You are on page 1of 63

SPARC M7 Processor Architecture

This assessment tests the participant's knowledge of the content in the SPARC M7 Processor Architecture
course.

(Answer all questions in this section)


1. Which type of DIMMs are supported by the M7 processor ?
(1/1) Points
DDR4
DDR3
DDR2
DDR5
Correct !

2. How many DIMM slots are supported on the CMIOU board ?


(1/1) Points
32
16
128
64
Correct !

3. Which is the function of the Mystic River ASIC ?


(1/1) Points
Memory Buffer
I/O Hub
Service Processor
Disk Controller
Correct !

4. How many virtual CPUs can a single M7 processor support considering that each thread can
be a virtual CPU ?
(1/1) Points
128
32
64
256
Correct !

5. Which feature of the SPARC M7 processor permits the server to reduce power consumption ?
(1/1) Points
Power gating
Dynamic Voltage Frequency Scaling
Voltage Acclimatization
Dynamic memory allocation
Correct !

6. Which three statements are true about M7 processors ?


(1/1) Points
CLINKS provide for inter-processor connections
Each M7 processor provides coherency links, referred to as CLINKs
CLINKS are used on both the M7 and T7 servers
SSM is also a common features with Intel Processors
Level 4 cache is one of the most important processor enhancements
Correct !

7. What enhancements to the SPARC M7 processor contribute to security at all layers of the
hardware and software stack ?
(1/1) Points
Increased password protection
4 layers of cache
Improvements to on-chip cryptography
Correct !

8. Which systems use the SPARC M7 processor ?


(1/1) Points
SPARC M6-32
SPARC T7-2
SPARC T7-4
Oracle SuperCluster M7
Oracle SuperCluster T5-8
Correct !

9. Which statement is true ?


(1/1) Points
The S4 supports 16 threads per core
The SPARC M7 processor uses the fourth generation CMT Core, referred to as S3.
The SPARC M7 processor uses the fourth generation CMT Core, referred to as S4
The S3 supports 16 threads per core
Correct !

10. What is the total amount of level 3 cache that the M7 processor supports ?
(1/1) Points
256 Mbytes
64 Mbytes
32 Mbytes
128 Mbytes
Correct !

11. Which type of link is an inter-processor cache coherent connection ?


(1/1) Points
CLINK
SP LINK
SLINK
IL
Correct !

SPARC M7 Systems Product Overview - Part 1

This assessment tests the participant's knowledge of the content in the SPARC M7 Systems Product
Overview course.

(Answer all questions in this section)


12. Which are the boot options available on the SPARC M7-8 and M7-16 Servers?
(1/1) Points
Versaboot/eUSB
Internal HBA and HDD
Aura3 Memory Express (NVMe) controller and a Solid-State Disk (SSD).
16 Gb FC to FC SAN attached Storage using Ganymede-Q or Ganymede-E
USB port for a flash stick
Correct !

13. How many DIMM slots are supported on each CMIOU?


(1/1) Points
64
32
16
8
Correct !

14. What is the Silicon Secured Memory feature?


(1/1) Points
A "Software in Silicon" feature that improves the performance of Java.
A "Software in Silicon" feature that adds a 16 bit application data bits which can associate the
pointer to the object it is pointing to.
A "Software in Silicon" feature where a DAX used to accelerate data decompression by
offloading it from the software threads.
A "Software in Silicon" feature where DAX used to execute the database queries offloading it
from the software threads.
Correct !

15. Which links are connected to the switch units from the CMIOUs on the M7-16?
(1/1) Points
coherency
cache
memory
scalability
Correct !

16. Which interconnect is common to the M7-8 and M7-16 configurations?


(1/1) Points
II_CMIOU_SP
II_W_248
II_8_N_RO
XI_N_4_T2B_S
Correct !

17. How many M7 processors are supported on each CMIOU?


(1/1) Points
3
1
4
2
Correct !
18. Select the two specifications that correspond to the M7 processor?
(1/1) Points
Total of 512KB level 2 data cache per core pair
Greater than a 4.0 GHz clock speed
Total of 3 memory controllers
Total of 4 MB of level 3 cache per each set of 4 cores
Total of 32 cores
Correct !

19. Which features of “Software in Silicon” are supported by the SPARC M7 processor?
(1/1) Points
scalability links
Silicon Secured Memory
coherency links
Database Query Acceleration
Database Decompression
Correct !

20. How many CMIOUs are there in a DCU in the M7-16?


(1/1) Points
1
4
2
3
Correct !

21. Which two responses are true about the SPARC M7-8 Server?
(1/1) Points
The M7-8 with 1 PDOM has cache coherency between all 8 M7 processors
The M7-8 with 1 PDOM uses the same internal interconnects as that of the M7-8 with 2 PDOM

The M7-8 with 2 PDOM is configured as a 2x4 socket arrangement with a maximum of 8
processors
The M7-8 has a maximum of 4 processors
The M7-8 with 2 PDOM is configured as a 1x8 socket arrangement with a maximum of 8
processors
Correct !
SPARC M7 Systems Product Overview - Part 2

This assessment tests the participant's knowledge of the content in the SPARC M7 Systems Product
Overview course.

