Project Notes

North U.T.M North


1. ALL DIMENSIONS ARE IN MM.
2. STORAGE CAPACITY INDICATED ARE OPERATING CAPACITIES.
3. ROAD MARKINGS AND TRAFFIC SIGN BOARDS SHALL BE AS PER SHARJAH TRAFFIC PO
DEPARTMENT REQUIREMENTS.
4. CONTRACTOR SHALL ALLOW FOR 3 NOs. OF 1.0 x 0.5m,10 NOs. OF 0.6x
0.45m AND 10 NOs. OF 0.3 x 0.25m SIZE SIGN BOARDS (ACRYLIC SHEET
WITH LETTER ENGRAVING)

Reference drawings

20704/91001 - OVERALL SITE LAYOUT


20704/81001 (2 SHTS) - OVERALL PIPING PLAN - TANK FARM AREA
20704/81003 - 20704/810
-16
PIPING PLANS

Key to symbols
R O A D R O A D
- NEW FACILITIES
EMERGENCY 2 2 2 EMERGENCY
2 2 ENTRY - BOUNDARY FENCE
10 M. WIDE SLIDING GATE-G1 EXIT EXIT 2
EXIT GATE-G2 S.W - SERVICE WATER
WITH POLE BARRIER
E=348005.382 OILY WATER
E=348220.782
N=2817658.029 GATE-G2 GWM WELL-1 E = 348055.061 10 M. WIDE SLIDING GATE-G1 OIL WATER PIT 25 3M GWM WELL-2 E = 348190.450
F.W - FIRE WATER
CHIMNEY 4m WIDE GATE-G3 N=2818011.180
N = 2817739.002 WITH POLE BARRIER A SEPARATOR N = 2817960.972 U/G - UNDERGROUND
SEPTIC TANK EEW - EMERGENCY EYE WASH/ SHOWER
SOAK PIT 2 2
C
L 4 M. WIDE EMERGENCY ACCESS ROAD 1 C
4 M. WIDE EMERGENCY ACCESS ROAD
L
3 2 2 GWM WELL - GROUND WATER MONITORING WELL
EXPANSION
TANK HOT OIL SUB-STN. WORKSHOP &TK-601 GUARD 1 - FUEL OIL RECOVERY TANK PIT (U/G)
CP TRANSFORMER 5 STORE BUILDING HOUSE-2 BLENDING
UNIT AMENITIES F.W TANK 7
RECTIFIER BLDG. FLAME TRAP7 SKID 2 - FUEL OIL RECOVERY TANK PIT (U/G)

5 M. WIDE ROAD
D
SPA ROAD SIGNS
4 CLEAN WATER
KT-103 TK-104 PIT 25 3M 1 MAXIMUM SPEED LIMIT (15 KM/HOUR)
5 M. WIDE ROAD

U/G TANK
TK-101 TK-102 TK-110 TK-111

CAR PARKING
FUEL OIL 380cst FUEL OIL 380cst 3 (OIL)
2 M 4 2 2 2 NO ENTRY
FUEL OIL 380cst FUEL OIL 380cst 10,000 m3 10,000 m3 FUEL OIL 180cst FUEL OIL 180cst
BAY 1

