GENERAL NOTES: 1 2 3 4 5 6 7 8 9 10 11 12 13

1. ALL WORKS SHOULD BE DONE IN ACCORDANCE 55000


WITH THE LATEST EDITION OF THE NATIONAL 5000 9000 9000 9000 9000 9000 5000
FIRE PROTECTION ASSOCIATION (NFPA) CODES
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
NO. 13 & 20, NATIONAL FIRE BUILDING CODE OF
THE PHILIPPINES.

2. ALL WORKS SHALL BE EXECUTED IN-CLOSE


COORDINATION WITH ALL OTHER TRADES. THE
ARCHITECT AND THE ENGINEER SHALL BE
NOTIFIED IMMEDIATELY OF ANY CONFLICT.
C
3. THE CONTRACTOR SHALL SUBMIT CATALOGUE /
BROCHURES SUBJECT FOR FURTHER TECHNICAL STO.
EVALUATION BY THE CONCERNED AUTHORITY HE

3150
(BOD) PRIOR TO PROCUREMENT / INSTALLATION RISER RISER
OF THE EQUIPMENT/UNIT. UP / DOWN SHE UP / DOWN

4. ALL PIPE SIZES ARE IN MILLIMETERS UNLESS


CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM

7000
OTHERWISE NOTED. LANDING LANDING FHC

5. PIPE SLEEVES SHALL BE PROVIDED FOR ALL 1 2 3 4 5


PIPES PASSING THRU SLABS, WALLS & BEAMS. 9500

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL TESTING AND COMMISSIONING FOR ALL
EQUIPMENT INSTALLED.
FE FE FE FE FE
B
UP DN FE FE DN UP
2500

C O R R I D O R C O R R I D O R C O R R I D O R

LEGEND: A
FIRE HOSE
CABINET WITH
RISER
FIRE EXTINGUISHER AND FIRE HOSE CABINET LAYOUT
SIAMESE TWIN /
FIRE DEPARTMENT
CONNECTION
2 TYPICAL SECOND AND THIRD FLOOR PLAN
SCALE 1: 100M.
FP-5
EQUALIZER PIPE

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 3450 1550 1550 600 1000

63mm Ø G.I. SCH.40

PWD PWD
3150

HANDWASHING

HANDWASHING
HE RISER UP
RISER SHE
UP CLASS ROOM CLASS ROOM CLASS ROOM
COMPUTER LABORATORY ROOM
7000

FHC LANDING 1 LANDING FHC


2 3 4
CONCRETE PLATFORM

CONCRETE PLATFORM
9500

HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

STO. STO.
FE FE FE FE FE
B
UP FE FE UP
2500

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
100 X 63 X 63mm
1600

1200

SLOPE 1:12
RAMP UP UP UP RAMP UP SIAMESE TWIN
FIRE DEPT.
CONNECTION
FIRE EXTINGUISHER AND
1500 3900 FIRE HOSE CABINET LAYOUT 3900 1500

1 GROUND FLOOR PLAN(WITH COMPUTER LABORATORY ROOM - OPTION - 3)


SCALE 1: 100M
FP-5

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGEND CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR FE AND FHC LAYOUT
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 5
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) TYPICAL SECOND AND THIRD FLOOR FE AND CHECKED: JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING SIGNED B 8 90
FHC LAYOUT CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER III TECHNICAL SERVICES, DPWH