back-up Battery Pack, 12V DC set 1.00 13,890.00 13,890.00
Consumables (3% of material cost) 1,527.90
Sub- Total for F.1- As Evaluated 52,457.90
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 71,215.12
G.2 Direct Unit Cost (E.2+ F.2) - As Submitted 71,215.12
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 15% of G.1 10,682.27
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 15% of G.2 10,682.27
I.1 Contractor's Profit (CP) - As Submitted 10% of G.1 7,121.51
I.2 Contractor's Profit (CP) - As Evaluated 10% of G.2 7,121.51
J.1 Value Added Tax (VAT)- As Submitted 5% of (G.1 + H.1 + I.1) 4,450.95
J.2 Value Added Tax (VAT)- As Evaluated 5% of (G.2 + H.2 + I.2) 4,450.95
K.1 Total Unit Cost - As Submitted (G.1 + H.1 + I.1 + J.1) 93,469.85
K.2 Total Unit Cost - As Evaluated (G.2 + H.2 + I.2 + J.2) 93,469.85

Prepared by: Checked/ Reviewed by:

PRINCESS M. MURIA
Engineer II
#REF! Construction Section

Page 56
BACK-UP COMPUTATION

Mobilization / Demobilization 1.00 Lump Sum


Structure Excavation 40.15 cu.m.
Length Width Height Quantity
F1 1.10 x 1.10 x 1.20 x 23 = 33.396
Septic Tank 3.00 x 1.5 x 1.50 x 1 = 6.75

Embankment, From Roadway/Structure Excavation 26.42 cu.m.


Footing Vol. Column Vol.
F1 0.36 - 0.09 x 1.15 x 23 = 26.4236

Gravel Fill 10.39 cu.m.

Gravel bed Length Width Height Quantity


F1 1.10 x 1.10 x 0.05 x 23 = 1.3915
9.00 20.00 0.05 1 9.0000

Structural Concrete, Class A 64.26 cu.m.

Length Width Height Quantity


F1 1.10 x 1.10 x 0.30 x 23 = 8.349
SLAB ON GRADE 180.00 x 0.10 x 1 = 18
Septic Tank Concrete
length x thickness x width = volume
base 3 0.15 1.50 0.675
east side 1.5 0.15 1.50 0.3375
west side 1.5 0.15 1.50 0.3375
north side 3 0.15 1.50 0.675
south side 3 0.15 1.50 0.675
partition 1 1.5 0.15 1.20 0.27
partition 2 0 0.15 1.20 0
2.97 cu.m.

0 cu.m.
Length Width Height Quantity
TB 4.50 x 0.25 x 0.45 x 0 = 0
TB 5.50 x 0.25 x 0.45 x 0 = 0
TB 3.50 x 0.25 x 0.45 x 0 = 0
TB 2.50 x 0.25 x 0.45 x 0 = 0

8.9010 cu.m.
Length Width Height Quantity
C1 0.3 x 0.30 x 4.30 x 23 = 8.901
C2 0 x 0.00 x 0.00 x 0 = 0

18.00 cu.m
Area Thickness Qty
SLAB 180 x 0.1 x 1.000 = 18.00 cu.m.

8.04 cu.m
Height Width Length Quantity
0.00 x 0.00 x 0.00 x 0 = 0.0000
0.00 x 0.00 x 0.00 x 0 = 0.0000
fb
0.00 x 0.00 x 0.00 x 0 = 0.0000
0.00 x 0.00 x 0.00 x 0 = 0.0000
0.30 x 0.20 x 4.00 x 12 = 2.8800
0.30 x 0.20 x 3.00 x 18 = 3.2400
rb
0.30 x 0.20 x 2.50 x 4 = 0.6000
0.30 x 0.20 x 5.50 x 4 = 1.3200

Reinforcing Steel 2693.48 kgs.

MAIN REBAR Height No. of Bars Quantity


C1 4.30 x 4 x 23 = 395.60 l.m. 16mmØ
c2 0.00 x 0 x 0 = 0.00 l.m.
stair column 0.00 x 0 x 0 0.00 l.m.

LATERAL TIES No. of col No. of ties Length of ties(2x(A+B)+20D)


C1 23 x 27 x 1.35 = 838.35 l.m. 10mmØ
C2 0 x 10 x 2.00 = 0.00 l.m.
stair column 4 x 0 x 0.00 = 0.00 l.m.

MAIN REBAR Length No. of Pieces Quantity


footing1 1.10 x 7 x 23 = 177.1 l.m. 16.mmØ
0.00 x 0 x 0 = 0 l.m. 16.mmØ

FTB Length No. of Bars Quantity


0.00 x 2 x 0 = 0.00 l.m.
0.00 x 2 x 0 = 0.00 l.m.
0.00 x 2 x 0 = 0.00 l.m.
0.00 x 2 x 0 = 0.00 l.m.
FTB (L/4 + 0.3)*2 L-(2*L/5)+0.3+ No. of Bars Quantity
0.60 x 0.30 x 2 x 0 = 0.0000
0.60 x 0.30 x 2 x 0 = 0.0000
0.60 x 0.30 x 2 x 0 = 0.0000
0.60 x 0.30 x 2 x 0 = 0.0000
FTB No. of ftb No. of ties Length of ties(2x(A+B)+20D)
Lateral Rebars 0 x 5 x 1.80 = 0.00 l.m.
0 x 5 x 1.80 = 0.00 l.m.
0 x 5 x 1.80 = 0.00 l.m.
0 x 5 x 1.80 = 0.00 l.m.

FLOOR BEAM Beam Length No. of Bars Dev Length (0.3) Quantity
0.00 x 0.00 x 0.30 x 0 = 0.0000
0.00 x 0.00 x 0.30 x 0 = 0.0000
fb
0.00 x 0.00 x 0.30 x 0 = 0.0000
0.00 x 0.00 x 0.30 x 0 = 0.0000
4.00 x 4.00 x 0.30 x 12 = 57.6000 l.m. 16.mmØ
3.00 x 4.00 x 0.30 x 18 = 64.8000
rb
2.50 x 4.00 x 0.30 x 4 = 12.0000
5.50 x 4.00 x 0.30 x 4 = 26.4000
(L/4 + 0.3)*2 L-(2*L/5)+0.3+ No. of Bars Quantity
0.60 x 0.30 x 5 x 0 = 0.0000
0.60 x 0.30 x 5 x 0 = 0.0000
fb
0.60 x 0.30 x 5 x 0 = 0.0000
0.60 x 0.30 x 5 x 0 = 0.0000

STIRRUPS No. of ftb No. of ties Length of ties(2x(A+B)+20D)


0 x 5 x 1.35 = 0.0000 l.m.
0 x 5 x 1.35 = 0.0000 l.m.
fb
0 x 5 x 1.35 = 0.0000 l.m.
0 x 5 x 1.35 = 0.0000 l.m.
12 x 25 x 1.35 = 405.0000 l.m. 10mmØ
18 x 20 x 1.35 = 486.0000 l.m.
rb
4 x 17 x 1.35 = 91.8000 l.m.
4 x 32 x 1.35 = 172.8000 l.m.

GF SLAB Slab Length Spacing Bar Length


0.40 O.C. 9.00 20.00
BOTHWAYS ÷ 0.40 + 1 x = 470.0000 l.m. (12mm Ø)
0.40 O.C. 20.00 9.00
BOTHWAYS ÷ 0.40 + 1 x = 459.0000 l.m. (12mm Ø)

STAIRS No. of Steps Width


Nosing Bar 0 x 0.00 = 0.00 l.m. (10mm Ø)
Width Spacing Length per piece No. of Steps
Thread Bar 0.00 + 0.30 x 0.60 x 20 = 0 l.m.
Length Spacing Width
Rebars 0.00 + 0.20 x 1.00 = 0 l.m.
0.00 + 0.20 x 1.00 = 0 l.m.
Width Spacing Length
0.00 + 0.15 x 2.45 = 4.90 l.m.
0.00 + 0.15 x 2.50 = 5.00 l.m.

Septic Tank Steel reinforcement

10mmØ Rebars
end bend span net length set
base hor. bars 0.30 3 3.30 10.00 = 66 m
base long. bars 0.30 1.5 1.8 5.00 = 9 m
east vert. bars 0.30 1.5 1.8 5.00 = 9 m
east hor. bars 0.30 1.5 1.8 5.00 = 9 m
part 1 vert. bars 0.30 1.5 1.8 5.00 = 9 m
part 1 hor. bars 0.30 1.5 1.8 5.00 = 9 m
part 2 vert. bars 0.30 0 0.3 0.00 = 0 m
part 2 hor. bars 0.30 0 0.3 0.00 = 0 m
west t vert. bars 0.30 1.5 1.8 5.00 = 9 m
west hor. bars 0.30 1.5 1.8 5.00 = 9 m
north vert. bars 0.30 3 3.3 10.00 = 33 m
west hor. bars 0.30 1.5 1.8 5.00 = 9 m
lift bar 0 0.4 0.00 = 0 m
171 m

Area Quantity
Two-Way slab 180.00 x 0 = 0.00 l.m. 10mm Ø
(Using Slab Area)

wt factor: Weight
25 mm Ø 0.00 l.m. 3.853 0.00 kgs
20 mm Ø 0.00 l.m. 2.469 0.00 kgs
16 mm Ø 630.30 l.m. 1.580 995.87 kgs
12 mm Ø 929.00 l.m. 0.888 824.95 kgs
10 mm Ø 1414.35 l.m. 0.617 872.65 kgs

Total: 2693.48 kgs

Formworks and Falseworks 221.64 sq.m.

Length Width Height Quantity


C1 0.3 x 0.30 x 4.30 x 23.00 = 118.68 sq.m.
C1 0 x 0.00 x 0.00 x 0.00 = 0 sq.m.
Height Width Length Quantity
0.00 x 0.00 x 0.00 x 0 = 0.00 sq.m.
0.00 x 0.00 x 0.00 x 0 = 0.00 sq.m.
fb
0.00 x 0.00 x 0.00 x 0 = 0.00 sq.m.
0.00 x 0.00 x 0.00 x 0 = 0.00 sq.m.
4.00 x 0.20 x 0.30 x 12 = 30.24 sq.m.
3.00 x 0.20 x 0.30 x 18 = 34.56 sq.m.
rb
2.50 x 0.20 x 0.30 x 4 = 6.48 sq.m.
5.50 x 0.20 x 0.30 x 4 = 13.68 sq.m.

Base Area Height Quanity


180.00 x 0.100 x 1 = 18 sq.m.

Soil Poisoning 172.7232 Liter

Length Width Height Quantity Area


F1 1.10 x 1.10 x 1.20 x 23 = 60.72 sq.m.
Septic Tank 3.00 x 1.50 x 1.50 x 1 = 6.75 sq.m.
64L/25sq.m
= 172.7232 Liters

Sewer Line Works 1 Lump Sum

Plumbing Fixtures 1 Lump Sum

Cold Water Lines 1 Lump Sum

Ceiling, 4.5 mm, Metal Frame, Fiber Cement Board 180.00 sq.m.

Length height qty


D-1 2.50 x 2.15 x 1.00 = 5.375
D-2 0.90 x 2.1 x 6.00 = 11.34
D-3 0.80 x 2.1 x 1.00 = 1.68
D-4 0.70 x 1.8 x 5.00 = 6.3
D-5 0.00 x 0 x 0.00 = 0
D-6 0.00 x 0 x 0.00 = 0
D-7 0.00 x 0 x 0.00 = 0
24.695
Length height qty
W1 0.60 x 0.60 x 5.00 = 1.8
W2 1.80 x 0.60 x 2.00 = 2.16
W3 2.10 x 1.20 x 2.00 = 5.04
W4 1.20 x 1.20 x 1.00 = 1.44
W5 2.00 x 1.20 x 4.00 = 9.6
W6 0.00 x 0.00 x 0.00 = 0
W7 0.00 x 0.00 x 0.00 = 0
W8 0.00 x 0.00 x 0.00 = 0
W9 0.00 x 0.00 x 0.00 = 0
20.04

Fabricated Metal Roofing Accessory, gauge 24, Gutters 58 l.m.


flashing 58 l.m.