(Answer all questions in this section)


22. Which three of these technologies can be used for the boot disk on the SPARC M7 systems?
(0/1) Points
eUSB
Punched cards
Floppy disk
NVME
Fiber Channel
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

23. Which component contains the Oracle ILOM management software?


(1/1) Points
switch unit
SP
PDECB
CMIOU
Correct !

24. Which component connects the two CMIOU chassis together using SLINKs on a SPARC
M7-16?
(1/1) Points
SP chassis
switch chassis
interconnect chassis
Another CMIOU chassis
Correct !

25. What OS and version is supported on the SPARC M7 system CMIOUs at release?
(1/1) Points
Solaris 11.1
Oracle Linux 6.5
Solaris 11.3
Red Hat Enterprise Linux 6.5
Correct !
26. What service processor management software comes pre-installed on the SPARC M7
systems?
(0/1) Points
Oracle Enterprise Manager Ops Center
Java
Oracle ILOM
Oracle VM Server for SPARC
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

27. Which component contains the M7 processor?


(1/1) Points
SP tray
switch unit
CMIOU
PDECB
Correct !

28. What is a key difference in the PCIe implementation on the SPARC M6-32 versus the
SPARC M7?
(1/1) Points
PCIe generation 3 versus 4
Each CMIOU has its own PCIe slots versus the IOUs used on the SPARC M6-32
PCIe slots support 16 lanes versus 8 lanes
Number of PCIe slots available
Correct !

29. How many DIMM slots can each BoB (referred to as Yuba) support?
(1/1) Points
3
2
4
1
Correct !

30. Which processor-to-processor interconnectivity technology is used to connect between the


CMIOUs in a SPARC M7-8?
(1/1) Points
Scalability links
memory channels
Coherency links
I/O links
Correct !

31. Which generation of the PCIe interconnect is supported by the SPARC M7 systems?
(1/1) Points
1
4
3
2
Correct !

32. What is a key characteristic that is new about the SPARC M7 processor?
(1/1) Points
On-chip memory controllers
3 threads per core
3 cache levels
32 cores
Correct !

33. Where in the CMIOU does the PCIe root complex originate?
(1/1) Points
M7 processor
eUSB
IOH (Mystic River)
IOU
Correct !

34. Which PCIe-based card is used to support an NVME-based boot disk?


(1/1) Points
IB HCA
HBA
card F320
1GbE card
Correct !
35. Which term is used to describe a logical server that runs its own OS?
(1/1) Points
PDOM
zone
LDOM
container
Correct !

36. How many PCIe cards are supported a fully populated the SPARC M7-8?
(1/1) Points
8
16
24
32
Correct !

37. Which memory technology is used on the SPARC M7 systems?


(1/1) Points
DDR3
DDR2
DDR4
DDR5
Correct !

38. Which three statements are true about PDoms and LDoms?
(1/1) Points
PDoms are defined by the interconnect cabling used
PDom is a physical domain and Ldom is a logical domain
Oracle VM Server for SPARC is needed to be able to create LDOms
Ldoms cannot be configured as hard partitions for software licensing purposes
Pdom stands for Pedabyte domain
Correct !

39. How many physical PCIe card slots are there per CMIOI board?
(1/1) Points
1
3
4
2
Correct !

40. Which management tool provides a discovery window to find the server within a network?
(0/1) Points
Oracle Enterprise Manager Ops Center
Oracle VM Server for SPARC
Oracle ILOM
Java
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

41. Which optional software can be installed on the SPARC M7 systems to perform system
management?
(1/1) Points
Oracle Enterprise Manager Ops Center
Oracle ILOM
Oracle VM Server for SPARC
Java
Correct !

42. Which type of disk is used in a NVME implementation?


(1/1) Points
USB flash disk
SATA HDD
SSD
SAS HDD
Correct !

43. Which optional software can be installed on the SPARC M7 systems to create and manage
LDOMs?
(0/1) Points
Java
Oracle ILOM
Oracle Enterprise Manager Ops Center
Oracle VM Server for SPARC
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".
SPARC M7 Systems Product Overview - Part 3

This assessment tests the participant's knowledge of the content in the SPARC M7 Systems Product
Overview course.

(Answer all questions in this section)


44. Which of the following can be roles of a logical domain?
(1/1) Points
I/O Domain
Control Domain
Service Domain
CPU Domain
Correct !

45. During the initial installation of the M7 server, you notice that the SP NET MGT interface is
not available. Which option represents a possible reason for this?
(1/1) Points
It must be connected to a Gigabit network.
The SPARC M7 does not use the SP NET MGT interface.
The network does not use DHCP.
Oracle ILOM is down.
Correct !

