You are on page 1of 2

SANTOS LAND DEVELOPMENT CORPORATION

Santos Building, Gov. Duterte St., Davao City

UPDATED SCHEDULE OF LAYOUT: ILUMINA PH-2 (JUNE LAYOUT)


As of June 1, 2019 (High Priority)

IN- BLK. # LOT. # LOT AREA Model OWNER Floor Area W/ TYPE Carport DATE STARTED # of day/s to DUE DATE STATUS ESTIMATE
CHARGE (sqm) House w/ Terrace covered (Storey) Orientation Accomplish
# (SQM) area (sqm) (w/revisions)

ERICK Blk.14 Lot 06 262 176 Dahlia S. Arancel 72.47 76.62 1 Right 5/28/2019 3 days 5/30/2019 DONE DONE

BERNIE Blk. 09 Lot 07 262 182 Jennifer Qua 195.21 207.53 1 Left 5/13/2019 15 days 5/28/2019 DONE DONE

KEM Blk. 09 Lot 02 180 191 Hilario (Customized) 73.43 97.30 1 Right 6/05/2019 8 days 6/14/2019 ON GOING (70%)- PULL OUT

DONE FOR LAYOUT FOR CHECKING OF LAYOUT ON GOING LAYOUT DONE FOR ESTIMATE TOTAL # OF LAYOUT TO REACH 22 MH
21 OUT OF 21 0 0 21 OUT OF 21 0

UPDATED SCHEDULE OF LAYOUT -ILUMINA PH-2 (JULY LAYOUT) - 1st Priority

IN- BLK. # LOT. # LOT AREA Model House # OWNER Floor Area w/ W/ covered TYPE (Storey) Carport DATE Actual Date TARGET STATUS TYPE ESTIMATE
CHARGE (sqm) Terrace (SQM) area (sqm) Orientation STARTED Done DATE
JAIZA Blk. 14 Lot 24 180 197 w/o 72.47 76.62 1 Left 05/27 05/30 05/30 DONE Standard DONE

RACHELLE Blk.14 Lot 08 180 198 Expedito Cedullo 73.65 97.30 1 Left 05/30 06/01 REVISION OF STAIRS Standard

LIZETTE Blk. 05 Lot 23 180 199 w/o 73.65 97.30 1 Left 05/28 05/31 05/31 DONE Standard DONE

RACHELLE Blk. 15 Lot 22 419 201 Cecilia Roldan 72.20 76.62 1 Left 05/31 06/22 ON GOING (89%) Customized

LIZETTE Blk. 05 Lot 25 180 203 w/o 72.47 76.62 1 Left 05/31 06/03 REVISION OF STAIRS Standard

BERNIE Blk. 09 Lot 09 204 Robert Cruz 247.67 - 2 Left 06/03 06/19 ON-GOING (60%) Customized

JAIZA Blk. 06 Lot 13 180 205 w/o 162.14 194.95 2 Left 05/30 06/10 06/01 DONE Standard

ALLAN Blk. 06 Lot 17 180 207 w/o 162.14 194.95 2 Left 06/03 06/13 06/15 DONE Standard

KEM Blk 06 Lot 28 180 208 John Balingit 148.15 176.47 2 Left 06/15 06/19 ON-GOING (70%) Standard

ERICK Blk 14, Lot 17 180 209 w/o 73.65 97.30 1 Right 06/04 06/06 06/06 DONE Standard

MAC Blk 06 Lot 39 180 212 w/o 162.14 (HIP) 195.95 2 Left Standard

ONE FOR LAYOUT FOR CHECKING OF LAYOUT ON GOING LAYOUT DONE FOR ESTIMATE TOTAL # OF LAYOUT TO REACH 11 MH
5 OUT OF 11 0 5 2 OUT OF 11 6 MORE TO GO (LAYOUT)
UPDATED SCHEDULE OF LAYOUT -ILUMINA PH-2 (JULY LAYOUT)
Second Priority

IN- BLK. # LOT. # LOT AREA Model House # OWNER Floor Area w/ W/ covered TYPE (Storey) Carport DATE Actual Date TARGET STATUS ESTIMATE
CHARGE (sqm) Terrace (SQM) area (sqm) Orientation STARTED Done DATE
ERICK Blk. 05 Lot 02 200 Karen Fallarina 72.47 76.62 1 Left 06/06 06/26 ON GOING (15%) Customized

MIKE Blk. 10 Lot 20 202 Ricardo Calibo 91.16 - 1 Left 06/15 07/04 ON GOING (5%) Customized

ALLAN Blk. 06 Lot 15 180 206 w/o 162.14 194.95 2 Left Standard

LIZETTE Blk 15 Lot 05 180 210 w/o 73.65 97.30 1 Right Standard

JAIZA Blk 15 Lot 06 180 211 w/o 72.47 76.62 1 Left Standard

ONE FOR LAYOUT FOR CHECKING OF LAYOUT ON GOING LAYOUT DONE FOR ESTIMATE TOTAL # OF LAYOUT TO REACH 6 MH
0 OUT OF 6 0 2 0 OUT OF 6 6 MORE TO GO (LAYOUT)

You might also like