Prepainted Metal Sheets, above 0.427 mm, Rib Type, Long Span 242 sq.m.

Unglazed Tiles 180.00 sq.m.

Cement Plaster Finish 409.33 sq.m.

Painting Works, Masonry/Concrete 409.33 sq.m.

CHB Non Load Bearing (including Reinforcing Steel), 100 mm 0.00 sq.m.
Length height qty
0 x 0 x 0.00 = 0
2nd flr 0 x 0 x 0.00 = 0
0 x 0 x 0.00 = 0
0 x 0 x 0.00 = 0
0 x 0 x 0.00 = 0
grnd flr
0 x 0 x 0.00 = 0
0 x 0 x 0.00 = 0
0
Length height qty
D1 0.8 x 2.1 x 0.00 = 0
W1 0 x 0 x 0.00 = 0
0

CHB Non Load Bearing (including Reinforcing Steel), 150 mm 204.67 sq.m.
Length height qty
0 x 0 x 0.00 = 0
2nd flr 0 x 0 x 0.00 = 0
0 x 0 x 0.00 = 0
9 x 4.3 x 1.00 = 38.7
9 x 4.3 x 1.00 = 38.7
grnd flr
20 x 4.3 x 1.00 = 86
20 x 4.3 x 1.00 = 86
249.4
area to be deducted
Length height qty
D-1 2.50 x 2.15 x 1.00 = 5.375
D-2 0.90 x 2.10 x 6.00 = 11.34
D-3 0.80 x 2.10 x 1.00 = 1.68
D-4 0.70 x 1.80 x 5.00 = 6.3
D-5 0.00 x 0.00 x 0.00 = 0
D-6 0.00 x 0.00 x 0.00 = 0
D-7 0.00 x 0.00 x 0.00 = 0
24.695
Length height qty
W1 0.60 x 0.60 x 5.00 = 1.8
W2 1.80 x 0.60 x 2.00 = 2.16
W3 2.10 x 1.20 x 2.00 = 5.04
W4 1.20 x 1.20 x 1.00 = 1.44
W5 2.00 x 1.20 x 4.00 = 9.6
W6 0.00 x 0.00 x 0.00 = 0
W7 0.00 x 0.00 x 0.00 = 0
W8 0.00 x 0.00 x 0.00 = 0
W9 0.00 x 0.00 x 0.00 = 0
20.04

Structural Steel, Trusses 1369.14 kgs.

truss Length Quantity wt. factor


50x50x6 (top & bot. chord and king post) 155.2158 x 1 x 4.75 = 737.27505 kgs.
38x38x5(web member) 123.288 x 1 x 2.33 = 287.26104 kgs.

C purlin Length Quantity wt. factor


15 x 12 x 1.47 = 264.6 kgs.
8 x 8 x 1.25 = 80 kgs.
depends on what type of purlins

1100 (10) Conduits, Boxes and Fittings (Conduit Works/Conduit Rough-in) 1 Lump Sum
1101 (33) Wires and Wiring Devices 1 Lump Sum
1102 (1) Panelboard with Main & Branch Breakers 1 Lump Sum
1103 (1) Lighting Fixtures and Lamps 1 Lump Sum
PROJECT TITLE

Item No./ Description : Mobilization, Demobilization and Demolition


Unit of Measurement : Lump Sum
Output : 1.00
:

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 Skilled Laborer 1 4.00 550.00 2,200.00
Unskilled Labor 2 4.00 420.00 3,360.00
Sub- Total for A.1 5,560.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1
Cargo Truck 1 1.00 5,000.00 5,000.00
Miscellaneous Handtools 5,000.00
Sub- Total for B.1 10,000.00
C.1 Total (A.1 + B.1) 15,560.00
D.1 Output 1.00
E.1 Direct Unit Cost (C.1 / D.1) 15,560.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
-
Sub- Total for F.1. -
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 15,560.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1 -
I.1 Contractor's Profit (CP) . 0% of G.1 -
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 1,867.20
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 17,427.20
PROJECT TITLE
:
Item No./ Description : Site Clearing and Grabbing
Unit of Measurement : Lump Sum
Output : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1
Skilled Laborer 2 2.00 550.00 2,200.00
Unskilled Labor 2 2.00 420.00 1,680.00
Sub- Total for A.1 3,880.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1
Backhoe 1 1.00 12,000.00 12,000.00
Dump Truck 1 1.00 5,000.00 5,000.00
Miscellaneous Handtools 5,000.00
C.1 Sub- Total for B.1 22,000.00
D.1 Total (A.1 + B.1) 25,880.00
E.1 Output 1.00
Direct Unit Cost (C.1 / D.1) 25,880.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1
Materials
-
G.1 Sub- Total for F.1. -
H.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 25,880.00
I.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% of G.1 -
J.1 Contractor's Profit (CP) . 0% of G.1 -
K.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 3,105.60
Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 28,985.60
PROJECT TITLE

Item No./ Description : Structure Excavation


Unit of Measurement : cu.m.
Output per hour : 20.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 Skilled Laborer 2 2.00 550.00 2,200.00
Unskilled Labor 2 2.00 420.00 1,680.00
Sub- Total for A.1. 3,880.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1 Mini Backhoe 1 2.00 10,000.00 20,000.00
Dump Truck 1 2.00 5,000.00 10,000.00
Minor Tools (8% of Labor Cost) 310.40
Sub- Total for B.1. 30,310.40
C.1 Total (A.1 + B.1) . 34,190.40
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials

Sub- Total for F.1.


G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 34,190.40
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 3,077.14
I.1 Contractor's Profit (CP) . 8% of G.1 2,735.23
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 4,800.33
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 44,803.10
PROJECT TITLE

Item No./ Description : Embankment, From roadway/structure excavation


Unit of Measurement : cu.m.
Output per hour : 9.84

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 Skilled Laborer 2 3.00 550.00 3,300.00
Unskilled Labor 2 4.00 420.00 3,360.00
Sub- Total for A.1. 6,660.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1 Plate Compactor (5 hp) 1 3.00 984.00 2,952.00
Mini Backhoe 1 4.00 10,000.00 40,000.00
Minor Tools (8% of Labor Cost) 532.80
Sub- Total for B.1. 43,484.80
C.1 Total (A.1 + B.1) . 50,144.80
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
-
Sub- Total for F.1. -
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 50,144.80
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 4,513.03
I.1 Contractor's Profit (CP) . 8% of G.1 4,011.58
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 7,040.33
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 65,709.75
PROJECT TITLE

Item No./ Description : Gravel fill


Unit of Measurement : cu.m.
Output per hour : 1.20

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 Skilled Laborer 2 6.00 550.00 6,600.00
Unskilled Labor 4 6.00 420.00 10,080.00
Sub- Total for A.1. 16,680.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1
Plate Compactor (5 hp) 1 6.00 984.00 5,904.00
Minor Tools (8% of Labor Cost) 1,334.40
Sub- Total for B.1. 7,238.40
C.1 Total (A.1 + B.1) . 23,918.40
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
Gravel Bedding (G1) cu.m. 34.72 917.50 31,858.81
(w/ 12% Shrinkage Factor) 1,592.94
Sub- Total for F.1. 33,451.75
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 57,370.15
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 5,163.31
I.1 Contractor's Profit (CP) . 8% of G.1 4,589.61
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 8,054.77
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 75,177.85
PROJECT TITLE

Item No./ Description : Structural Concrete, Class A


Unit of Measurement : cu.m.
Output per hour : 0.27

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 Skilled Laborer 5 27.00 550.00 74,250.00
Unskilled Laborer 20 27.00 420.00 226,800.00
Sub- Total for A.1. 301,050.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1
Bagger Mixer 1 26.00 1,376.00 35,776.00
Minor Tools (12% of Labor Cost) 15,052.50
Sub- Total for B.1. 50,828.50
C.1 Total (A.1 + B.1) . 351,878.50
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 Gravel cu.m. 287.00 1,120.00 321,440.00
Sand cu.m. 144.00 850.00 122,400.00
Cement bags 2604.00 254.00 661,416.00
Sub- Total for F.1. 1,105,256.00
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 1,457,134.50
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 131,142.11
I.1 Contractor's Profit (CP) . 8% of G.1 116,570.76
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 204,581.68
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 1,909,429.05
PROJECT TITLE

Item No./ Description : Reinforcing Steel (Deformed)


Unit of Measurement : kg.
Output per hour : 129.09

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 Skilled Laborer 5 20.00 550.00 55,000.00
Unskilled Laborer 20 20.00 420.00 168,000.00
Sub- Total for A.1. 223,000.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1 Bar Cutter 1 20.00 1,758.00 58,600.00
Bar Bender 1 20.00 2,812.00 93,733.33
Minor Tools (8% of Labor Cost) 17,840.00
Sub- Total for B.1. 170,173.33
C.1 Total (A.1 + B.1) . 393,173.33
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 Deformed Reinforcing Steel kg 32978.00 41.00 1,352,098.00
#16 Galvanized iron wire kg 495.00 87.00 43,065.00
Consumables (12% of Material Cost) 69,758.15
Sub- Total for F.1. 1,464,921.15
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 1,858,094.48
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 167,228.50
I.1 Contractor's Profit (CP) . 8% of G.1 148,647.56
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 260,876.47
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 2,434,847.01
PROJECT TITLE

Item No./ Description : Formworks and Falseworks


Unit of Measurement : sq.m.
Output per hour : 4.50

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
Installation
A.1 Skilled Laborer 4 13.00 550.00 28,600.00
Unskilled Laborer 6 13.00 420.00 32,760.00
Stripping -
Unskilled Laborer 6 13.00 420.00 32,760.00
Sub- Total for A.1. 94,120.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
Area = 4.5 sq.m.
H-Frame 1.7 m x 1.2m, set 71.000 13.00 48.64 44,894.72
2 pes H-frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
B.1 Shoring Jack, 3.8 m full extension 110.000 13.00 36.00 51,480.00
Adjustable U-head Jack, 0.6m 142.000 13.00 6.80 12,552.80
Adjustable Base Jack, 0.6m 142.000 13.00 6.80 12,552.80
1-1/2" GI Pipe x 6.0 m 110.000 13.00 20.00 28,600.00
1-1/2" GI Pipe x 3.0 m 29.000 13.00 10.00 3,770.00
1-1/2" GI Pipe x 4.0 m 57.000 13.00 14.00 10,374.00
1-1/2" GI Pipe x 1.0 m 382.000 13.00 4.00 19,864.00
Tie Rod x 0.60m 492.000 13.00 8.00 51,168.00
Round Wing Nut 987.000 13.00 1.20 15,397.20
Sub- Total for B.1. 250,653.52
C.1 Total (A.1 + B.1) . 344,773.52
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1 Phenolic board (.0019 x 1.2 x 2.4) - 5 uses pc 392.00 1,336.00 104,742.40
Good Lumber bd.ft 5334.00 55.00 97,790.00
Consumables (12% of Material Cost) 12,532.68
Sub- Total for F.1. 215,065.08
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 559,838.60
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 50,385.47
I.1 Contractor's Profit (CP) . 8% of G.1 44,787.09
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 78,601.34
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 733,612.50
PROJECT TITLE

: Soil Poisoning
Unit of Measurement : Liter
Output per hour : 5.40

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 Skilled Laborer 4 4.00 550.00 8,800.00
Unskilled Laborer 8 4.00 420.00 13,440.00
Sub- Total for A.1. 22,240.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 1,779.20
Sub- Total for B.1. 1,779.20
C.1 Total (A.1 + B.1) . 24,019.20
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
Soil Poisoning Liters 535.00 275.00 147,125.00
Sub- Total for F.1. 147,125.00
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 171,144.20
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 15,402.98
I.1 Contractor's Profit (CP) . 8% of G.1 13,691.54
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 24,028.65
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 224,267.36
PROJECT TITLE