46. Based on this output, what version of firmware is this customer running? System_fw_version
= Sun System Firmware 10.1.3.e 2015/01/15 08:53
(1/1) Points
10
0.370138888888889
10.1
10.1.3.e
Correct !

47. You have powered-on HOST3 and want to verify its current status. Which two commands
would give you that output?
(1/1) Points
show status /Servers/Pdomains/Pdomain_3/HOST
show /Servers/Pdomains/Pdomain_3/HOST status
show /Servers/Pdomains/Pdomain_1/HOST status
show /Servers/Pdomains/Pdomain_3/HOST status_detail
Correct !

48. Before you can configure the service procesors, which three pieces of network information
do you need from the customer?
(1/1) Points
SP1 IP address
SP0 IP address
Active SP IP address
Domain IP address
Clock board IP address
Correct !

49. The customer has finished running their tests on the test domain and would like you to
remove it. What command do you run to do that?
(0/1) Points
ldm rm-domain test
ldm rm-ldom test
ldm remove-ldom test
ldm remove-domain test
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

50. Before you can perform a firmware upgrade, you must first check the keyswitch property for
each host. What must it be set to for the firmware upgrade to work?
(1/1) Points
Normal
Open
Diag
Unlocked
Locked
Correct !

51. Which command would you run to switch the ACTIVE_SP responsibilities?
(1/1) Points
set /SP/redundancy initiate_failover_action=true
set /SP failover=true
set SP_failover=true
set /SP/redundancy failover=on
Correct !
52. You are traveling to the customer's site with a new replacement part. What should you have
with you to help prevent electrostatic discharge (ESD) from damaging the new part?
(1/1) Points
steel-toe shoes
screwdriver
torque wrence
antistatic wrist strap
Correct !

53. You are ready to create a logical domain called test. Which command do you execute?
(1/1) Points
ldm set-domain test
ldm add-domain test
ldm add-logical-domain test
ldm create-domain test
Correct !

54. When taking FRUs out of the server, where should they be placed?
(1/1) Points
antistatic mat
foam
raised floor
table
Correct !

55. You're very familiar with ILOM on the T5-8 servers, but notice that there are two targets that
are new to you in ILOM on the SPARC M7 servers? Which two targets are new in the Simplified
Data Model?
(1/1) Points
/Servers
/Storage
/SP
/System
/SYS
Correct !
56. You attempt to add an Oracle ILOM user account but it fails. Which option represents a
possible reason for the failure?
(1/1) Points
You do not have the host control role enabled.
You do not have the user management role enabled.
You have exceeded the maximum number of 20 user accounts.
You need to add SSH keys to the system before creating user accounts.
Correct !

57. After completing the installation, you need to collect the system's configuration. What two
actions do you perform?
(1/1) Points
Snapshot on the Pdoms
Explorer on the SPs
Explorer on the Pdoms
Snapshot on the ACTIVE SP
Correct !

58. Multiple people are working on a server. You power-on HOST1 and it sits for a few minutes
with no messages before starting and then running. Which option represents a possible reason for
this?
(1/1) Points
The HOST does not meet the minimum configuration requirements.
There is a lot of activity on the server.
Another HOST is going through POST.
Your firmware is not up to date.
Correct !

59. You need to find the system's serial number to open a service call. What command do you
run to see it?
(1/1) Points
show /System model
show /SP hostname
show /System serial_number
show /SP network
Correct !

60. You are ready to run SunVTS against the SPARC M7 platform. Which command do you use
to verify that it is installed?
(0/1) Points
pkg list sunvts
pkg list entire sunvts
pkg install system/test/sunvts
pkg list system/test/sunvts
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

56. You attempt to add an Oracle ILOM user account but it fails. Which option represents a
possible reason for the failure?
(1/1) Points
You do not have the host control role enabled.
You do not have the user management role enabled.
You have exceeded the maximum number of 20 user accounts.
You need to add SSH keys to the system before creating user accounts.
Correct !

57. After completing the installation, you need to collect the system's configuration. What two
actions do you perform?
(1/1) Points
Snapshot on the Pdoms
Explorer on the SPs
Explorer on the Pdoms
Snapshot on the ACTIVE SP
Correct !

58. Multiple people are working on a server. You power-on HOST1 and it sits for a few minutes
with no messages before starting and then running. Which option represents a possible reason for
this?
(1/1) Points
The HOST does not meet the minimum configuration requirements.
There is a lot of activity on the server.
Another HOST is going through POST.
Your firmware is not up to date.
Correct !

59. You need to find the system's serial number to open a service call. What command do you
run to see it?
(1/1) Points
show /System model
show /SP hostname
show /System serial_number
show /SP network
Correct !

