You are on page 1of 4

Daily Report Departement Of Production Page 1 of 4

TANGGAL : 18 JUNI 2021
 35.000 . LED #1

 30.000

 25.000

 20.000

 15.000

 10.000
25.000 
25.000 

25.000 

25.000 
25.000 

25.000 

25.000 

25.000 

25.000 

25.000 
25.000 
25.000 
25.000 

25.000 

25.000 
25.000 

25.000 

25.000 

25.000 

25.000 

25.000 

25.000 

25.000 
5:00 ‐ 25.000 

 5.000
1:00 ‐ 485 

2:00 ‐ 434 

3:00 ‐ 459 

‐ 670 

6:00 ‐ 295 

7:00 ‐ 277 

8:00 ‐ 293 

9:00 ‐ 422 

10:00 ‐ 409 

11:00 ‐ 275 

12:00 ‐ 270 

13:00 ‐ 279 

14:00 ‐ 430 

15:00 ‐ 447 

16:00 ‐ 295 

17:00 ‐ 303 

18:00 ‐ 316 

19:00 ‐ 319 

20:00 ‐ 363 

21:00 ‐ 402 

22:00 ‐ 413 

23:00 ‐ 424 

0:00 ‐ 334 

 ‐
4:00

DERATING MAIN TRAFO PS GENARATOR

GENERATOR
‐ kWh  Derating Chart 
MAIN TRAFO
ACHIEVEMENT

PLN (Dispatcher)
‐ kWh PLN (Frequensi)
PLN (Dispatcher) :                         ‐ kWh
PLN (Frequensi) :                         ‐ kWh
PS Unit Boiler Unit Boiler :                         ‐ kWh
8.614,00  kWh Unit Turbin Unit Turbin :                         ‐ kWh
Bahan Bakar Bahan Bakar :                         ‐ kWh
DERATING Forced Outage Forced Outage :                600.000 kWh
600.000,00  kWh Lain ‐ lain Lain ‐ lain :                         ‐ kWh
Schedule Outage Schedule Outage :                         ‐ kWh
TOTAL DERATING
5.376.825,00  kWh
LED#2
 35.000
948 

123 
202 

208 

175 

239 

281 
401 
50 

20 

42 

 30.000






 25.000

 20.000
24.052 

25.871 

25.823 

25.653 

25.350 
25.210 

25.193 

25.155 
25.214 

25.086 

25.221 
25.072 

25.102 
24.877 

25.078 
24.950 

24.798 

24.792 

24.980 
24.825 

24.958 
24.761 

24.719 
24.599 

 15.000

 10.000

 5.000
3.577 

4.525 

3.484 

3.506 

3.542 

3.527 

3.570 

3.631 

3.653 

3.599 

3.581 

3.581 

3.621 

3.636 

3.550 

3.541 

3.573 

3.569 

3.598 

3.591 

3.601 

3.547 

3.532 

3.537 
 ‐
10:00

11:00

12:00

13:00

14:00

15:00

16:00

17:00

18:00

19:00

20:00

21:00

22:00

23:00
1:00

2:00

3:00

4:00

5:00

6:00

7:00

8:00

9:00

DERATING MAIN TRAFO PS GENARATOR 0:00

GENERATOR
687.045,00  kWh  Derating Chart 
ACHIEVEMENT

MAIN TRAFO PLN (Dispatcher) :                         ‐ kWh


PLN (Dispatcher)
601.339,00  kWh PLN (Frequensi)
PLN (Frequensi) :                         ‐ kWh
Unit Boiler :                    2.689 kWh
PS Unit Boiler
Unit Turbin :                         ‐ kWh
86.672,00  kWh Unit Turbin Bahan Bakar :                         ‐ kWh
DERATING Bahan Bakar Forced Outage :                         ‐ kWh
2.689,00  kWh Forced Outage Lain ‐ lain :                         ‐ kWh
Lain ‐ lain Schedule Outage :                         ‐ kWh
TOTAL DERATING
kWh Schedule Outage
3.579.102,7
Daily Report Departement Of Production Page 2 of 4