Item No./ Description : Sewer Line Works


Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 b. Skilled Laborer 4 7.00 550.00 15,400.00
c. Unskilled Laborer 4 7.00 420.00 11,760.00
Sub- Total for A.1. 27,160.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10% of Labor Cost) 2,716.00
Sub- Total for B.1. 2,716.00
C.1 Total (A.1 + B.1) . 29,876.00
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 29,876.00
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
100mm dia PVC pipe pcs 45.00 506.00 22,770.00
50mm dia PVC pipe pcs 20.00 168.00 3,360.00
100mm x 50mm Tee pcs 16.00 140.00 2,240.00
100mm dia wye pcs 20.00 150.00 3,000.00
100mm x 50mm wye pcs 24.00 140.00 3,360.00
F.1
100mm elbow 45 deg pcs 24.00 90.00 2,160.00
100mm elbow 90 deg pcs 8.00 81.00 648.00
100mm dia cleanout pcs 12.00 36.00 432.00
50mm dia p-trap pcs 24.00 98.00 2,352.00
50mm dia tee pcs 12.00 37.00 444.00
50mm dia elbow 90 deg pcs 24.00 26.00 624.00
Consumable (12%) 2,069.50
Sub- Total for F.1. 43,459.50
G.1 Direct Unit Cost (E.1 + F.1) - As Evaluated 73,335.50
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 6,600.20
I.1 Contractor's Profit (CP) . 8% of G.1 5,866.84
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 10,296.30
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 96,098.84
PROJECT TITLE

Item No./ Description : Plumbing Fixtures


Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 b. Skilled Laborer 2 6.00 550.00 6,600.00
c. Unskilled Laborer 4 6.00 420.00 10,080.00
Sub- Total for A.1. 16,680.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 1,334.40
Sub- Total for B.1. 1,334.40
C.1 Total (A.1 + B.1) . 18,014.40
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 18,014.40
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Catch Basin unit 8.00 1,500.00 12,000.00
-
F.1 Water Closet including fittings and accessories (elong set/s 12.00 12,000.00 144,000.00
Kitchen Sink set/s 12.00 3,500.00 42,000.00
Lavatory including fittings and accessories american s set/s 12.00 4,700.00 56,400.00
Faucet pcs. 28.00 240.00 6,720.00
Floor Drains (stainless steel with waterless trap) pcs. 15.00 195.00 2,925.00
Sub- Total for F.1. 264,045.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 282,059.40
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 25,385.35
I.1 Contractor's Profit (CP) . 8% of G.1 22,564.75
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 39,601.14
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 369,610.64
PROJECT TITLE
Item No./ Description : Cold Water Lines
Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 b. Skilled Laborer 4 7.00 550.00 15,400.00
c. Unskilled Laborer 4 7.00 420.00 11,760.00
Sub- Total for A.1. 27,160.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 2,172.80
Sub- Total for B.1. 2,172.80
C.1 Total (A.1 + B.1) . 29,332.80
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 29,332.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
G.I Pipe 12.7mm pcs 35.00 336.00 11,760.00
G.I tee 12.70mm pcs 15.00 12.00 180.00
G.I elbow 12.70mm pcs 36.00 15.00 540.00
F.1
G.I end cap pcs 5.00 7.00 35.00
G.I union patente pcs 0.00 33.00 -
G.I gate valve pcs 1.00 379.00 379.00
Water Meter pcs 1.00 1,200.00 1,200.00
Consumable (12%) 704.70
Sub- Total for F.1. 14,798.70
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 44,131.50
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 3,971.84
I.1 Contractor's Profit (CP) . 8% of G.1 3,530.52
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 6,196.06
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 57,829.92
PROJECT TITLE

Item No./ Description : Ceiling, 4.5 mm, Metal Frame, Fiber Cement Board
Unit of Measurement : sq.m.
Output per hour : 1.49

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 b. Skilled Laborer 4 12.00 550.00 26,400.00
c. Unskilled Laborer 8 12.00 420.00 40,320.00
Sub- Total for A.1. 66,720.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate
B.1 Equipment
Minor Tools (8% of Labor Cost) 5,337.60
Sub- Total for B.1. 5,337.60
C.1 Total (A.1 + B.1) . 72,057.60
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 72,057.60
Name and Specification Unit Quantity Unit Cost
Materials
a. 4.5mm Fiber Cement Board/ 4.5mm Marine Plywo pc. 198.000 450.00 89,100.00
b. Metal Furring pc. 611.000 130.00 79,430.00
c. Carrying Channels pc. 193.000 150.00 28,950.00
F.1
d. Hanger Bars/Rod pc. 540.000 80.00 43,200.00
e. Channel Clip pc. 3240.000 20.00 64,800.00
f. Wall Angle pc. 129.000 100.00 12,900.00
g. Rivets pc. 7560.000 1.50 11,340.00
h. 1" Metal Screw pc. 2160.000 3.00 6,480.00
Sub- Total for F.1. 336,200.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 408,257.60
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 36,743.18
I.1 Contractor's Profit (CP) . 8% of G.1 32,660.61
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 57,319.37
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 534,980.76
PROJECT TITLE

Item No./ Description : Doors and Windows


Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1
Skilled Laborer 3 5.00 550.00 8,250.00
Unskilled Laborer 3 5.00 420.00 6,300.00
Sub- Total for A.1. 14,550.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 1,164.00
Sub- Total for B.1. 1,164.00
C.1 Total (A.1 + B.1) . 15,714.00
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
D1 - Flush Door sq.m 12 2,000.00 24,000.00
D2 - Flush Door sq.m 24 2,000.00 48,000.00
D3 - Flush Door sq.m 12 2,000.00 24,000.00
F.1
D4 - PVC Door sq.m 12 1,800.00 21,600.00
W1 - Sliding Window sq.m 24 2,749.00 65,976.00
W2 - Sliding Window sq.m 12 1,300.00 15,600.00
-
- -
- -
G.1 Sub- Total for F.1. 199,176.00
H.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 214,890.00
I.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 19,340.10
J.1 Contractor's Profit (CP) . 8% of G.1 17,191.20
K.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 30,170.56
Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 281,591.86
PROJECT TITLE

Item No./ Description : Fabricated Metal Roofing Accessory, gauge 24, Gutters
Unit of Measurement : l.m.
Output per hour : 11.80
###

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1
Skilled Laborer 3 2.00 550.00 3,300.00
Unskilled Laborer 3 2.00 420.00 2,520.00
Sub- Total for A.1. 5,820.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 465.60
Sub- Total for B.1. 465.60
C.1 Total (A.1 + B.1) . 6,285.60
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Gutter (0.6 mm) m 85.00 168.00 14,280.00
F.1 12" x 1" Plain GI Strap pc 255.00 40.00 10,200.00
Blind Rivets pc 2720.00 1.50 4,080.00
Ridgeroll pc 85.00 350.00 29,750.00
Consumables (3% of Materials Cost) 1,749.30
Sub- Total for F.1. 60,059.30
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 66,344.90
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 5,971.04
I.1 Contractor's Profit (CP) . 8% of G.1 5,307.59
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 9,314.82
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 86,938.36
PROJECT TITLE

Item No./ Description : Prepainted Metal Sheets, above 0.427 mm, Rib Type, Long Span
Unit of Measurement : sq.m.
Output per hour : 2.08
###

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1
Skilled Laborer 3 5.00 550.00 8,250.00
Unskilled Laborer 6 5.00 420.00 12,600.00
Sub- Total for A.1. 20,850.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 1,668.00
Sub- Total for B.1. 1,668.00
C.1 Total (A.1 + B.1) . 22,518.00
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Prepainted Metal Sheets (Corrugated, Short sq.m. 802.00 370.00 296,740.00
F.1 Span/ Long Span, below 0.427mm thk/ above -
0.427mm thk) -
Tek screw/J-bolt with washers pc 7638.00 4.00 30,552.00
Consumables (3% of Materials Cost) 9,818.76
Sub- Total for F.1. 337,110.76
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 359,628.76
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 32,366.59
I.1 Contractor's Profit (CP) . 8% of G.1 28,770.30
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 50,491.88
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 471,257.53
PROJECT TITLE

Item No./ Description : Unglazed Tiles and Glazed Tiles (0.6mx0.6m)


Unit of Measurement : sq.m
Output per hour : 1.95
###

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1
b. Skilled Laborer 8 18.00 550.00 79,200.00
c. Unskilled Laborer 8 18.00 420.00 60,480.00
Sub- Total for A.1. 139,680.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate
B.1 Equipment
Minor Tools (8% of Labor Cost) 11,174.40
Sub- Total for B.1. 11,174.40
C.1 Total (A.1 + B.1) . 150,854.40
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 150,854.40
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. Unglazed Tiles/ Granite Tiles/ Synthetic sq.m. 777.00 350.00 271,950.00
F.1 Granite -
b. Cement bags 143.00 254.00 36,322.00
c. Sand cu.m. 12.00 1,008.50 12,102.00
d. Tile Grout bags 93.00 116.00 10,788.00
Sub- Total for F.1. 331,162.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 482,016.40
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 43,381.48
I.1 Contractor's Profit (CP) . 8% of G.1 38,561.31
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 67,675.10
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 631,634.29
PROJECT TITLE

: Cement Plaster Finish


Unit of Measurement : sq.m
Output per hour : 7.13
###

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1
Skilled Laborer 5 16.00 550.00 44,000.00
Unskilled Laborer 10 16.00 420.00 67,200.00
Sub- Total for A.1. 111,200.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1
Bagger Mixer 1 5 1,376.00 6,880.00
Minor Tools (8% of Labor Cost) 8,896.00
Sub- Total for B.1. 15,776.00
C.1 Total (A.1 + B.1) . 126,976.00
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
F.1
Cement bag 437.00 254.00 110,998.00
Sand cu.m. 37.00 1,008.50 37,314.50
Sub- Total for F.1. 148,312.50
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 275,288.50
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 24,775.97
I.1 Contractor's Profit (CP) . 8% of G.1 22,023.08
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 38,650.51
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 360,738.05
PROJECT TITLE

Item No./ Description : Painting Works, Masonry/Concrete


Unit of Measurement : sq.m
Output per hour : 2.10
###

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1
Skilled Laborer 12 14.00 550.00 92,400.00
Unskilled Laborer 6 14.00 420.00 35,280.00
Sub- Total for A.1. 127,680.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 10,214.40
Sub- Total for B.1. 10,214.40
C.1 Total (A.1 + B.1) . 137,894.40
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
Concrete Neutralizer gal 46.00 112.00 5,152.00
F.1 Concrete Sealer/Primer gal 92.00 190.00 17,480.00
Patching Compound gal 114.00 60.00 6,840.00
Semi Gloss Latex (two coat only) gal 183.00 595.00 108,885.00
Consumables (12% of Materials Cost) 6,917.85
Sub- Total for F.1. 145,274.85
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 283,169.25
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 25,485.23
I.1 Contractor's Profit (CP) . 8% of G.1 22,653.54
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 39,756.96
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 371,064.99

PROJECT TITLE

Item No./ Description : CHB Non Load Bearing (including Reinforcing Steel), 100 mm
Unit of Measurement : sq.m
Output per hour : 3.83
###

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1
Skilled Laborer 4 9.00 550.00 19,800.00
Unskilled Laborer 6 9.00 420.00 22,680.00
Sub- Total for A.1. 42,480.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 3,398.40
Sub- Total for B.1. 3,398.40
C.1 Total (A.1 + B.1) . 45,878.40
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
100 mm thk. CHB (Ordinary) pc 7166.00 20.00 143,320.00
F.1 Cement bag 293.00 254.00 74,422.00
Sand cu.m 23.00 1,008.50 23,195.50
Reinforcing Steel kg 1786.00 41.00 73,226.00
#16 Tie Wire kg 28.00 87.00 2,436.00
Sub- Total for F.1. 316,599.50
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 362,477.90
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 32,623.01
I.1 Contractor's Profit (CP) . 8% of G.1 28,998.23
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 50,891.90
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 474,991.04
PROJECT TITLE

Item No./ Description : CHB Non Load Bearing (including Reinforcing Steel), 150 mm
Unit of Measurement : sq.m
Output per hour : 3.18
###