60. You are ready to run SunVTS against the SPARC M7 platform. Which command do you use
to verify that it is installed?
(0/1) Points
pkg list sunvts
pkg list entire sunvts
pkg install system/test/sunvts
pkg list system/test/sunvts
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

66. Which three statements are prerequisites for powering on HOST0?


(0/1) Points
keywitch must be set to Locked.
There must be suffucuent resources assigned to HOST0.
HOST0 must currently be powered off.
keyswitch must be set to Normal.
HOST0 must have at least one DCU assigned to it.
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

67. You want to assign 12 virtual CPUs to the control domain. Which command do you run?
(1/1) Points
ldm assign-vcpu 12 control
ldm set-vcpu 12 control
ldm set-vcpu 12 primary
ldm assign-vcpu 12 primary
Correct !

SPARC M8 vs M7 Server Differences Assessment

This assessment tests the participant's knowledge of the content in the SPARC M8 vs M7 Server Differences
knowledge requirement.

(Answer all questions in this section)


68. On which platforms can M7 and M8 CMIOUs be mixed?
(0/1) Points
M7-8 platform using M7 Service Processor
M7-8 and M7-16 platform using M7 Service Processor
M7-8 with 2 Pdoms using M7 Service Processor and M8 CMIOUs in DCU#1
M7-8 with 2 Pdoms using M7 Service Processor, M7 and M8 CMIOUs in the same DCU
Incorrect. Please review all the SPARC M8 vs M7 courses and try again.

69. Mixing an M7 SP and an M8 SP in the same chassis is supported.


(1/1) Points
True
False
Correct !

70. What is the minimum ILOM major release supporting M8?


(0/1) Points
ILOM 4.x
ILOM 9.8
ILOM 3.x
ILOM 5.x
Incorrect. Please review all the SPARC M8 vs M7 courses and try again.

71. What components have been modified for M8 servers as compared to those used in M7
servers?
(0/1) Points
Service Processor, Power Supply
CMIOU, Service Processor, Power Supply
CMIOU, Power Supply
CMIOU, Service Processor
Incorrect. Please review all the SPARC M8 vs M7 courses and try again.

72. What are the configuration rules for Power Supplies A261 and A265?
(0/1) Points
A261 and A265 can be mixed in a platform
A261 and A265 cannot be mixed and A265 from Belpower and Delta should not be mixed.
A261 and A265 cannot be mixed but A265 from Belpower and Delta can be mixed with no error

Incorrect. Please review all the SPARC M8 vs M7 courses and try again.

73. What is the connection between the CMIOU, SP and eUSB disk?
(1/1) Points
Using respectively root ports 3 and 1 of the IO controller
Sharing the root port 2 of the IO controller
Using respectively root ports 4 and 2 of the IO controller
Sharing the root port 4 of the IO controller
Correct !

74. The “ip-transport.interconnect-down” and “ip-transport.link-down” alerts are reporting a


problem on _________.
(1/1) Points
The PCIe switch on the CMIOU
The indicted network interface
The connection between the NIC and the network switch
The EoUSB interconnect path supporting the FMA Fault Proxying mechanism
Correct !

75. What happens if Power Supplies A261 and A265 are mixed in a platform?
(0/1) Points
The system is run as expected without any impact.
The running hosts will be stopped and it's not possible to restart any host.
The running hosts will not be impacted and it's possible to restart the hosts with non-dominant
PS faulted.
The running hosts will be stopped but it's then possible to restart the hosts with non-dominant PS
faulted.
Incorrect. Please review all the SPARC M8 vs M7 courses and try again.

76. Which IO Controller root port is used on the M8 CMIOU, but was left not-connected
(unused) on the M7 CMIOU?
(1/1) Points
4
1
2
3
Correct !

77. What happens when an unsupported CMIOU configuration is detected?


(1/1) Points
Starting the respective host will succeed. No impact on any running host. An alert is generated.
Starting the respective host will fail. Any running host will be gracefully stopped. An alert is
generated.
Starting the respective host will fail. No impact on any running host. An alert is generated.
Correct !

EIS Installation Best Practices Online Assessment

This assessment tests the participant's knowledge of accessing and using EIS methodology.

(Answer all questions in this section)


78. What are the two primary objectives for the Installation Configuration Planning step of the
EIS methodology?
(1/1) Points
Oracle/Partner and Customer will determine and mutually agree upon the hardware and software
installation requirements which will be documented in the Installation and Configuration Plan

Oracle/Partner confirms power and cooling requirements for system installation


Customer provides walk-through of installation site
Tests that will be performed during the Systems Testing will be defined.
Correct!

79. What are three factors that influence how long a system (server, storage, engineered system)
will require to be acclimatized after delivery to a customer, before power can be applied without
causing damage?
(1/1) Points
timezone
data center space
temperature
humidity
cleanliness
Correct!

80. Which two EIS documents are most useful during the Installation and Configuration of
Oracle Hardware and Software step?
(0/1) Points
DVD
Installation Configuration Plan
EIS Checklist
Site-Audit Report
Operational Handover Agreement
Incorrect! Please review the "Using the EIS Methodology" course and try again.