           DAILY COAL CONSUMPTION
COAL CONSUMPTION GRAFIK 18 JUNI 2021

DAILY COAL CONSUMPTION LED #1
 40,000

 35,000

 30,000

 25,000

 20,000

 15,000

 10,000

 5,000
0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000

0,000
 ‐
1:00

2:00

3:00

4:00

5:00

6:00

7:00

8:00

9:00

10:00

11:00

12:00

13:00

14:00

15:00

16:00

17:00

18:00

19:00

20:00

21:00

22:00

23:00

0:00
ACTUAL STANDARD

Coal Composition Chart

PBB
GBE LT1 : PBB : 0 kg
RJB LT2 : GBE : 0 kg
LT3 : RJB : 0 kg
BMKS
LT4 : BMKS : 0 kg
ATQ
LT5 : ATQ : 0 kg
TOTAL COAL CONSUMPTION 0 kg

DAILY COAL CONSUMPTION LED #2
 40,000

 35,000

 30,000

 25,000

 20,000
34,774

34,773

34,771
34,752

34,663
34,565

34,603
34,507
34,444

34,387

34,402

34,443

34,331
34,271

34,280

34,235
34,178

34,174
33,982

34,007
33,944

33,867

33,856

 15,000
22,364

 10,000

 5,000

 ‐
1:00

2:00

3:00

4:00

5:00

6:00

7:00

8:00

9:00

10:00

11:00

12:00

13:00

14:00

15:00

16:00

17:00

18:00

19:00

20:00

21:00

22:00

23:00

0:00

ACTUAL STANDARD

Coal Composition Chart

PBB

GBE LT1 : PBB : 0 kg


LT2 : GBE : 0 kg
RJB
LT3 : RJB : 0 kg
BMKS LT4 : BMKS : 0 kg
LT5 : ATQ : 812.573 kg
ATQ
TOTAL COAL CONSUMPTION 812.573 kg
812.573
Daily Report Departement Of Production Page 3 of 4

                    ACCUMULATION LOAD DIAGRAM PT. LED UNIT 1 DAN 2
SAMPAI DENGAN TANGGAL 18 JUNI 2021

650.000
LED #1

2.864 

3.365 

5.077 
4.584 

3.545 
4.911 
39.658 
47.002 
600.000
550.000

230.696 

235.123 
500.000
450.000
400.000
350.000
602.065 

598.836 

597.574 

598.025 

597.471 
596.326 

600.000 

600.000 

600.000 

600.000 

600.000 

600.000 

600.000 

600.000 
563.858 
553.533 

300.000
250.000

369.304 

365.756 

302.374,89 
200.000
150.000
100.000
50.000


0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVG
MAIN TRAFO DERATING FULL LOAD TARGET LOAD

NETT LOAD CHART DERATING CHART
PLN (Dispatcher) PLN (Dispatcher) :                           ‐ kWh
PLN (Frequensi)
49,70% 50,30% Unit Boiler
PLN (Frequensi) :                           ‐ kWh
Unit Turbin Unit Boiler :                   345.690 kWh
Bahan Bakar Unit Turbin :                       6.135 kWh
FORCED OUTAGE Bahan Bakar :                           ‐ kWh
Lain ‐ lain FORCED OUTAGE :               5.025.000 kWh
SCHEDULE OUTAGE Lain ‐ lain :                           ‐ kWh
MAIN TRAFO 5.442.748  kWh SCHEDULE OUTAGE :                           ‐ kWh
DERATING 5.376.825  kWh