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1
b. Skilled Laborer 6 12.00 550.00 39,600.00
c. Unskilled Laborer 9 12.00 420.00 45,360.00
Sub- Total for A.1. 84,960.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 6,796.80
Sub- Total for B.1. 6,796.80
C.1 Total (A.1 + B.1) . 91,756.80
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 91,756.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
a. 150 mm thk. CHB (Ordinary) pc 10932.00 22.00 240,504.00
F.1 b. Cement bag 1262.00 254.00 320,548.00
c. Sand cu.m 34.00 1,008.50 34,289.00
d. Reinforcing Steel kg 2725.00 41.00 111,725.00
e. #16 Tie Wire kg 43.00 87.00 3,741.00
Sub- Total for F.1. 710,807.00
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 802,563.80
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 72,230.74
I.1 Contractor's Profit (CP) . 8% of G.1 64,205.10
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 112,679.96
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 1,051,679.60

PROJECT TITLE

Item No./ Description : Structural Steel, Trusses


Unit of Measurement : kg
Output per hour : 85.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
Skilled Laborer 2 13.00 550.00 14,300.00
Unskilled Laborer 5 13.00 420.00 27,300.00
A.1
Sub- Total for A.1. 41,600.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
Welding Machine 1 13.00 2,968.00 38,584.00
Cutting Outfit 1 13.00 363.60 4,726.80
Bar Cutter 1 13.00 1,500.00 19,500.00
Minor Tools (8% of Labor Cost) 3,328.00
Sub- Total for B.1. 66,138.80
B.1
Total (A.1 + B.1) . 107,738.80
Output per hour .
Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
C.1
D.1 Materials
E.1 Structural Steel Framing including kg 8561.00 50.00 428,050.00
cross bracing,truss,purlins) -
Acetylene kg 95.00 60.00 5,700.00
Oxygen kg 189.00 30.00 5,670.00
F.1
Welding Rod kg 172.00 110.00 18,920.00
Consumables (3% of Materials Cost) 13,750.20
Sub- Total for F.1. 472,090.20
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 579,829.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 52,184.61
I.1 Contractor's Profit (CP) . 8% of G.1 46,386.32
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 81,407.99
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 759,807.92
PROJECT TITLE

Item No./ Description : Railings


Unit of Measurement : Lump Sum
Output per hour : 1.00 ###

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1
Skilled Laborer 4 4.00 550.00 8,800.00
Unskilled Laborer 4 4.00 420.00 6,720.00
Sub- Total for A.1. 15,520.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
Equipment
B.1 Welding machine 1 4.00 371.00 1,484.00
Cutting outfit 1 4.00 45.45 181.80
Minor Tools (8% of Labor Cost) 1,241.60
Sub- Total for B.1. 2,907.40
C.1 Total (A.1 + B.1) . 18,427.40
D.1 Output per hour .
E.1 Direct Unit Cost (C.1 / D.1) .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
6mm Polycarbonate Roofing Sheet pc 6.00 1,500.00 9,000.00
F.1 1 1/2" Dia. Stainless Steel Tube, 1.5mm pc 25.00 1,195.88 29,897.00
1" Dia. Stainless Steel Tube, 1.5mm pc 50.00 941.96 47,098.00
Prefab Stainless Steel Grab 38mm x 800mm pc 12.00 1,000.00 12,000.00
Welding Rod kg 25.00 110.00 2,750.00
Consumables (12% of Material Cost) 12,089.40
Sub- Total for F.1. 112,834.40
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 131,261.80
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 11,813.56
I.1 Contractor's Profit (CP) . 8% of G.1 10,500.94
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 18,429.16
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 172,005.46
PROJECT TITLE

Item No./ Description : Conduits, Boxes and Fittings (Conduit Works/Conduit Rough-in)
Unit of Measurement : Lump Sum
Output per hour : 1.00 ###

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 Registered Electrical Engineer 0 7.00 1,200.00 -
Registered Master Electrician / NCII Electrician 3 7.00 550.00 11,550.00
Unskilled Laborer 4 7.00 420.00 11,760.00
Sub- Total for A.1. 23,310.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 1,864.80
Sub- Total for B.1. 1,864.80
C.1 Total (A.1 + B.1) . 25,174.80
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 25,174.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
16 mmΦ uPVC Pipe m 185.00 30.67 5,673.33
15 mmΦ uPVC Pipe m 0.00 25.00 -
F.1 Utility box, 2" X 4" PVC pcs 154.00 38.00 5,852.00
Octagonal Junction Box, 4" X 4" with cover uPVC sets 110.00 32.00 3,520.00
G.I. Wire gauge 16 kgs 3.00 87.00 261.00
Ground rod 20mmØ x 3000mmL CopperClad sets 0.00 780.00 -
Consumables (3% of material cost) 459.19
Sub- Total for F.1. 15,765.52
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 40,940.32
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 3,684.63
I.1 Contractor's Profit (CP) . 8% of G.1 3,275.23
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 5,748.02
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 53,648.20
PROJECT TITLE
###
Item No./ Description Wires and Wiring Devices
Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation No. of Person/s No. of day/s Daily Rate Amount (PhP)


Labor
A.1 Registered Electrical Engineer 0 7.00 1,200.00 -
Registered Master Electrician / NCII Electrician 3 7.00 550.00 11,550.00
Unskilled Laborer 4 7.00 420.00 11,760.00
Sub- Total for A.1. 23,310.00
Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (8% of Labor Cost) 1,864.80
Sub- Total for B.1. 1,864.80
C.1 Total (A.1 + B.1) . 25,174.80
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 25,174.80
Name and Specification Unit Quantity Unit Cost Amount (PhP)
Materials
2.0sq. mm. THHN m 370.00 26.00 9,620.00
3.5sq. mm. THHN m 370.00 28.00 10,360.00
5.5sq. mm.
Duplex THHN Universal Type with
Receptacle, m 0.00 28.00 -
Grounding Slot, 16A, 240V pc 72.00 130.00 9,360.00
ACU Outlet pc 0.00 240.00 -
F.1
One Gang Switch pc 30.00 240.00 7,200.00
Two Gang Switch pc 56.00 240.00 13,440.00
Three Gang Switch pc 0.00 240.00 -
KWHR Meter set 12.00 2,200.00 26,400.00
Tape, bolt & nut, mica tube, terminal lugs
lot 0.00 2,500.00 -
JB Cover clamps, screw and achors
Consumables (3% of material cost) 2,291.40
Sub- Total for F.1. 78,671.40
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 103,846.20
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 9,346.16
I.1 Contractor's Profit (CP) . 8% of G.1 8,307.70
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 14,580.01
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 136,080.06
###
PROJECT TITLE ###

Item No./ Description : Panelboard with Main & Branch Breakers ###
Unit of Measurement : Lump Sum
Output per hour : 1.00

Designation
No. of Person/s No. of day/s Daily Rate Amount (PhP)
Labor
A.1 Registered Electrical Engineer 0 7.00 1,200.00 -
Registered Master Electrician / NCII Electrician 3 7.00 550.00 11,550.00
Unskilled Laborer 6 7.00 420.00 17,640.00
Sub- Total for A.1. 29,190.00
Name and Capacity No. of Unit/s
No. of day/s Daily Rate Amount (PhP)
B.1 Equipment
Minor Tools (10 % of Labor Cost) 2,335.20
Sub- Total for B.1. 2,335.20
C.1 Total (A.1 + B.1) . 31,525.20
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 31,525.20
Name and Specification Unit
Quantity Unit Cost Amount (PhP)
Materials
DP Main: 100AT/125AF, 2P, Bolt-on type, NEMA 1, set 12.00 7,410.00 88,920.00
Branches: 40AT, 2P, BOLT-ON TYPE ls 48.00 1,500.00 72,000.00
F.1 -
-
-
-
Consumables (3% of material cost) 4,827.60
Sub- Total for F.1. 165,747.60
G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 197,272.80
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 17,754.55
I.1 Contractor's Profit (CP) . 8% of G.1 15,781.82
J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 27,697.10
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 258,506.28
###
PROJECT TITLE ###

Item No./ Description Lighting Fixtures and Lamps ###


Unit of Measurement : Lump Sum
Output per hour : 1.00
:

Designation No. of Person/s


No. of day/s Daily Rate Amount (PhP)
Labor
A.1 Registered Electrical Engineer 0 7.00 1,200.00 -
Registered Master Electrician / NCII Electrician 3 7.00 550.00 11,550.00
Unskilled Laborer 3 7.00 420.00 8,820.00
Sub- Total for A.1. 20,370.00

Name and Capacity No. of Unit/s No. of day/s Daily Rate Amount (PhP)

B.1 Equipment
Minor Tools (8% of Labor Cost) 1,629.60
Sub- Total for B.1. 1,629.60
C.1 Total (A.1 + B.1) . 21,999.60
D.1 Output per hour . 1.00
E.1 Direct Unit Cost (C.1 / D.1) . 21,999.60

Name and Specification Unit Quantity Unit Cost Amount (PhP)

Materials
Led Fluorescent Tube 18W pc 0 700.00 -
2-40W Flourescent Lamp pc 60 280.00 16,800.00
F.1 40W Compact Flourescent Lamp pc 0 149.00
25W PinLight pc 48 65.00 3,120.00
Consumables (3% of material cost) 597.60

Sub- Total for F.1. 20,517.60


G.1 Direct Unit Cost (E.1+ F.1) - As Evaluated 42,517.20
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 9% of G.1 3,826.55

I.1 Contractor's Profit (CP) . 8% of G.1 3,401.38


J.1 Value Added Tax (VAT). 12% of (G.1 + H.1 + I.1) 5,969.41
K.1 Total Unit Cost . (G.1 + H.1 + I.1 + J.1) 55,714.54
DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Mobilization, Demobilization and Demolition


ITEM NO. 1 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)

Sub-total P -
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 4.00 1 550.00 2,200.00
Unskilled Labor 4.00 2 420.00 3,360.00
Sub-total P 5,560.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Cargo Truck 2 1 5,000.00 5,000.00
Miscellaneous Handtools 5,000.00
Sub-total P 10,000.00
D. ESTIMATED DIRECT COST (TOTAL) P 15,560.00

E. MARK-UPS P -
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 0% of EDC -
2. Contractor's Profit, 0% of EDC -

F. VAT, 12% of (EDC + Mark-ups) P 1,867.20

G.TOTAL COST OF WORK ITEM P 17,427.20

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Site Clearing and Grabbing


ITEM NO. 2 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)

Sub-total P -
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 2.00 2 550.00 2,200.00
Unskilled Labor 2.00 2 420.00 1,680.00
Sub-total P 3,880.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Backhoe 1.00 1 12,000.00 12,000.00
Dump Truck 1.00 1 5,000.00 5,000.00
Miscellaneous Handtools 5,000.00
Sub-total P 22,000.00
D. ESTIMATED DIRECT COST (TOTAL) P 25,880.00

E. MARK-UPS P -
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 0% of EDC -
2. Contractor's Profit, 0% of EDC -

F. VAT, 12% of (EDC + Mark-ups) P 3,105.60

G.TOTAL COST OF WORK ITEM P 28,985.60

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Structure Excavation


ITEM NO. 3 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)

Sub-total P -
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 2.00 2 550.00 2,200.00
Unskilled Labor 2.00 2 420.00 1,680.00
Sub-total P 3,880.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Mini Backhoe 2.00 1 10,000.00 20,000.00
Dump Truck 2.00 1 5,000.00 10,000.00
Minor Tools (8% of Labor Cost) 310.40
Sub-total P 30,310.40
D. ESTIMATED DIRECT COST (TOTAL) P 34,190.40

E. MARK-UPS P 5,812.37
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 3,077.14
2. Contractor's Profit, 8% of EDC 2,735.23

F. VAT, 12% of (EDC + Mark-ups) P 4,800.33

G.TOTAL COST OF WORK ITEM P 44,803.10

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Embankment, From roadway/structure excavation


ITEM NO. 4 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)

Sub-total P -
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 3.00 2 550.00 3,300.00
Unskilled Labor 4.00 2 420.00 3,360.00
Sub-total P 6,660.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Plate Compactor (5 hp) 3.00 1 984.00 2,952.00
Mini Backhoe 4.00 1 10,000.00 40,000.00
Minor Tools (8% of Labor Cost) 532.80
Sub-total P 43,484.80
D. ESTIMATED DIRECT COST (TOTAL) P 50,144.80

