SCHEDULE OF EQUIPMENT

WATER PUMP
AIR VENT
50mmØ MOTOR RATING
OVER FLOW STANDARD MANHOLE CAPACITY TDH
DESIGNATION QTY. TYPE REMARKS
PIPE L / min. / (gpm) (meters)
RPM KW (hp) VOLTS PHASE HERTZ

END - SUCTION
BRAND NEW AND OF THE APPROVED TYPE, 1 2 12 13
WP 2 302.8(80) 27 3500 2.24(3) 230 SINGLE 60 COMPLETE WITH STANDARD ACCESSORIES,
CENTRIFUGAL
READY FOR SERVICE
STAINLESS STEEL 500
500 5000 5000
BOOSTER PUMP OVERHEAD WATER TANK
CUT IN - CUT CAP.=2,000 GALLONS
CAPACITY TDH OFF MOTOR RATING (7570 LITERS)
GV DESIGNATION QTY TYPE REMARKS
L / min. / (gpm) (meters) PRESSURE
KW (hp)
(Psi) VOLTS PHASE HERTZ
BRAND NEW AND OF THE APPROVED TYPE, 2800 2800

1100
50mmØ G.I. PIPE SCH. 40 RISER
(TO DRAINAGE SYSTEM) BP 1 227(60) 1 SET DUPLEX 38 40 - 60 2.24(3) 230 SINGLE 60 COMPLETE WITH STANDARD ACCESSORIES, DOWN
READY FOR SERVICE A EQUALIZER PIPE
DECK 75 mm Ø G. I. PIPE SCH. 40 BOOSTER PUMP
GV

4250

1900

1900
(3Hp,60 GPM,TDH 38m/
ROOF 125ft)

3150
50mmØ G.I. PIPE SCH. 40 1
AIR VENT

850
LINE OF ROOF
(DISTRIBUTION LINE) 50mmØ EAVES ABOVE 2

OVER FLOW STANDARD

7000
OV STA PIPE MANHOLE DN DN
ER INL
CA HEA ESS
P.= D W ST

9500
2,0 A EE ELECTRODES
(75 00 G TER T L

3850
A WITH HOLDER 50mmØ PIPE-CONNECT DOWN
70
LIT LLON ANK NOTE : TO RISER (DRYPIPE)
FIRE HOSE CABINET (FHC)
ER
S) S IN CASE OF FIRE OPEN
GATE VALVE 1&2 AND
RUN/START BOOSTER
GV B PUMP

2500
50mmØ G.I. PIPE SCH. 40
(TO DRAINAGE SYSTEM) GV
GV1
C

1100
TO 50mmØ G.I. PIPE SCH. 40
TO GV2
MC MC MCB MC MC PUMP "1" (DISTRIBUTION LINE) BP
PUMP "2"
STANDARD MANHOLE STAINLESS STEEL
ALT OVERHEAD WATER TANK
1&2 CAP.= ±2,500 GALLONS) (SHOWING OVERHEAD WATER TANK)
50mmØ PIPE-CONNECT
DOWN TO RISER (DRYPIPE)
FIRE HOSE CABINET (FHC) 2800 5 PARTIAL ROOF DECK PLAN
1 1 AIR VENT SCALE 1: 100 M.

65mmØ G.I. PIPE SCH. 40


WP-1

(DISCHARGE LINE PIPE)


P P
8 6 2 2 6 8 LEGEND :
9 7 7 9
3 GATE VALVE 12 13
300 1000
50mmØ G.I. PIPE SCH. 40 63mmØ G.I. PIPE SCH. 40
S 4 3 S 1000
BH TYPE BW TYPE ( OVER FLOW PIPE ) ( DISCHARGE PIPE )

1900
5 CHECK VALVE
2 RH RELAY RH RELAY 5000

1000
PRESSURE GUAGE 1825 3175 MANHOLE
50mmØ G.I. PIPE SCH. 40 600 x 600mm

1000
CONCRETE
ELECTRODE (DISTRIBUTION LINE) 1575 3425 RISER UP TO
TEE SADDLE OVERHEAD
HOLDER DECK ROOF LINE
WATER TANK

ELBOW C
50mmØ G.I. PIPE SCH. 40
( TO DRAINAGE SYSTEM ) WP2
ELECTRODE FOOT VALVE PWD
300

3150
1000

HOLDER WP1
1600

HANDWASHING
HWL
HE
IWL GROUND LWL LOW WATER LEVEL 3 ELEVATION OF OVERHEAD WATER TANK
2800

LWL
SCALE NTS
WP-1

7000
IWL INTERMEDIATE WATER LEVEL CISTERN
OVERHEAD WATER TANK LANDING
CAP.= ±60,000

CONCRETE PLATFORM
CAP.= 2,000 GALLONS Liters
HWL HIGH WATER LEVEL MANHOLE

8000
(7,570 LITERS)

9500

HANDWASHING
(±15,852 Gallons)

BLACKBOARD BASE
WP2 600 x 600mm

3850
MCB MAIN CIRCUIT BREAKER 0
800 EV
EL
CB CIRCUIT BREAKER WP1 NDL
OU
1900 500 GR STO.
D
MC MAGNETIC HE
OPERATION : FINIS B
CONTACTOR
UP
FOOT

2500
1. WATER LEVEL BELOW LOW WATER LEVEL (LWL) ELECTRODE, PUMPS "1" & "2" START TO OPERATE
UP
3000

UP TO HIGH WATER LEVEL (HWL) ELECTRODES & STOPS. CISTERN VALVE


CAP.= 60,000 Liters 3000
2500

(±15,852 Gallons) A
2. WATER LEVEL BELOW INTERMEDIATE WATER LEVEL (IWL) ELECTRODE EITHER PUMP "1" OR "2"

1600
OPERATES AS INDICATED BY ALTERNATOR & RELAY RH, FURTHER DRAIN OF WATER BELOW RAMP UP
LOW WATER LEVEL (LWL ELECTRODE WILL START PUMP "1" & "2" AS INDICATED BY RELAY 2RH.

3600 1500
3. ALTERNATOR ALTERNATE THE OPERATION OF PUMPS "1" & "2" AT SPECIFIC TIME SCHEDULE OF 300
0
OPERATION. NOTE : VERIFY EXACT LOCATION OF CISTERN /PUMP ROOM SUBJECT TO SITE CONDITION AND LOCAL WATER UTILITY SOURCE

(SHOWING LOCATION OF CISTERN)


1 SCHEMATIC DIAGRAM OF WATER LEVEL CONTROL 2 ISOMETRIC DIAGRAM OF WATER PUMPING SYSTEM 4 PARTIAL GROUND FLOOR PLAN
SCALE 1: 100 M.
WP-1 SCALE NTS WP-1 SCALE NTS WP-1

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED SCHEDULES OF EQUIPMENT CADD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
SIGNED
BUREAU OF DESIGN ISOMETRIC DIAGRAM OF WATER PUMPING
SYSTEM
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
WP- 1
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING MISCELLANEOUS DETAILS CHECKED: SIGNED B 1 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH

You might also like