LED #2
650.000
14.152 

2.689 
1.101 
3.885 
12.389 

2.978 

6.858 

600.000
142.666 

550.000
183.690 

187.988 

194.927 

203.286 
209.738 
236.758 

500.000
375.998 

450.000
400.000
350.000
601.724 

601.339 
599.433 
598.736 
600.000 

600.000 

600.000 

593.452 
588.476 
587.630 

300.000
457.334 

401.985,50 
416.310 

250.000
412.012 

405.073 

396.714 
390.262 
363.242 

200.000
224.002 

150.000
100.000
50.000
0


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVG
MAIN TRAFO DERATING FULL LOAD TARGET LOAD

NETT LOAD CHART DERATING CHART
PLN (Dispatcher) :                           ‐ kWh
33% PLN (Dispatcher)
PLN (Frequensi)
PLN (Frequensi) :                           ‐ kWh
67% Unit Boiler Unit Boiler :               1.360.062 kWh
Unit Turbin
Unit Turbin :                    94.041 kWh
Bahan Bakar
FORCED OUTAGE Bahan Bakar :                          ‐ kWh
Lain ‐ lain FORCED OUTAGE :              2.125.000 kWh
SCHEDULE OUTAGE Lain ‐ lain  :                          ‐ kWh
MAIN TRAFO 7.235.739  kWh SCHEDULE OUTAGE :                           ‐ kWh

DERATING 3.579.103  kWh


TARGET AND ACHIEVEMENTS LED #1 & LED #2
TARGET : ACHIEVEMENTS
AFpm :                       84,72222 % AFa :                         35,21802 %
PHm :                                 720 Hour  ∑ Qi :                     12.678.487 kWh
Load Export :                    30.499.999 kWh Ea :                     12.678.487 kWh
Daily Report Departement Of Production Page 4 of 4

          COAL CONSUMPTION ACCUMULATION
SAMPAI DENGAN TANGGAL 18 JUNI 2021
DAILY COAL CONSUMPTION LED #1
900.000
850.000
800.000
750.000
700.000
650.000
600.000
550.000

905.942
903.526
500.000

895.224
891.540
890.705
886.489

853.645
846.654

450.000
400.000

686.026
350.000

538.998

461.042
300.000
250.000
200.000 AVG
150.000
100.000
50.000

0
kg 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVG
ACTUAL STANDARD

DAILY COAL CONSUMPTION LED #2
900.000
850.000
800.000
750.000
700.000
650.000
600.000
550.000
500.000

826.798

812.573
450.000
791.833

785.872
784.444
781.616
775.683

400.000
623.133

350.000

542.830
556.719
554.606
550.557

545.174
537.809
513.932

300.000
250.000
330.194

200.000
150.000
100.000
50.000
0

0
kg 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVG
ACTUAL STANDARD

STOCK AND ACUMULATION OF CONSUMPTION TO DATE 18 JUNI 2021
1. ACCUMULATION OF CONSUMPTION LED#1 :                    8.298.750 kg NOTE : LT = LOKASI TAMBANG
2. ACCUMULATION OF CONSUMPTION LED#2 :                    9.770.943 kg PBB = PT. PLN BATUBARA
GBE = PT. GRAHA BENUA ETAM
TOTAL :                     18.069.693 kg RJB = PT.RAJAWALI JAYA BERSAMA
STOCK :                   9.394.301 kg BMKS = PT.TALENTA BUMI MARABAHAN KALIMANTAN SE
KECUKUPAN :                           12,53 HARI ATQ = PT.ASIATRUST TECHNOVIMA QUALITI
NOTE : EXPORT 25 MW
COAL COMPOSITION OF ACCUMULATION DIAGRAM LED #1 COAL COMPOSITION OF ACCUMULATION DIAGRAM LED #2

PBB
PBB
GBE
GBE
RJB
RJB
BMKS BMKS
ATQ ATQ

LT1 : PBB :                                             ‐ Ton LT1 : PBB :                                    ‐ Ton


LT2 : GBE :                                             ‐ Ton LT2 : GBE :                                    ‐ Ton
LT3 : RJB :                                             ‐ Ton LT3 : RJB :                                    ‐ Ton
LT4 : BMKS :                                  1.559,820 Ton LT4 : BMKS :                         5.074,211 Ton
LT5 : ATQ :                                             ‐ Ton LT5 : ATQ :                         2.260,885 Ton