Mr. Cruz, the IT Manager, has developed a 10 year IT plan. This plan will be used as a reference in
building the IT department. What type of informaon did Mr
Mr.. Cruz develop?
Strategic
Report showing the completed, on-going and not yet started projects.
Operaonal
Available
Available stocks in every warehouse
Operaonal
Markeng techniques of school branches and providing incenves to the best performing branch.
Taccal
In a cigare
c igaree
e manufacturing, which of the followin
following
g informaon is statutory?
The sales tax collected.
the _____________________________.
Improvementt plan of the company
Improvemen
TRA Global Soware was contracted to develop the procurement process of the XYZ Corporaon. Arlene
is the assigned Systems Analyst of the proposed project. The proposed system will interface at dierent
department of the organizaon
organizaon (Procurement, Accounng, Finance and Administrave)
Administrave) Which of the
following
following is NOT a characteris
characteriscs
cs of a goal of the project that Arlene need to consider?
__________
__________ may include in
increased
creased sales due to impro
improved
ved customer services or to managers
managers having
beer informaon on which to base decisions.
Intangible benets
In the analysis a system of the proposed system, The me spent by XYZ Corporaon oce sta to
perform a task
is an indirect cost
TRUE or FALSE. The “the cost of a hi-end server for applicaon soware” a tangible cost.
TRUE
PRELIM (25/30)
In a cigare
c igaree
e manufacturing, which of the followin
following
g informaon is statutory?
The sales tax collected.
Systems Analyst
Analyst used DFD as a tool in designing a sys
system.
tem. DFD stands for ______.
Data Flow Diagram
Choose the leer that corresponds to the correct answer: Which of the following
following describes DFD?
All of the choices
What is the
Interview themost important
end user and difficult task of a Systems Analyst?
of the system
John is esmang the cost and benet of the proposed procurement system. At what stage of the
soware development cycle is this acvity?
Feasibility Analysis
Middle
Taccal Managers use:
In the feasibility analysis stage of the SDLC, which of the following acvity comes next aer seng the
goals?
This tool uses a simple sck gure. The simple sck gure is used to represent an actor and is given a
name that characterizes the role that the actor
ac tor is playing.
Use Case
False
Refer to the diagram below and idenfy the stages of the soware development life cycle. (NOTE
WALANG DIAGRAM NA BINIGAY!!! GRRRRR)
*Feasibility Analysis, **system implementaon, ***system evaluaon
Programming Codes
George is the Systems Analyst of the TRA Global Soware Corporaon, the company was contracted
contracted to
develop a hotel informaon system. George is assigned to conduct an informao
informaon
n gathering. Which of
the following should George not avoid during the informaon gathering stage?
Discuss the proposed system.
Markeng techniques of school branches and providing incenves to the best performing branch.
Taccal
Develop a long quesonnaire to capture all the issues and concerns on the system.
F