81. According to the EIS methodology, when issues are uncovered during the Site-Audit, who
should be notified?
(0/1) Points
Customer point of contact
Oracle sales management
Installation coordinator if applicable
Oracle Premier Support
Incorrect! Please review the "Using the EIS Methodology" course and try again.

82. What is the primary purpose of the”Basic Solaris” standard?


(1/1) Points
Defines a method for achieving a consistent installation for Oracle Servers with Solaris OS
Differentiates between Linux and Solaris installation processes on dual-boot systems
Describes how to install legacy versions of Solaris on systems that need to support backward
compatible applications
Specifically describes how to install Solaris on non-SPARC hardware
Correct!

83. Name three of the problems that EIS was created to overcome?
(0/1) Points
Inconsistent installations: Customers buying identical servers for two locations were dismayed to
find different patch levels, firmware versions etc.
Standards for delivery of replacement parts for Oracle hardware
Poor communication/use of Best Practices
Lack of formal agreement with customers as to outcome of an installation
Oracle hardware shipping best practices for on-time delivery
Incorrect! Please review the "Using the EIS Methodology" course and try again.

84. What are two cautions that should be acknowledged when acclimatizing a system?
(1/1) Points
The maximum positive or negative temperature gradient that is permitted for multi-layer boards
is approximately 2° C (4° F) per hour.
Avoid unpacking items inside the computer centre (dust/dirt contaminating filters etc.)
Once powered on the temperature is no longer an issue, as internal cooling systems commence

Powering ON the system will speed the acclimatization process as the heat from the system will
accelerate its warming
Correct!

85. Why is the rate of temperature change when acclimatizing systems such an important factor
as described in the EIS methodology?
(0/1) Points
Variations in temperature do not have as big an impact as do Service contract considerations for
how long an installation will take
Systems should be warmed up and powered ON as quickly as possible to optimize the
installation project timeline
It is actually not relevant or important
Variations in temperature should not exceed the approved gradient of approximately 2° C (4° F)
per hour, because ignoring this may could lead to long-term damage (hair-cracks) on the boards

Incorrect! Please review the "Using the EIS Methodology" course and try again.

86. Who is involved in the Project Initiation phase?


(1/1) Points
Oracle Installation Coordinator or Project Manager (if applicable)
Customer point of contact
Oracle Financing contact
3rd party Service Provider
Partner point of contact
Correct!

87. What should you do if you believe you have found an error in an EIS checklist?
(0/1) Points
Email Larry Ellison and recommend changes
Submit your concerns to My Oracle Support
Follow the feedback method on the last page of every checklist: email SUPPORT-PARTNER-
QUESTIONS_WW_GRP@oracle.com
Assume that the EIS team is already aware and the next version of the checklist will be updated

Incorrect! Please review the "Using the EIS Methodology" course and try again.

88. What should partners do before first using ESISdocV4? (Select two)
(0/1) Points
Submit their EIS Test Procedure Plan outcomes
Review Oracle product overview documentation
Review the Openoffice presentation on EISdoc V4 found on the EIS Planning & Documentation
web page
Review the “EISdoc V4 Getting Started Cookbook” and “Success with EISdoc V4 Cookbook”

Incorrect! Please review the "Using the EIS Methodology" course and try again.

89. Which Oracle products are covered by EIS Checklists – select all that apply.
(0/1) Points
Oracle Fusion Middleware
Switches
ERP applications
OS and Cluster-related Software
Storage
Servers
Engineered Systems
Incorrect! Please review the "Using the EIS Methodology" course and try again.

90. Which four documents are included as part of the Operational Handover?
(0/1) Points
MOS Internal Documentation
Installation and Configuration Plan
EIS Checklist for the System installed
Test Procedures Plan
Site Audit Report
System Documentation
Incorrect! Please review the "Using the EIS Methodology" course and try again.

91. What if the customer has their own labeling methodology that differs from the recommended
one from EIS?
(1/1) Points
Redo cabling throughout the datacenter to meet the EIS standard
Submit a Service Request for Oracle approval on use of the customer labeling and routing
methods
Ignore the customer’s standard and use the EIS standard
Follow the customer's standard for cable labeling provided it meets with EIS requirements for
identification and port location.
Correct!
92. What are two statements that are true about EIS checklists?
(0/1) Points
Checklists are intended as guidelines for properly trained installers and are NOT a substitute for
appropriate product training.
Checklists are publicly available on oracle.com
EIS installation checklists are intended to guide the installer through the installation in a logical
and consistent manner
Checklists are a valuable tool to share with customers so they know how to install systems
themselves
Incorrect! Please review the "Using the EIS Methodology" course and try again.

93. What are the four key points covered in each test topic of the Test Procedures Plan?
(0/1) Points
Prerequisites
Conclusion
Test Result
Method
Outcome
Objective
Incorrect! Please review the "Using the EIS Methodology" course and try again.