PI EC
15,000 m3 15,000 m3 15,000 m3 15,000 m3 3 NO RIGHT TURN

G EI
R
TANKER TRUCK

LA VE
LOADING RACK 4 NO WAITING

U R
N
BAY 2

C
5 ONE-WAY TRAFFIC
TANK FARM
H
DRAIN TRENCH DRAIN TRENCH

ER
/
EEW 6 TURN LEFT
6

100000
PIPE RACK PIPE RACK 7 EXIT

P-114B
P-112B
P-112C

P-113B

P-115B
P-115C

P-116B
P-114A
P-113A

P-115A

P-116A
P-112A
P-111B
P-111C
P-111A

P-111D

C
PAINTING ON INTERLOCKING

L
S.W PUMP SIGN BOARD
C
L

EEW
A TERMINAL RULES (BOARD SIZE 1200x1500- PAINTED
TK-602 G.I SHEET WITH PAINTED LETTERS)
TK-105 TK-106 TK-107 TK-108 TK-109 PUMP SHED
TK-113 TK-112 S.W TANK
6 B ASSEMBLY POINT (ACRYLIC SHEET WITH LETTER ENGRAVING)
FUEL OIL 380cst FUEL OIL 380cst FUEL OIL 380cst FUEL OIL 380cst FUEL OIL 380cst FUEL OIL 180cst FUEL OIL 180cst OFFICE BLDG. B
10,000 m3 10,000 m3 10,000 m3 10,000 m3 10,000 m3 TK-114 10,000 m3 10,000 m3 C VENT PIPE (ACRYLIC SHEET WITH LETTER ENGRAVING)

D
GAS OIL SOAK PIT

A
3,000 m3 D CLEAN OILY/ WATER (ACRYLIC SHEET WITH
SEPTIC TANK

O
LETTER ENGRAVING)

R
GUARD
RT-401 RT-402 HOUSE-1
FUEL OIL RECOVERY TANK FUEL OIL RECOVERY TANK

S
PE
2

PI
C
L 4 M. WIDE EMERGENCY ACCESS ROAD
2

G
U/
4m WIDE GATE-G3
GWM WELL-3 E = 348117.358 GWM WELL-4 E = 348170.992 GWM WELL-5 E = 348224.627 GWM WELL-5 E = 348278.261 6m WIDE GATE-G2
E=348306.154 WITH POLE BARRIER
E=348090.755 N = 2817650.054 N = 2817737.988 N = 2817825.922 N = 2817913.856 N=2817959.108

D
OL
N=2817605.957

IF
AN
M

TY
TH

T
JE
ER
B
R
NE
01 13.11.06 Issued for tender
Overall Layout

IN
Drawn Description

abc
Rev Date Ch'k'd App'd

1:750 P.O. Box 11302


Dubai
United Arab Emirates

Tel +971 4 3434218


Fax +971 4 3434281
Web www.mottmac.com

Storage Capacities (Class III Tank Farm) Tanker Truck Loading Rack Client
No. TANK NO. DESCRIPTION CAPACITY-m3 HEIGHT-m
DIAMETER-m No. BAY No. PRODUCT HANDLED Gulf Energy Limited.
1 TK-101 FUEL OIL 15,000 32.6 20 1 BAY 1 180 cst FUEL OIL
P.O.Box 4066
2 TK-102 FUEL OIL 15,000 32.6 20 2 BAY 2 180 cst FUEL OIL/ GAS OIL
Sharjah, U.A.E
3 TK-103 FUEL OIL 10,000 26.7 20
4 TK-104 FUEL OIL 10,000 26.7 20
5 TK-105 FUEL OIL 10,000 26.7 20
Title
Petroleum Products Storage Terminal
6 TK-106 FUEL OIL 10,000 26.7 20
7 TK-107 FUEL OIL 10,000 26.7 20
8 TK-108 FUEL OIL 10,000 26.7 20 at Hamriyah Free Zone
9 TK-109 FUEL OIL 10,000 26.7 20
on Plot No. 3A-01/02/03
15,000
Plot Plan
10 TK-110 FUEL OIL 32.6 20
11 TK-111 FUEL OIL 15,000 32.6 20
12 TK-112 FUEL OIL 10,000 26.7 20
Designed
13 TK-113 FUEL OIL 10,000 26.7 20 SGP Puthuran Eng.Chk. CG Cherian
14 TK-114 GAS OIL 3,000 15.0 20 Drawn
JX Joseph CoordinationUBM Uttam
Dwg.Chk. Approved
SGP Puthuran TBA Lekhsmi
Project
Scale 20704 Status

1:750 CAD file01/20704-91002 CON


20704/91002 01
Drawing No Rev
This document should not be relied on or used in circumstances other than those for which
it was originally prepared and for which Mott MacDonald Ltd
was commissioned. Mott MacDonald Ltd accepts no responsibility for this document to any
other party other than the person by whom it was commissioned.