234

You might also like

You are on page 1of 2
otra sfeemn fates OIL INDIA LIMITED wr arr DRILLING DEPARTMENT fT / DULIATAN te Use On Ref. No. DR! -07,003012021 ‘teat 18-02-2021 |From |: | Chief General Manager- Drilling Services and HoD(UC) 1 5 he Z To : | Resident cher ExCatve oy pe WP ors an ~ | In-house Team for Monitoring Certification Process of Third Party jubject . 4 . Inspection of Casing Reference |: | Discussion in presence of CMD & D(O) on 07/01/2021 Sir, The casing forms & major structural component of the wellbore and serves several important functions like preventing the formation wall from caving into the wellbore, isolating the different formations to prevent the Tlow or crossfiow of formation fluid etc. 20 30 It is well known to you that inventory management for casing, which includes procurement also, catered by OIL’s own expertise. However, as per practice, Third Party Inspection (TPI) of ‘Tubulars (especially casing of all Sizes) is nominated by the supplier on whom the order is placed andall cost of TPI is borne by the Supplier. At present OIL is carrying out TPI of casing procured under various tender by below mentioned TPIA which are engaged by the Bidder after getting due approval from Oil India Limited. For Casing the approved agencies are as below, @ Mis. Lloyds, Gi) Mls Bureau Veritas, (ii) Mis, RITES, @®) Ms.LRS., (v) Mls. Tuboscope Veteo and (vi) Mis DNV-GL However, ithas been observed that there are numbers of failure of 514" casing in hermetical testing during the financial year 2018-19 and 2019-20, which not only resulted in huge financial loss but also reduced the company’s performance. In this connection, few wells like MFY, TAR, DIT, HZG, DIK, DIG may be referred which were completed in the recent years where failure occurs during 5% "casing hermetical testing. om RCE'S OFFICE yofie FEB 2021 SILINDIA LTD. OULIRIAN Page 1 of 2 40 5.0 60 70 itr sfemn farres OIL INDIA LIMITED arr fuer DRILLING DEPARTMENT gfQSISE/ DULIAJAN (eet ofig fee SHE Ee /For Internal Use Only) ‘Since the failure of casing occurred even after the TPI carried out by extemal agency engaged by the bidder (approved by OIL} we propose to engage TPI from our end for better monitoring and supervision. This matter was highlighted in the recent meeting held between CMD, D (O) and Drilling department on 07.01.2020. During the discussion it was proposed to appoint the TPI by OIL at its own cost and there by having some control on the TPT inspection of casing, Quote CGM-DS brought out the issue of TPI against casing procurement. During the discussion the possibility of appointing the TPI from OIL’s side is to be explored and if possible to complete the same within 15 days. Unquote In view of above, a team has been constituted with following members and the team will report ty COM-DS ain HuD (/C) 1. Shri Rajib Barua, DGM-D (Planning) Convener 2. Shri Abhijit Gogoi, DyCED(TS) 3. Shri Ankit Parasor, D (Rig Building) 4. Shri Manash Pratim Hazarika, DyCED (Operation) ‘Team has been entrusted the following responsibilities: (® To frame the code of practice for the inspection as guideline as per standards and guidelines. ii) To develop an action plan for developing the core competency on NDT through full time certification in Level 2.& Level 3 and any other training, as deemed fit under Third Party Inspection including “on the job training. Gi) To monitor TPI inspection at factory or at site, as applicable. ‘The above is for your information and we request your kind “In Principle Approval” please. Copy: File Page 2 of 2

You might also like