E. MARK-UPS P 8,524.62
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 4,513.03
2. Contractor's Profit, 8% of EDC 4,011.58

F. VAT, 12% of (EDC + Mark-ups) P 7,040.33

G.TOTAL COST OF WORK ITEM P 65,709.75

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Gravel fill


ITEM NO. 5 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Gravel Bedding (G1) cu.m. 34.72 917.50 31,858.81
(w/ 12% Shrinkage Factor) 1,592.94
Sub-total P 33,451.75
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 6.00 2 550.00 6,600.00
Unskilled Labor 6.00 4 420.00 10,080.00
Sub-total P 16,680.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Plate Compactor (5 hp) 6.00 1 984.00 5,904.00
Minor Tools (8% of Labor Cost) 1,334.40
Sub-total P 7,238.40
D. ESTIMATED DIRECT COST (TOTAL) P 57,370.15

E. MARK-UPS P 9,752.93
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 5,163.31
2. Contractor's Profit, 8% of EDC 4,589.61

F. VAT, 12% of (EDC + Mark-ups) P 8,054.77

G.TOTAL COST OF WORK ITEM P 75,177.85

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Structural Concrete, Class A


ITEM NO. 6 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Gravel cu.m. 287 1,120.00 321,440.00
Sand cu.m. 144 850.00 122,400.00
Cement bags 2604 254.00 661,416.00
Sub-total P 1,105,256.00
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 27.00 5 550.00 74,250.00
Unskilled Laborer 27.00 20 420.00 226,800.00
Sub-total P 301,050.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Bagger Mixer 26.00 1 1,376.00 35,776.00
Minor Tools (12% of Labor Cost) 15,052.50
Sub-total P 50,828.50
D. ESTIMATED DIRECT COST (TOTAL) P 1,457,134.50

E. MARK-UPS P 247,712.87
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 131,142.11
2. Contractor's Profit, 8% of EDC 116,570.76

F. VAT, 12% of (EDC + Mark-ups) P 204,581.68

G.TOTAL COST OF WORK ITEM P 1,909,429.05

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Reinforcing Steel (Deformed)


ITEM NO. 7 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Deformed Reinforcing Steel kg 32,978.00 41.00 1,352,098.00
#16 Galvanized iron wire kg 495.00 87.00 43,065.00
Consumables (12% of Material Cost) 69,758.15
Sub-total P 1,464,921.15
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 20.00 5 550.00 55,000.00
Unskilled Laborer 20.00 8 420.00 168,000.00
Sub-total P 223,000.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Bar Cutter 20.00 1 1,758.00 58,600.00
Bar Bender 20.00 1 2,812.00 93,733.33
Minor Tools (8% of Labor Cost) 17,840.00
Sub-total P 170,173.33
D. ESTIMATED DIRECT COST (TOTAL) P 1,858,094.48

E. MARK-UPS P 315,876.06
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 167,228.50
2. Contractor's Profit, 8% of EDC 148,647.56

F. VAT, 12% of (EDC + Mark-ups) P 260,876.47

G.TOTAL COST OF WORK ITEM P 2,434,847.01

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Formworks and Falseworks


ITEM NO. 8 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Phenolic board (.0019 x 1.2 x 2.4) - 5 uses pc 392.00 1,336.00 104,742.40
Good Lumber bd.ft 5,334.00 55.00 97,790.00
Consumables (12% of Material Cost) 12,532.68
Sub-total P 215,065.08
DAYS NUMBER RATE/DAY
B. LABOR :
Installation
Skilled Laborer 13.00 4 550.00 28,600.00
Unskilled Laborer 13.00 6 420.00 32,760.00
Stripping
Unskilled Laborer 13.00 6 420.00 32,760.00
Sub-total P 94,120.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Area = 4.5 sq.m.
H-Frame 1.7 m x 1.2m, set 13.00 71 48.64 44,894.72
2 pes H-frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
Shoring Jack, 3.8 m full extension 13.00 110 36.00 51,480.00
Adjustable U-head Jack, 0.6m 13.00 142 6.80 12,552.80
Adjustable Base Jack, 0.6m 13.00 142 6.80 12,552.80
1-1/2" GI Pipe x 6.0 m 13.00 110 20.00 28,600.00
1-1/2" GI Pipe x 3.0 m 13.00 29 10.00 3,770.00
1-1/2" GI Pipe x 4.0 m 13.00 57 14.00 10,374.00
1-1/2" GI Pipe x 1.0 m 13.00 382 4.00 19,864.00
Tie Rod x 0.60m 13.00 492 8.00 51,168.00
Round Wing Nut 13.00 987 1.20 15,397.20
Sub-total P 250,653.52
D. ESTIMATED DIRECT COST (TOTAL) P 559,838.60

E. MARK-UPS P 95,172.56
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 50,385.47
2. Contractor's Profit, 8% of EDC 44,787.09

F. VAT, 12% of (EDC + Mark-ups) P 78,601.34

G.TOTAL COST OF WORK ITEM P 733,612.50


H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P
DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Soil Poisoning


ITEM NO. 9 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Soil Poisoning Liters 535.00 275.00 147,125.00
Sub-total P 147,125.00
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 4.00 4 550.00 8,800.00
Unskilled Laborer 4.00 8 420.00 13,440.00
Sub-total P 22,240.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 1,779.20
Sub-total P 1,779.20
D. ESTIMATED DIRECT COST (TOTAL) P 171,144.20

E. MARK-UPS P 29,094.51
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 15,402.98
2. Contractor's Profit, 8% of EDC 13,691.54

F. VAT, 12% of (EDC + Mark-ups) P 24,028.65

G.TOTAL COST OF WORK ITEM P 224,267.36

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Sewer Line Works


ITEM NO. 10 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
100mm dia PVC pipe pcs 45.00 506.00 22,770.00
50mm dia PVC pipe pcs 20.00 168.00 3,360.00
100mm x 50mm Tee pcs 16.00 140.00 2,240.00
100mm dia wye pcs 12.00 150.00 3,000.00
100mm x 50mm wye pcs 12.00 140.00 3,360.00
100mm elbow 45 deg pcs 24.00 90.00 2,160.00
100mm elbow 90 deg pcs 8.00 81.00 648.00
100mm dia cleanout pcs 12.00 36.00 432.00
50mm dia p-trap pcs 24.00 98.00 2,352.00
50mm dia tee pcs 12.00 37.00 444.00
50mm dia elbow 90 deg pcs 24.00 26.00 624.00
Consumable (12%) 2,069.50
Sub-total P 43,459.50
DAYS NUMBER RATE/DAY
B. LABOR :
b. Skilled Laborer 7.00 4 550.00 15,400.00
c. Unskilled Laborer 7.00 4 420.00 11,760.00
Sub-total P 27,160.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (10% of Labor Cost) 2,716.00
Sub-total P 2,716.00
D. ESTIMATED DIRECT COST (TOTAL) P 73,335.50

E. MARK-UPS P 12,467.04
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 6,600.20
2. Contractor's Profit, 8% of EDC 5,866.84

F. VAT, 12% of (EDC + Mark-ups) P 10,296.30

G.TOTAL COST OF WORK ITEM P 96,098.84

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Plumbing Fixtures


ITEM NO. 11 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Catch Basin unit 8.00 1,500.00 12,000.00
Water Closet including fittings and accessories (elonga set/s 12.00 12,000.00###
Lavatory including fittings and accessories american set/s 12.00 4,700.00 56,400.00
std. or equivalent
Kitchen
Sink set/s 12.00 3,500.00 42,000.00
Faucet pcs. 28.00 240.00 6,720.00
Floor Drains (stainless steel with waterless trap) pcs. 15.00 195.00 2,925.00
Sub-total P 264,045.00
DAYS NUMBER RATE/DAY
B. LABOR :
b. Skilled Laborer 6.00 2 550.00 6,600.00
c. Unskilled Laborer 6.00 4 420.00 10,080.00
Sub-total P 16,680.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 1,334.40
Sub-total P 1,334.40
D. ESTIMATED DIRECT COST (TOTAL) P 282,059.40

E. MARK-UPS P 47,950.10
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 25,385.35
2. Contractor's Profit, 8% of EDC 22,564.75

F. VAT, 12% of (EDC + Mark-ups) P 39,601.14

G.TOTAL COST OF WORK ITEM P 369,610.64

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Cold Water Lines


ITEM NO. 12 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
G.I Pipe 12.7mm pcs 35.00 336.00 11,760.00
G.I tee 12.70mm pcs 15.00 12.00 180.00
G.I elbow 12.70mm pcs 36.00 15.00 540.00
G.I end cap pcs 5.00 7.00 35.00
G.I gate valve pcs 1.00 379.00 379.00
Water Meter pcs 1.00 1,200.00 1,200.00
Consumable (12%) 704.70
Sub-total P 14,798.70
DAYS NUMBER RATE/DAY
B. LABOR :
b. Skilled Laborer 7.00 4 550.00 15,400.00
c. Unskilled Laborer 7.00 4 420.00 11,760.00
Sub-total P 27,160.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 2,172.80
Sub-total P 2,172.80
D. ESTIMATED DIRECT COST (TOTAL) P 44,131.50

E. MARK-UPS P 7,502.36
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 3,971.84
2. Contractor's Profit, 8% of EDC 3,530.52

F. VAT, 12% of (EDC + Mark-ups) P 6,196.06

G.TOTAL COST OF WORK ITEM P 57,829.92

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Ceiling, 4.5 mm, Metal Frame, Fiber Cement Board
ITEM NO. 13 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)

a. 4.5mm Fiber Cement Board/ 4.5mm Marine


Plywood/ 6mm Marine Plywood/ 6mm Ordinary
Plywood pc. 198.00 450.00 89,100.00
b. Metal Furring pc. 611.00 130.00 79,430.00
c. Carrying Channels pc. 193.00 150.00 28,950.00
d. Hanger Bars/Rod pc. 540.00 80.00 43,200.00
e. Channel Clip pc. 3,240.00 20.00 64,800.00
f. Wall Angle pc. 129.00 100.00 12,900.00
g. Rivets pc. 7,560.00 1.50 11,340.00
h. 1" Metal Screw pc. 2,160.00 3.00 6,480.00
Sub-total P 336,200.00
DAYS NUMBER RATE/DAY
B. LABOR :
b. Skilled Laborer 12.00 4 550.00 26,400.00
c. Unskilled Laborer 12.00 8 420.00 40,320.00
Sub-total P 66,720.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 5,337.60
Sub-total P 5,337.60
D. ESTIMATED DIRECT COST (TOTAL) P 408,257.60

E. MARK-UPS P 69,403.79
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 36,743.18
2. Contractor's Profit, 8% of EDC 32,660.61

F. VAT, 12% of (EDC + Mark-ups) P 57,319.37

G.TOTAL COST OF WORK ITEM P 534,980.76

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :

Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Doors and Windows


ITEM NO. 14 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
D1 - Flush Door sq.m 12.00 2,000.00 24,000.00
D2 - Flush Door sq.m 24.00 2,000.00 48,000.00
D3 - Flush Door sq.m 12.00 2,000.00 24,000.00
D4 - PVC Door sq.m 12.00 1,800.00 21,600.00
W1 - Sliding Window sq.m 24.00 2,749.00 65,976.00
W2 - Sliding Window sq.m 12.00 1,300.00 15,600.00
0 0 - - -
Sub-total P 199,176.00
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 5.00 3 550.00 8,250.00
Unskilled Laborer 5.00 3 420.00 6,300.00
Sub-total P 14,550.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 1,164.00
Sub-total P 1,164.00
D. ESTIMATED DIRECT COST (TOTAL) P 214,890.00

E. MARK-UPS P 36,531.30
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 19,340.10
2. Contractor's Profit, 8% of EDC 17,191.20

F. VAT, 12% of (EDC + Mark-ups) P 30,170.56

G.TOTAL COST OF WORK ITEM P 281,591.86

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :


Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Fabricated Metal Roofing Accessory, gauge 24, Gutters

