RECRUITMENT FORM
Dear Madam or Sir,
You have been shortlisted in the recruitment process for the position of Construction Project Manager.
The recruitment process will consist of 3 stages:
1. Construction knowledge form
2. Teleconference call with Edyta Kijewska – Director of Operations at WS East Africa
3. Videoconference call with Edyta Kijewska and Betty Musyoki – Buisness Development Manager
at ArtCaffe – representative of the Client, whose site you will be managing.
The job will require practical level of knowledge regarding management of construction sites. We have
prepared a short form that will allow us to understand the level of your knowledge in the field.
Kindly fill in the form in English by the 31st of July and send it back via email.
HOW TO TEST
NO QUALITY OF DURING INSTALLATION: END RESULTS:
WORKS:
Ex Masonry work Planning and preparation, Wall dimensions vs the plan,
Page 1 of 3
available tools, precision of
workmanship, compliance with levels, straightness, smoothness.
plan
Pipe & Joints Dimensions
Plan the work according to the According to the Plan, Location of
1 Plumbing works Man Power , Check available Pipe lines and category of Pipe
Tools, do as per Plan. Line. (eg. Sewage Line, Water
line)
Plan the work according to the
Electrical Systems and equipments
Man Power , Check available
2 Electrical works in good working order after they
Tools, Safety first, compile with
have install as per plan
plan
Prepare the Surface, Mark center
Plan and Prepare the necessary
3 Tiling works Point, apply adhesive, cut tiles if
tools .Do it with as per plan
needed, set the tiles as per plan
Plan the work , what tools need for Prepare the walls, Plan to sample
4 Painting works the work, do it according as per the shades, paint an Interior or
plan. Exterior As Mentioned on the plan.
Please fill in the example schedule of works (simplified Gantt chart) based on your knowledge. Please
estimate that each process takes 1 week and we have a 10 weeks project plan. Kindly mark critical path in
RED. We have filled the first row for you as an example.
Processes:
Planning / masonry / water / sewage / drainage / electrical / ventilation / air-con / doors / plastering /
painting / skimming / tiling / furnishing / appliances installation / windows /
NO PROCESS W1 W2 W3 W4 W5 W6 W7 W8 W9 W10
1 Planning X
2 Masonry X
3 Rough Plumbing/
Rough
X
Electrical/HVAC/
Doors
4 Plastering X
5 Painting/Skimming X
6 Final Plumbing / Final
X
Electrical
7 Tilling X
8 Furnishing X
9 Appliances Installation X
10 Windows X
This form will also be discussed during the teleconference.
Page 2 of 3
The teleconference will take place on the 1 st or 2nd of August. Kindly mark preferred date and hour slot of
your availability. The teleconference will last between 30 and 45 minutes and will be conducted fully in
English.
Page 3 of 3