94. What three typical activities are done during the Project Initiation phase of the EIS
Methodology?
(0/1) Points
System delivery occurs, and the project commences
The EIS Site-Audit is scheduled
System configuration details are documented.
Details about the customer are determined and documented
Details about the project are identified and documented, for example, is this a single system
installation or a complex, multi-product installation
Incorrect! Please review the "Using the EIS Methodology" course and try again.

95. What are three types of configuration information typically documented in an Installation
Configuration Plan?
(0/1) Points
System host names
Boot Disk Layout
General and Management Network Configuration
System documentation and guidelines
IO cards and controllers
Power cord specifications
Incorrect! Please review the "Using the EIS Methodology" course and try again.

96. When should the Site-Audit be performed?


(0/1) Points
Prior to the completion of the sale, in order to ensure that the customer’s location is viable
As soon as possible, and certainly prior to delivery of the system
As soon as the product has been delivered to the customer
After the system has been acclimatized and is ready for unpacking at the customer site
Incorrect! Please review the "Using the EIS Methodology" course and try again.

97. What four tasks are typically happening at the EIS Planning and Preparation stage in the
installation process?
(0/1) Points
Compile EIS planning documents
Cable and install systems into custom rack
Unpack and power ON systems
Identify Installation team – Oracle Installation Coordinator, Project Manager, Customer Point of
Contact, others as needed
Notification of Customer Installation project
Begin work on Project Schedule
Incorrect! Please review the "Using the EIS Methodology" course and try again.

98. Which three responses are true regarding EISdoc v4?


(1/1) Points
Is accessible to customers and end-users of Oracle hardware and software
Contains documents matched to the steps in the EIS Methodology
Is available on the partner Enterprise Installations Standards web page and on the EIS-DVD
Is a free guide to configuring Oracle software
Is an OpenOffice-based set of documentation that includes planning for installations of Oracle
equipment and some software
Correct!

99. Assuming a SPARC T5 Server installation on which you install Solaris 11, what EIS
documentation, at a minimum, is it recommended that you bring to support you in the installation
project?
(1/1) Points
EIS Installation Checklist for Common Array Manager
EIS Installation Checklist for SPARC T5
EIS Installation Checklist for Solaris 11 OS
EIS Installation Checklist for Sun Datacenter InfiniBand Switch 36
Correct!

100. What do EIS deliverables define?


(0/1) Points
EIS deliverables are the Customer Support Identifiers that customers use for field delivery
service after an installation has completed
EIS deliverables are the documents that are left behind with customers after an installation
service is performed
EIS deliverables give a high level description of the scope of the EIS activities for each product
or product family
EIS deliverables describe detailed process steps for each phase of the installation service
Incorrect! Please review the "Using the EIS Methodology" course and try again.

101. If the customer has asked for some customization of their installation, how is testing for that
accomplished? Choose all responses that apply.
(0/1) Points
Oracle is automatically responsible for any non-standard installation procedure, regardless of
whether they were agree to as part of the Installation and Configuration Plan
Additional tests can be inserted into the Test Procedures plan
Testing above and beyond the Covered System Tests are at the sole discretion of Oracle and/or
the Partner installer
Not all installation actions need testing
Incorrect! Please review the "Using the EIS Methodology" course and try again.

102. What is the purpose for the Operational Handover step in the EIS Methodology?
(0/1) Points
Perform system testing and diagnostics
Documents how to use the EIS documentation and standards
Documents the installation and configuration of Customer's system(s)
Used to negate responsibility for any ongoing System issues
Incorrect! Please review the "Using the EIS Methodology" course and try again.

103. You are assigned to an installation project in France in February to install 5 new SPARC T5
servers. The servers, in their original packaging, are sitting in the customer’s loading dock with a
temperature of 8 degrees C (46 degrees F). The customer’s data center is 20 degrees C (68
degrees F). What is the recommended next step in acclimating these systems?
(0/1) Points
Move the systems (still packed) into the data center
Unpack the servers and store in the data center
Move the systems (still packed) into a room with a similar environment to the data center
Unpack the servers and store in the loading dock
Incorrect! Please review the "Using the EIS Methodology" course and try again.

104. What are Oracle Standard System Installations (OSSI)?


(1/1) Points
Field Delivery Support Services offered through certified partners
Installation Services sold by 3rd party service providers
Advanced professional services offered by IBM Global Services
Installation Services sold by Oracle Advanced Customer Support
Correct!

105. Why should you typically complete the Installation Configuration Plan and create your Test
Procedures Plan at the same time?
(0/1) Points
You should create the Test Procedures Plan after you have completed the system installation and
configuration.
Test Procedures plan is a standard document used in all generic system installations.
As you work through the system configuration process with your customer, you should state how
you will test key items in the system’s configuration for having been successfully completed.

Incorrect! Please review the "Using the EIS Methodology" course and try again.