ITEM NO. 15 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Gutter (0.6 mm) m 85.00 168.00 14,280.00
12" x 1" Plain GI Strap pc 255.00 40.00 10,200.00
Blind Rivets pc 2,720.00 1.50 4,080.00
Ridgeroll pc 85.00 350.00 29,750.00
Consumables (3% of Materials Cost) 1,749.30
Sub-total P 60,059.30
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 2.00 3 550.00 3,300.00
Unskilled Laborer 2.00 3 420.00 2,520.00
Sub-total P 5,820.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 465.60
Sub-total P 465.60
D. ESTIMATED DIRECT COST (TOTAL) P 66,344.90

E. MARK-UPS P 11,278.63
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 5,971.04
2. Contractor's Profit, 8% of EDC 5,307.59

F. VAT, 12% of (EDC + Mark-ups) P 9,314.82

G.TOTAL COST OF WORK ITEM P 86,938.36

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :


Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Prepainted Metal Sheets, above 0.427 mm, Rib Type, Long Span

ITEM NO. 16 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Prepainted Metal Sheets (Corrugated, Short sq.m. 802.00 370.00 296,740.00
Span/ Long Span, below 0.427mm thk/ above
0.427mm thk)
Tek screw/J-bolt with washers pc 7,638.00 4.00 30,552.00
Consumables (3% of Materials Cost) 9,818.76
Sub-total P 337,110.76
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 5.00 3 550.00 8,250.00
Unskilled Laborer 5.00 6 420.00 12,600.00
Sub-total P 20,850.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 1,668.00
Sub-total P 1,668.00
D. ESTIMATED DIRECT COST (TOTAL) P 359,628.76

E. MARK-UPS P 61,136.89
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 32,366.59
2. Contractor's Profit, 8% of EDC 28,770.30

F. VAT, 12% of (EDC + Mark-ups) P 50,491.88

G.TOTAL COST OF WORK ITEM P 471,257.53

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :


Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Unglazed Tiles and Glazed Tiles (0.6mx0.6m)

ITEM NO. 17 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
a. Unglazed Tiles/ Granite Tiles/ Synthetic sq.m. 777.00 350.00 271,950.00
Granite
b. Cement bags 143.00 254.00 36,322.00
c. Sand cu.m. 12.00 1,008.50 12,102.00
d. Tile Grout bags 93.00 116.00 10,788.00
Sub-total P 331,162.00
DAYS NUMBER RATE/DAY
B. LABOR :
b. Skilled Laborer 18.00 8 550.00 79,200.00
c. Unskilled Laborer 18.00 8 420.00 60,480.00
Sub-total P 139,680.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 11,174.40
Sub-total P 11,174.40
D. ESTIMATED DIRECT COST (TOTAL) P 482,016.40

E. MARK-UPS P 81,942.79
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 43,381.48
2. Contractor's Profit, 8% of EDC 38,561.31

F. VAT, 12% of (EDC + Mark-ups) P 67,675.10

G.TOTAL COST OF WORK ITEM P 631,634.29

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :
NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :
Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Cement Plaster Finish

ITEM NO. 18 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Cement bag 437.00 254.00 110,998.00
Sand cu.m. 37.00 1,008.50 37,314.50
Sub-total P 148,312.50
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 16.00 5 550.00 44,000.00
Unskilled Laborer 16.00 10 420.00 67,200.00
Sub-total P 111,200.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Bagger Mixer 5 1 1,376.00 6,880.00
Minor Tools (8% of Labor Cost) 8,896.00
Sub-total P 15,776.00
D. ESTIMATED DIRECT COST (TOTAL) P 275,288.50

E. MARK-UPS P 46,799.05
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 24,775.97
2. Contractor's Profit, 8% of EDC 22,023.08

F. VAT, 12% of (EDC + Mark-ups) P 38,650.51

G.TOTAL COST OF WORK ITEM P 360,738.05

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :


Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Painting Works, Masonry/Concrete

ITEM NO. 19 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Concrete Neutralizer gal 46.00 112.00 5,152.00
Concrete Sealer/Primer gal 92.00 190.00 17,480.00
Patching Compound gal 114.00 60.00 6,840.00
Semi Gloss Latex (two coat only) gal 183.00 595.00 108,885.00
Consumables (12% of Materials Cost) 6,917.85
Sub-total P 145,274.85
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 14.00 12 550.00 92,400.00
Unskilled Laborer 14.00 6 420.00 35,280.00
Sub-total P 127,680.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 10,214.40
Sub-total P 10,214.40
D. ESTIMATED DIRECT COST (TOTAL) P 283,169.25

E. MARK-UPS P 48,138.77
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 25,485.23
2. Contractor's Profit, 8% of EDC 22,653.54

F. VAT, 12% of (EDC + Mark-ups) P 39,756.96

G.TOTAL COST OF WORK ITEM P 371,064.99

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :


Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : CHB Non Load Bearing (including Reinforcing Steel), 100 mm

ITEM NO. 20 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
100 mm thk. CHB (Ordinary) pc 7,166.00 20.00 143,320.00
Cement bag 293.00 254.00 74,422.00
Sand cu.m 23.00 1,008.50 23,195.50
Reinforcing Steel kg 1,786.00 41.00 73,226.00
#16 Tie Wire kg 28.00 87.00 2,436.00
Sub-total P 316,599.50
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 9.00 4 550.00 19,800.00
Unskilled Laborer 9.00 6 420.00 22,680.00
Sub-total P 42,480.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 3,398.40
Sub-total P 3,398.40
D. ESTIMATED DIRECT COST (TOTAL) P 362,477.90

E. MARK-UPS P 61,621.24
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 32,623.01
2. Contractor's Profit, 8% of EDC 28,998.23

F. VAT, 12% of (EDC + Mark-ups) P 50,891.90

G.TOTAL COST OF WORK ITEM P 474,991.04

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :


Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : CHB Non Load Bearing (including Reinforcing Steel), 150 mm

ITEM NO. 21 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
a. 150 mm thk. CHB (Ordinary) pc 10,932.00 22.00 240,504.00
b. Cement bag 1,262.00 254.00 320,548.00
c. Sand cu.m 34.00 1,008.50 34,289.00
d. Reinforcing Steel kg 2,725.00 41.00 111,725.00
e. #16 Tie Wire kg 43.00 87.00 3,741.00
Sub-total P 710,807.00
DAYS NUMBER RATE/DAY
B. LABOR :
b. Skilled Laborer 12.00 6 550.00 39,600.00
c. Unskilled Laborer 12.00 9 420.00 45,360.00
Sub-total P 84,960.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Minor Tools (8% of Labor Cost) 6,796.80
Sub-total P 6,796.80
D. ESTIMATED DIRECT COST (TOTAL) P 802,563.80

E. MARK-UPS P 136,435.85
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 72,230.74
2. Contractor's Profit, 8% of EDC 64,205.10

F. VAT, 12% of (EDC + Mark-ups) P 112,679.96

G.TOTAL COST OF WORK ITEM P 1,051,679.60

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :


Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Structural Steel, Trusses

ITEM NO. 22 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Structural Steel Framing including
kg 8,561.00 50.00 428,050.00
cross bracing,truss,purlins)
Acetylene kg 95.00 60.00 5,700.00
Oxygen kg 189.00 30.00 5,670.00
Welding Rod kg 172.00 110.00 18,920.00
Consumables (3% of Materials Cost) 13,750.20
Sub-total P 472,090.20
DAYS NUMBER RATE/DAY
B. LABOR :
Skilled Laborer 13.00 2 550.00 14,300.00
Unskilled Laborer 13.00 5 420.00 27,300.00
Sub-total P 41,600.00
DAY NUMBER RENTAL RATE/DAY
C. EQUIPMENT :
Welding Machine 13.00 1 2,968.00 38,584.00
Cutting Outfit 13.00 1 363.60 4,726.80
Bar Cutter 13.00 1 1,500.00 19,500.00
Minor Tools (8% of Labor Cost) 3,328.00
Sub-total P 66,138.80
D. ESTIMATED DIRECT COST (TOTAL) P 579,829.00

E. MARK-UPS P 98,570.93
1. Overhead, Contingence, Miscellaneous (OCM) & Expenses, 9% of EDC 52,184.61
2. Contractor's Profit, 8% of EDC 46,386.32

F. VAT, 12% of (EDC + Mark-ups) P 81,407.99

G.TOTAL COST OF WORK ITEM P 759,807.92

H. ITEM UNIT COST (Total Cost of Work Item/Assumed Quantity) P


DETAILED COST ESTIMATES
DERIVATION OF ITEM UNIT COST Date :

NAME OF PROJECT : Proposed Two Storey Dwelling Unit Unit Cost/sq.m. :


Assumed Qty. :
LOCATION : Brgy. Imelada, San Juan, Batangas

BILL NO. : Railings

ITEM NO. 23 :

DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT


A. MATERIAL COST : (VAT not included)
Prefab Stainless Steel Grab 38mm x 800mm pc 12.00 1,000.00 12,000.00
1 1/2" Dia. Stainless Steel Tube, 1.5mm pc 170.00 905.00 29,897.00
1" Dia. Stainless Steel Tube, 1.5mm pc 160.00 1,365.00 47,098.00
6mm Polycarbonate Roofing Sheet pc 6.00 1,500.00 9,000.00
Welding Rod kg 25.00 110.00 2,750.00
Activity Symbol
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
A'
B'
C'
D'
E'
Activity
Mobilization
Site Clearing
Excavation
Embankment From Excavated Material
Soil Poisoning
Gravel Fill
Reinforcing Steel (Fabrication)
Reinforcing Steel (Installation)
Structural Concrete-Foundation Footing & GF slab, beam, column (formworks and concrete pouring)
Reinforcing Steel (Fabrication)
Reinforcing Steel (Installation)
Structural Concrete-2nd Floor slab, beam, colum (formworks and concrete pouring)
Trusses and Purlins Fabrication and Installation with water leak test
Roofing Installation
Concrete Curring
Rebars fabrication and installation, Formworks and Concrete Pouring for Stairs
Laying of CHB and other wall partitions
Electrical wirings (Rough-ins)
Ceiling Finish Installation
Electrical Fixtures, Panel Board and Circuit breakers Installation
Concrete Plastering
Windows Installation
Doors Installation
Cold Water Lines Installation
Sewer Lines installation
Laying of CHB and cover slab for septic tank
Tiles Installation
Building Accessories Installation
Plumbing Fixtures installations
Concrete Painting
Demobilization
Predecessor Duration Start Finish
- 2 3 0 3
A 1 2 3 5
B 1 2 5 7
C 3 3 7 10
C 3 3 7 10
E 6 6 10 16
F 4 4 10 14
G,F 8 7 16 23
H 14 11 23 34
G 4 4 14 18
J, I 8 7 34 41
K 14 11 41 52
L 7 14 52 66
M 6 7 66 73
I 13 14 34 48
L 7 3 52 55
P 19 13 55 68
N 6 6 73 79
R 10 12 79 91
S 6 6 91 97
Q 13 16 68 84
U 5 5 84 89
U 5 5 84 89
H 6 7 23 30
H 6 7 23 30
Y 3 4 30 34
U 19 18 84 102
D' 13 4 102 106
A' 6 6 102 108
U 13 14 84 98
B', C' 1 2 108 110
1 2 3 4

1 2 3 4
30

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
60

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68

53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68
90

69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84

69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84
85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100

