You are on page 1of 2

Assignment Solution No.

02 Total Marks: 20
Semester: Spring 2021
CS615 Software Project Management Due Date: 31-May-21
Syed Kosar Hadri
BC170405278

Assignment no. 2 covers Lec#9 to Lec#13.

Objectives of Assignment:

 You will learn the project and its management activities.

Uploading instructions:

 Your assignment must be in .doc or .docx format. (Any other formats like scan images, PDF, Zip, rar,
bmp, etc. will not be accepted).
 No assignment will be accepted through email.

Rules for Marking:

It should be clear that your assignment will not get any credit if:

 The assignment is submitted after due date.


 The submitted assignment does not open or file is corrupted.
 Your assignment is copied from internet, handouts or from any other student
(Strict disciplinary action will be taken in this case).

Assignment 20 Marks

Question No 1: 20 Marks

There are number of activities performed by the project manager during project management. These
activities are divided in different phases. The project management phases are mostly categorized into the
following categories:

 Project initiation
 Project planning, control, and tracking
 Product implementation
 Project closedown
The table given below contains the description. You are required to mention the name of the project phase
category against the description given in the table.

Answer Sheet:

Name Description
Product implementation Software required functionality and performance is tested
in user acceptance test.
Project Initiation Resources required for the project is allocated.
Product implementation The customer needs training for the software product
developed for him/her.
Project planning. Control and There may be changes during software development and
tracking there is a need of mechanism to control those changes.
Product implementation Hardware and software requirements for software project
implementation at customer site is defined.
Project planning, control and Software project plan prepared in detail.
tracking
Project initiation Defining scope of the software project.
Project closedown Software project manager prepares a report for key
learning points.
Project initiation Requirements elicitation.
Project closedown Components of the software that can be reused are
identified.

Note: you are required to watch video lessons and consult handouts to solve this assignment.