106. What tasks occur during the operational handover phase of the EIS methodology?
(0/1) Points
Obtain customer signatures to successful close project
Collate the EISdocV4 documents pertaining to this customer installation, and product
documentation for handover
Document the serial number for the system(s) installed, as well as any comments pertaining to
the installation
Provide the customer the 20% installation service rebate that is required after a successful
installation
Incorrect! Please review the "Using the EIS Methodology" course and try again.
107. What three documents are typically used as part of the EIS Planning and Preparation stage
in the installation process?
(1/1) Points
Installation and Configuration Plan
Project Schedule
Test Procedures Plan
Operational Hand-off Form
Site Audit Report
Acclimatization Report
Correct!

108. Why it is important to do Installation planning, rather than just asking the customer as you
work through the installation process? (Select three)
(0/1) Points
Customer technical contact may not be readily available
Support Services will not engage on services requests if no installation planning was done
Planning leads to more thoughtful consideration for a predictable outcome of the installation
process
Pricing for Installation Services is less expensive if planning in not included
Continuing interruptions can detract from the professionalism of your work, and lead to customer
dissatisfaction
Incorrect! Please review the "Using the EIS Methodology" course and try again.

109. What are two activities that take place during the System Test step of the EIS methodology?
(0/1) Points
Tests specified in the Test Procedures Plan Plan will be carried performed
Electrical grounding and environmental assessment
Application installation, configuration, and testing
On Solaris-based systems, Oracle's Explorer Data Collector will be run and the results evaluated
with ORAS/CLI from the EIS-DVD
Incorrect! Please review the "Using the EIS Methodology" course and try again.

110. Why are EIS deliverables relevant for Partner installations too?
(0/1) Points
Advanced Customer Services mandates that Partners use the EIS methodology for installations

When partners use the EIS deliverables and submit documentation to that effect, their customer
gets a 25% discount on support
EIS deliverables describe the amount of time, materials and deliverables are in scope for a
standard installation
EIS deliverables provide flexibility when customers want to make ad-hoc configuration changes

Incorrect! Please review the "Using the EIS Methodology" course and try again.

111. Why do the EIS Standards recommend that external cables between Oracle hardware, such
as servers, storage devices, network devices and ports be clearly labeled?
(0/1) Points
Service requests for field diagnostics will not be accepted unless cables are labeled
Cable routing should be done with rubber bands for ease of reconfiguration
For ease of maintenance it should be unambiguously clear from the label on each cable, where
the cable has to be attached
Labeling is not an EIS best practice
Incorrect! Please review the "Using the EIS Methodology" course and try again.

112. What is the main purpose of the EIS methodology?


(1/1) Points
To provide a foundational methodology for front line support triage by Help Desk providers.

To enable customers to install and service Oracle hardware and software.


To use best practices to support standard field delivery and break/fix services by partners.
To use best practices, standards, methodologies and continuous process improvement to ensure
consistent, efficient, supportable and high quality product installations globally
Correct!

113. Which three statements are true about EIS?


(1/1) Points
EIS stands for “Enterprise information Standards”
EIS is a quick and dirty process for expediting Oracle system installations
EIS stands for “Enterprise Installation Standards”
EIS evolved from the field, is sustained by those closely involved with the field, and is intended
to assist the field
EIS is a methodology designed to address issues before, during and after the actual hands-on
installation of Oracle systems
Correct!

114. What are three items in the EIS Site-Audit Report are documented for all Oracle hardware?
(1/1) Points
IP Address requirements
Operating System requirements
Facility Power requirements
Operating Environment and Cooling requirements
Access Route requirements
Correct!

115. Name two functions for the EIS-DVD during the Installation and Configuration of Oracle
Hardware and Software step in the EIS methodology?
(0/1) Points
Contains required patches and firmware for most installations
Provides installation assessment and diagnostic tools
Used as a back-up for complete documentation sets that are on http://docs.oracle.com
Provides an excellent tool as a leave behind utility for customers
Incorrect! Please review the "Using the EIS Methodology" course and try again.

116. Which four objectives are primary goals for an EIS Site Audit?
(0/1) Points
Determine the floor weight load capacity at the location where the System will be installed
Determine how many logical domains need to be configured on the system
Determine the environmental conditions at Customer's site including temperature, humidity,
cleanliness and such other assessments as are determined to be necessary in Oracle's sole
discretion
Determine the availability of required electrical power to run and maintain the System
Determine how frequently system backups will be completed
Determine installation needs for the System, including such assessments as: the suitability of
access routes to the installation location, such as doors, elevators, floor strengths and ramps
Incorrect! Please review the "Using the EIS Methodology" course and try again.

117. For safety awareness with respect to grounding, if a system has been modified after the
manufacturer's assembly process, what three recommendations does the EIS Grounding Standard
make?
(0/1) Points
If the temperature is below 60 degrees F., warm the room first before power ON
If qualified personnel did not test the safety of the modified system then proper testing should be
requested before Oracle and/or partner personnel will work on the equipment
Determine whether the local electrician can support the installation process
If modifications involved any power supplies, distribution units or wiring, did qualified
personnel verify that the modification was was correct and did they test the system to ensure that
it doesn't pose any safety hazard?
Check whether the modification involved any power supplies, distribution units or wiring?
Incorrect! Please review the "Using the EIS Methodology" course and try again.