85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100
120

101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116

101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116
117 118

117 118
150
Activity Symbol
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
A'
B'
C'
D'
E'
TOTAL
Activity
Mobilization
Site Clearing
Excavation
Embankment From Excavated Material
Soil Poisoning
Gravel Fill
Reinforcing Steel (Fabrication)
Reinforcing Steel (Installation)
Structural Concrete-Foundation Footing & GF slab, beam, column (formworks and concrete pouring)
Reinforcing Steel (Fabrication)
Reinforcing Steel (Installation)
Structural Concrete-2nd Floor slab, beam, colum (formworks and concrete pouring)
Trusses and Purlins Fabrication and Installation with water leak test
Roofing Installation
Concrete Curring
Rebars fabrication and installation, Formworks and Concrete Pouring for Stairs
Laying of CHB and other wall partitions
Electrical wirings (Rough-ins)
Ceiling Finish Installation
Electrical Fixtures, Panel Board and Circuit breakers Installation
Concrete Plastering
Windows Installation
Doors Installation
Cold Water Lines Installation
Sewer Lines installation
Laying of CHB and cover slab for septic tank
Tiles Installation
Building Accessories Installation
Plumbing Fixtures installations
Concrete Painting
Demobilization
TOTAL
Predecessor Duration Start Finish Amount wt. (%) cum. wt. (%)
- 2 3 1 3 ₱11,618.13 0.10% 0.10%
A 1 2 4 5 ₱28,985.60 0.25% 0.35%
B 1 2 6 7 ₱44,803.10 0.38% 0.73%
C 3 3 8 11 ₱65,709.75 0.56% 1.29%
C 3 3 8 11 ₱224,267.36 1.91% 3.19%
E 6 6 12 18 ₱75,177.85 0.64% 3.83%
F 4 4 12 16 ₱486,969.40 4.14% 7.97%
G,F 8 8 19 27 ₱486,969.40 4.14% 12.11%
H 14 12 28 42 ₱881,013.85 7.49% 19.61%
G 4 4 17 21 ₱486,969.40 4.14% 23.75%
J, I 8 8 43 51 ₱486,969.40 4.14% 27.89%
K 14 12 52 66 ₱881,013.85 7.49% 35.38%
L 7 15 67 74 ₱759,807.92 6.46% 41.84%
M 6 7 75 81 ₱558,195.88 4.75% 46.59%
I 13 14 43 56 ₱0.00 0.00% 46.59%
L 7 3 67 74 ₱1,367,983.25 11.63% 58.23%
P 19 13 75 94 ₱1,450,337.11 12.33% 70.56%
N 6 6 82 88 ₱53,648.20 0.46% 71.02%
R 10 13 89 99 ₱534,980.76 4.55% 75.57%
S 6 6 100 106 ₱450,300.88 3.83% 79.40%
Q 13 17 95 108 ₱360,738.05 3.07% 82.46%
U 5 5 109 114 ₱140,795.93 1.20% 83.66%
U 5 5 109 114 ₱140,795.93 1.20% 84.86%
H 6 7 28 34 ₱57,829.92 0.49% 85.35%
H 6 7 28 34 ₱96,098.84 0.82% 86.17%
Y 3 4 35 38 ₱76,333.53 0.65% 86.82%
U 19 20 109 128 ₱631,634.29 5.37% 92.19%
D' 13 7 129 142 ₱172,005.46 1.46% 93.65%
A' 6 6 129 135 ₱369,610.64 3.14% 96.79%
U 13 14 109 122 ₱371,064.99 3.16% 99.95%
B', C' 1 2 136 137 ₱5,809.07 0.05% 100.00%
232 1 142 ₱11,758,437.73 100.00%
2872
SCURVE DATA
ADJUST NIYO MANPOWER (MAGIC METHOD) NO. OF WORKERS

TOTAL WORKERS
30
1 1 1
1 1
1 1
1 1 1
1 1 1
1 1 1 1 1
1 1 1 1

1
1

1 2 2 2 2 2 2 2 2 2 2 2 2 2 2
0.03 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
15 15 15 15 15 15 15 15 15 15 9 9 9 9 9
15 15 0 0 0 0 0 0 0 0 0 0 0 0 0

8 8 8 8 8 8 8 8 8 8 8 16 16 16 16
8 8 0 0 0 0 0 0 0 0 0 0 0 0 0

3 3 3 4 4 4 4 16 16 16 16 31 31 31 31
₱1,546,242.94
₱1,546,242.94

13.15%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1.2

0.8
Axis Title

0.6

0.4

0.2

0
0 5 10 Axis 15
Title 20 25 30
30

1 1 1 1 1 1 1 1
1 1 1 1 1 1
1 1 1

1 1 1 1 1 1
1 1 1 1 1 1
0

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
9 9 18 18 18 18 18 18 18 9 9 9 9 10 10
0 18 0 0 0 0 0 0 0 0 0 0 0 0 0

16 16 16 16 16 10 10 10 10 10 10 10 10 7 7
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

31 31 31 31 31 31 31 31 31 31 31 31 31 31 31
₱1,476,503.19
₱3,022,746.13

25.71%

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0 0
18 13.15%
36 25.71%
54 36.09%
72 68.45%
90 79.12%
108 95.08%
115 100.00%
60

1 1 1 1 1 1

1 1 1 1 1 1 1 1
1 1

1 1 1 1 1 1 1 1 1 1

1
1
1 1 1 1
0

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
10 10 5 5 5 7 7 7 7 7 6 6 8 8 8 8
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

7 10 10 10 10 10 8 8 11 11 11 11 16 16 16 16
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

31 31 31 31 35 35 35 35 35 35 35 35 30 30 30 30
₱1,221,147.61
₱4,243,893.74
36.09%

31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
60

1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1
1 1 1
0

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
12 12 12 12 12 12 12 12 12 24 12 12 12 12 12 12
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 16 16 16 16 32 14 14 14 14 14 14 14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

30 30 30 30 30 30 30 30 30 30 30 28 28 28 28 28
,221,147.61 ₱3,804,706.1
,243,893.74 ₱8,048,599.9
36.09% 68.45%

47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62
90

1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1
0

2 2 2 2 2 2 2 2 2 4 6 8 10 12 14 16
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.14 0.21 0.28 0.35 0.42 0.49 0.56
12 12 12 12 12 12 12 12 12 8 8 8 8 8 8 8
0 0 0 0 0 0 0 0 0 16 16 16 16 16 16 16

14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
0 0 0 0 0 0 0 0 0 28 28 28 28 28 28 28

28 28 28 28 28 28 28 28 28 28 28 28 25 25 25 25
₱3,804,706.19
₱8,048,599.93
68.45%

63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78
1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1

1 1 1 1 1

1 1 1 1 1
2

18 20 22 24 26 28 30 32 34 36 40 44 48 52 55 58
0.63 0.70 0.77 0.84 0.91 0.97 1.04 1.11 1.18 1.25 1.39 1.53 1.67 1.81 1.92 2.02
8 8 8 7 7 7 7 7 7 7 7 7 7 7 7 7
16 16 16 14 14 14 14 14 14 14 28 28 28 28 21 21

14 14 14 12 12 12 12 12 12 12 6 6 6 6 7 7
28 28 28 24 24 24 24 24 24 24 24 24 24 24 21 21

25 25 25 25 25 25 25 25 25 25 24 24 24 24 24 24
₱1,254,158.79
₱9,302,758.72
79.12%

79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94
120

1 1 1
1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1
1
1 1 1 1 1 1 1 1 1
3

61 64 67 67 67 70 73 75 77 79 81 83 85 87 89 91
2.12 2.23 2.33 2.33 2.33 2.44 2.54 2.61 2.68 2.75 2.82 2.89 2.96 3.03 3.10 3.17
7 7 7 4.2 7 6.68 5 5 5 5 5 5 5 5 5 5
21 21 21 0 0 20.04 15 10 10 10 10 10 10 10 10 10

7 7 7 7 7 7 7 9 9 9 9 7 7 7 7 7
21 21 21 0 0 21 21 18 18 18 18 14 14 14 14 14

24 24 24 24 24 24 24 24 24 24 24 24 24 24 30 30
₱1,876,672.13
₱11,179,430.85
95.08%

95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110
1 1 1 1 1 1
1 1 1 1 1

1 1
2

93 95 97 98 99 99 99 99 99 99 99 99 99 99 99
3.24 1.71 3.38 3.41 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
6.68 6.68 6.68 5 5 10 9 9 9 8 8 8 8 8 8
13.36 13.36 13.36 5 5 0 0 0 0 0 0 0 0 0 0

7 7 7 10 11 12 13 14 15 16 17 18 19 20 21
14 14 14 10 11 0 0 0 0 0 0 0 0 0 0

30 30 30 30 26 26 26 26 26 26 26 26 20 20 20
₱579,006.88
₱11,758,437.73
100.00%
150
0

99 99 99 99 99 99 99 99 99 99 99 99 99 99 99 99
3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
9 9 9 18 5 5 5 5 5 5 9 9 9 9 9 9
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

22 23 24 25 26 27 28
0 0 0 0 0 0 0

20 20 20 16 16 16 16 16 16 16 10 10 10 10 10 10
₱0.00
₱11,758,437.73
100.00%
3 ₱11,618.13 ₱0.00
2 ₱28,985.60 ₱0.00
2 ₱44,803.10 ₱0.00
3 ₱65,709.75 ₱0.00
3 ₱224,267.36 ₱0.00
6 ₱75,177.85 ₱0.00
4 ₱486,969.40 ₱0.00
8 ₱121,742.35 ₱365,227.05
12 ₱0.00 ₱881,013.85
4 ₱486,969.40 ₱0.00
8 ₱0.00 ₱0.00
12 ₱0.00 ₱0.00
15 ₱0.00 ₱0.00
7 ₱0.00 ₱0.00
14 ₱0.00 ₱0.00
3 ₱0.00 ₱0.00
13 ₱0.00 ₱0.00
6 ₱0.00 ₱0.00
13 ₱0.00 ₱0.00
6 ₱0.00 ₱0.00
17 ₱0.00 ₱0.00
5 ₱0.00 ₱0.00
5 ₱0.00 ₱0.00
7 ₱0.00 ₱57,829.92
7 ₱0.00 ₱96,098.84
4 ₱0.00 ₱76,333.53
20 ₱0.00 ₱0.00
7 ₱0.00 ₱0.00
6 ₱0.00 ₱0.00
14 ₱0.00 ₱0.00
2 ₱0.00 ₱0.00
₱1,546,242.94 ₱1,476,503.19
0

99 99 99
3.45 3.45 3.45
9 9 8
0 0 0

10 3 3
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱486,969.40 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱734,178.21 ₱146,835.64 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱759,807.92 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱79,742.27 ₱478,453.61 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱1,367,983.25 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱1,450,337.11 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱53,648.20 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱246,914.20 ₱288,066.56 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱450,300.88 ₱0.00
₱0.00 ₱0.00 ₱360,738.05 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱28,159.19 ₱112,636.74 ₱0.00
₱0.00 ₱0.00 ₱28,159.19 ₱112,636.74 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00
₱0.00 ₱0.00 ₱31,581.71 ₱568,470.86 ₱31,581.71
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱172,005.46
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱369,610.64
₱0.00 ₱0.00 ₱26,504.64 ₱344,560.34 ₱0.00
₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱5,809.07
₱1,221,147.61 ₱3,804,706.19 ₱1,254,158.79 ₱1,876,672.13 ₱579,006.88

₱11,758,437.73
180
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
180
240
270
300 330 360
0 390 420 450
480 1 2

###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
3 4 5 6 7
8
Activity Symbol
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
A'
B'
C'
D'
E'
TOTAL
Activity
Mobilization
Site Clearing
Excavation
Embankment From Excavated Material
Soil Poisoning
Gravel Fill
Reinforcing Steel (Fabrication)
Reinforcing Steel (Installation)
Structural Concrete-Foundation Footing & GF slab, beam, column (formworks and concrete pouring)
Reinforcing Steel (Fabrication)
Reinforcing Steel (Installation)
Structural Concrete-2nd Floor slab, beam, colum (formworks and concrete pouring)
Trusses and Purlins Fabrication and Installation with water leak test
Roofing Installation
Concrete Curring
Rebars fabrication and installation, Formworks and Concrete Pouring for Stairs
Laying of CHB and other wall partitions
Electrical wirings (Rough-ins)
Ceiling Finish Installation
Electrical Fixtures, Panel Board and Circuit breakers Installation
Concrete Plastering
Windows Installation
Doors Installation
Cold Water Lines Installation
Sewer Lines installation
Laying of CHB and cover slab for septic tank
Tiles Installation
Building Accessories Installation
Plumbing Fixtures installations
Concrete Painting
Demobilization
TOTAL
Predecessor Duration Start Finish Amount wt. (%) cum. wt. (%)
- 2 3 1 3 ₱11,618.13 0.10% 0.10%
A 1 2 4 5 ₱28,985.60 0.26% 0.36%
B 1 2 6 7 ₱44,803.10 0.40% 0.76%
C 3 4 8 11 ₱65,709.75 0.58% 1.34%
C 3 4 8 11 ₱224,267.36 1.99% 3.33%
E 6 7 12 18 ₱75,177.85 0.67% 3.99%
F 4 5 12 16 ₱486,969.40 4.32% 8.31%
G,F 8 9 19 27 ₱486,969.40 4.32% 12.62%
H 14 15 28 42 ₱881,013.85 7.81% 20.43%
G 4 5 17 21 ₱486,969.40 4.32% 24.75%
J, I 8 9 43 51 ₱486,969.40 4.32% 29.06%
K 14 15 52 66 ₱881,013.85 7.81% 36.87%
L 7 8 67 74 ₱759,807.92 6.73% 43.61%
M 6 7 75 81 ₱558,195.88 4.95% 48.55%
I 13 14 43 56 ₱0.00 0.00% 48.55%
L 7 8 67 74 ₱1,367,983.25 12.12% 60.68%
P 19 20 75 94 ₱999,095.62 8.85% 69.53%
N 6 7 82 88 ₱53,648.20 0.48% 70.01%
R 10 11 89 99 ₱534,980.76 4.74% 74.75%
S 6 7 100 106 ₱450,300.88 3.99% 78.74%
Q 13 14 95 108 ₱360,738.05 3.20% 81.94%
U 5 6 109 114 ₱140,795.93 1.25% 83.18%
U 5 6 109 114 ₱140,795.93 1.25% 84.43%
H 6 7 28 34 ₱57,829.92 0.51% 84.94%
H 6 7 28 34 ₱96,098.84 0.85% 85.80%
Y 3 4 35 38 ₱52,583.98 0.47% 86.26%
U 19 20 109 128 ₱631,634.29 5.60% 91.86%
D' 13 14 129 142 ₱172,005.46 1.52% 93.38%
A' 6 7 129 135 ₱369,610.64 3.28% 96.66%
U 13 14 109 122 ₱371,064.99 3.29% 99.95%
B', C' 1 2 136 137 ₱5,809.07 0.05% 100.00%
232 1 142 ₱11,283,446.69 100.00%
2872
SCURVE DATA
ADJUST NIYO MANPOWER (MAGIC METHOD) NO. OF WORKERS
TOTAL WORKERS
30

1 2 2 2 2 2 2 2 2 2 2 2 2 2 2
0.03 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
15 15 15 15 15 15 15 15 15 15 9 9 9 9 9
15 15 0 0 0 0 0 0 0 0 0 0 0 0 0

8 8 8 8 8 8 8 8 8 8 8 16 16 16 16
8 8 0 0 0 0 0 0 0 0 0 0 0 0 0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
3 3 3 4 4 4 4 16 16 16 25 25 25 25 25

3 3 3 4 4 4 4 16 16 16 25 25 25 25 25

35

30

25
No. of Workers

20

15

10

0
1 4 7 10 13 16 19 22 25 28 31 34
30
0

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
9 9 18 18 18 18 18 18 18 9 9 9 9 10 10 10
0 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 16 16 16 16 10 10 10 10 10 10 10 10 7 7 7
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
25 25 25 25 25 25 25 25 25 31 31 31 31 31 31 31

25 25 25 25 25 25 25 25 25 31 31 31 31 31 31 31

28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76

No. of Days
60
0

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
10 5 5 5 7 7 7 7 7 6 6 8 8 8 8 12
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10 10 10 10 10 8 8 11 11 11 11 16 16 16 16 16
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
31 31 31 31 31 25 25 25 25 25 25 25 25 30 30 30

31 31 31 31 31 25 25 25 25 25 25 25 25 30 30 30

7 70 73 76 79 82 85 88 91 94 97 100 103 106 109


0

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
12 12 12 12 12 12 12 12 24 12 12 12 12 12 12 12
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 16 16 16 32 14 14 14 14 14 14 14 14 14 14 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63
30 30 30 30 30 30 30 30 28 28 28 28 25 25 25 25

30 30 30 30 30 30 30 30 28 28 28 28 25 25 25 25
90
0

2 2 2 2 2 2 2 2 4 6 8 10 12 14 16 18
0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.14 0.21 0.28 0.35 0.42 0.49 0.56 0.63
12 12 12 12 12 12 12 12 8 8 8 8 8 8 8 8
0 0 0 0 0 0 0 0 16 16 16 16 16 16 16 16

14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
0 0 0 0 0 0 0 0 28 28 28 28 28 28 28 28

64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79
25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
2

20 22 24 26 28 30 32 34 36 40 44 48 52 55 58 61
0.70 0.77 0.84 0.91 0.97 1.04 1.11 1.18 1.25 1.39 1.53 1.67 1.81 1.92 2.02 2.12
8 8 7 7 7 7 7 7 7 7 7 7 7 7 7 7
16 16 14 14 14 14 14 14 14 28 28 28 28 21 21 21

14 14 12 12 12 12 12 12 12 6 6 6 6 7 7 7
28 28 24 24 24 24 24 24 24 24 24 24 24 21 21 21

80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95
25 25 25 25 25 25 25 25 25 25 30 30 30 30 30 28

25 25 25 25 25 25 25 25 25 25 30 30 30 30 30 28
120
3

64 67 67 67 70 73 75 77 79 81 83 85 87 89 91 93
2.23 2.33 2.33 2.33 2.44 2.54 2.61 2.68 2.75 2.82 2.89 2.96 3.03 3.10 3.17 3.24
7 7 4.2 7 6.68 5 5 5 5 5 5 5 5 5 5 6.68
21 21 0 0 20.04 15 10 10 10 10 10 10 10 10 10 13.36

7 7 7 7 7 7 9 9 9 9 7 7 7 7 7 7
21 21 0 0 21 21 18 18 18 18 14 14 14 14 14 14

96 97 98 99 100 101 102 103 104 105 106 107 108 109 110
28 28 25 25 25 25 25 25 18 18 18 18 15 3 3 18

28 28 25 25 25 25 25 25 21 21 21 21 21 21 18 18
2

95 97 98 99 99 99 99 99 99 99 99 99 99 99 99
1.71 3.38 3.41 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
6.68 6.68 5 5 10 9 9 9 8 8 8 8 8 8 9
13.36 13.36 5 5 0 0 0 0 0 0 0 0 0 0 0

7 7 10 11 12 13 14 15 16 17 18 19 20 21 22
14 14 10 11 0 0 0 0 0 0 0 0 0 0 0
18 18 18 18 15 3 3

18 18 18 18 15 3 3
150
0

99 99 99 99 99 99 99 99 99 99 99 99 99 99 99 99
3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
9 9 18 5 5 5 5 5 5 9 9 9 9 9 9 9
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

23 24 25 26 27 28
0 0 0 0 0 0
0

99 99 99 99 99 99 99 99 99 99 99 99 99 99 99 99
3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
9 8 8 8 5 5 5 5 5 7 7 7 7 7 4 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
180
0

99 99 99 99 99 99 99 99 99 99 99 99 99 99 99 99
3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0

99 99 99 99 99 99 99 99 99 99 99 99 99 99 99 99
3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
180
0

99 99 99 99 99 99 99 99 99 99 99 99 99 99 99 99
3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0

99 99 99 99 99 99 99 99 99 99 99 99 99 99 99 99
3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
240
0

99 99 99 99 99 99 99 99 99 99 99 99 99 99 99 99
3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
270 300

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0

99 99 99 99 99 99 99 99###
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
4 4 4 4 4 4 4 ###
4###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 0 0 0 0 0 0 ###
0###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
300 330 360 390
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
90 420 450 480
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
1 2 3 4 5 6 7 8
3
2
2
4
4
7
5
9
15
5
9
15
8
7
14
8
20
7
11
7
14
6
6
7
7
4
20
14
7
14
2
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 1 1 1 1 2 2 1 3
A B C
0 0 1 1 0 2 2 0 3
3 1 4
D
3 0 4

3 2 5 4 2 6 6 5 11 8 32
E SS1 F H SS2 I
3 0 5 4 0 6 6 0 11 8 0

SS1
5 3 8
G
5 0 8

11
R

59

11
S

58
40 3 43 43 2 45 45 3 48
SS2
J K M

49 9 52 52 9 54 54 9 57

40
I
40

40 7 47 47 5 52 52 3 55
L P Q

40 0 47 47 0 52 52 0 55

52 5 57
U

60 8 65

3 14
R

48 62 15 3 18
T

4 15 62 47 65
S

47 62
47 8 55
N

57 10 65

48 8 56
O

57 9 65

55 5 60 60 2 62 62 3 65
V W X

55 0 60 60 0 62 62 0 65
65 1 66
Q

65 0 66
Activity Symbol
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Activity
Mobilization
Site Clearing
Excavation
Embankment From Excavated Material
Soil Poisoning
Gravel Fill
Reinforcing Steel (Fabrication)
Reinforcing Steel (Installation)
Structural Concrete-Foundation Footing & slab, beam, column for Ground Floor (formworks and concrete pouring)
Purlins Fabrication and Installation
Roofing Installation
Laying of CHB and other wall partitions
Electrical wirings (Rough-ins)
Ceiling Finish Installation
Electrical Fixtures, Panel Board and Circuit breakers Installation
Concrete Plastering
Doors & Windows Installation
Cold Water Lines Installation
Sewer Lines installation
Laying of CHB and cover slab for septic tank
Tiles Installation
Concrete Painting
Building Accessories Installation
Plumbing Fixtures installations
Demobilization
Predecessor Duration (days) Start Finish 4 8 12
- 1 0 1 1
A 1 1 2 1
B 1 2 3 1
C 1 3 4 1
C 2 3 5 1 1
E(SS)1 2 4 6 1 1
E 3 5 8 1 1 1
F,G(SS)1 5 6 11 1 1 1 1 1
H(SS)2 32 8 40 1 1 1
I 3 40 43
J 2 43 45
I 7 40 47
K 3 45 48
M 8 47 55
M 8 48 56
L 5 47 52
P 3 52 55
H 3 11 14
H 4 11 15
R,S 3 15 18
P 5 52 57
Q 5 55 60
V 2 60 62
W 3 62 65
X 1 65 66
12 16 20 24 28 32

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1
1 1 1 1
1 1 1
36 40 44 48 52 56

1 1 1 1 1 1 1 1
1 1 1
1 1
1 1 1 1 1 1 1
1 1 1
1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1

1
56 60 64 68

1 1
1 1 1

1 1

1 1 1 1
1 1 1 1 1
1 1
1 1 1
1
0 3 3 3 2 5 5 2
A B C
0 0 3 3 3 5 5 0
23 7 30
X
99 76 106

7 3 10 10 6 16 16 7 23 23 11
D F H I
7 0 10 10 0 16 16 0 23 23 0
7
C
7
7 3 10 10 4 14
E G
9 2 12 12 2 16

14 4 18
J
30 16 34

A 3
B 2
C 2
D 3
E 3
F 6
G 4
H 7
I 11
J 4
K 7
L 11
M 14
N 7
O 14
P 3
Q 13
R 6
S 12
T 6
U 16
V 5
W 5
X 7
Y 7
Z 4
A' 18
B' 4
C' 6
D' 14
E' 2
23 7 30 30 4 34
Y Z
99 76 106 106 76 110

34 34 14 48
I O
34 96 62 110

34 7 41 41 11 52 52 3 55 55 13 68
K L P Q
34 0 41 41 0 52 52 0 55 55 0 68

52 14 66 66 7 73
M N
65 13 79 79 13 86
84 5 89
V
105 21 110

84 5 89
W
105 21 110

68 16 84 84 18 102 102 6 108


U A' C'
68 0 84 84 0 102 102 0 108

84 14 98 102 4 106
73 6 79 79 12 91 D' B'
R S 90 6 104 104 -2 108
86 13 92 92 13 104

91 6 97
T
104 13 110
108 2 110
E' END
108 0 110
6 6 6 9 9 10 7 12 29 29 29 29 29 29 29 29 29 29 29 29 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74

3 3 3 4 4 4 4 16 16 16 25 25 25 25 25 25 25 25 25 25 25 25 25 25 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 30 30 30 30 30 30 30 30 30 30 28 28 28 28 25 25 25 25 25 25 25 25 25 25 25 25 25
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94 97 100 103 106 109

No. of Days