118. When should you review deliverables and why?


(0/1) Points
Ideally EIS deliverables would be reviewed at the very start of an installation project, as they
clearly define scope, roles and responsibilities, and project deliverables
EIS deliverables are used as a last step in the installation process to ensure the installer provided
everything that is required
EIS deliverables are included in the Oracle system shipping and packaging documents near the
start of an installation
EIS deliverables are an interim checklist to ensure that at the mid-way point of an installation the
project remains on track.
Incorrect! Please review the "Using the EIS Methodology" course and try again.

119. Why should you use the EIS methodology to guide your installation process?
(1/1) Points
Installation processes are very lengthy, the EIS methodology is quick and dirty
The EIS methodology provides a 20% discount on Support Services if you install your
customers’ hardware or software using it
Larry Ellison has mandated using EIS
Using the proven EIS methodology will provide step-by-step installation guidelines, help
guarantee a quality installation, make your life easier, and ensure customer satisfaction
Correct!

120. What should you do with the EIS checklist when an installation project is complete?
(1/1) Points
Remove the EIS checklist and other confidential Oracle Intellectual Property from the customer
datacenter
Leave the EIS checklist with the customer so that they can re-install when they need to
Crumple the checklist and throw it in the customer wastepaper bin
Post the EIS checklist and Test Procedures Plan to My Oracle Support under your customer’s
account
Correct!

121. What two activities are accomplished during Installation Task Planning step in the EIS
Methodology?
(0/1) Points
System unpacking and acclimatization
Organization of the team who will actively work the Installation
Communicate schedule for installation to the customer
Review the timeframe options for delivery of the service
Networking and system component cabling
Incorrect! Please review the "Using the EIS Methodology" course and try again.

122. What is the primary goal of the Installation and Configuration of Oracle Hardware and
Software step in the EIS methodology?
(0/1) Points
Troubleshooting software configuration issues
System acclimatization, installation, and basic configuration
Hardware cabling , wiring and Power ON
Managing transition from Installation phase to Field Service issue recording
Incorrect! Please review the "Using the EIS Methodology" course and try again.

123. What is the mission statement for use of the Enterprise Installation Standards?
(1/1) Points
To manage communication and resolution of Services Requests in a timely and customer-
friendly manner
To use a methodology for support service that is from the field, created by the field for the Field.

To drive the ongoing development and usage of Enterprise Installation Standards (EIS), resulting
in consistent, high quality, and cost effective installations that speed time to deployment and
provide the foundation for enhanced stability and performance.
To drive consistent best practices for Oracle Services field delivery
Correct!

124. What is the primary purpose of the EIS-DVD?


(0/1) Points
The EIS-DVD is a tool that is provided to installation partners as a give-away to customers
The EIS-DVD is an annually released product which support all hardware installations, and
documents all bugs and issues that have been logged during the prior year
The EIS-DVD is used for on-the-job tutorials on how to install Oracle servers and storage
The EIS-DVD is to help installers of Oracle/Sun products perform consistent installations in an
efficient manner.
Incorrect! Please review the "Using the EIS Methodology" course and try again.
125. What is found on the EIS-DVD? Select all the apply.
(0/1) Points
Scripts that assist during the installation
Sales and presales technical training on Oracle systems
Tools to help verify the quality of the installation (e.g. ORAS/CLI)
Selected Oracle/Sun Software
A complete set all configuration files for every Oracle server, storage system and Engineered
system
Incorrect! Please review the "Using the EIS Methodology" course and try again.

1. What enhancements to the SPARC M7 processor contribute to security at all layers of the
hardware and software stack ?
(1/1) Points
4 layers of cache
Improvements to on-chip cryptography
Increased password protection
Correct !

2. Which statement is true ?


(1/1) Points
The SPARC M7 processor uses the fourth generation CMT Core, referred to as S3.
The S3 supports 16 threads per core
The S4 supports 16 threads per core
The SPARC M7 processor uses the fourth generation CMT Core, referred to as S4
Correct !

3. How many DIMM slots are supported on the CMIOU board ?


(1/1) Points
128
64
16
32
Correct !

4. Which type of link is an inter-processor cache coherent connection ?


(1/1) Points
SP LINK
IL
SLINK
CLINK
Correct !

5. Which systems use the SPARC M7 processor ?


(1/1) Points
SPARC T7-4
Oracle SuperCluster T5-8
SPARC M6-32
SPARC T7-2
Oracle SuperCluster M7
Correct !

6. Which type of DIMMs are supported by the M7 processor ?


(1/1) Points
DDR4
DDR3
DDR2
DDR5
Correct !

7. Which is the function of the Mystic River ASIC ?


(1/1) Points
I/O Hub
Service Processor
Memory Buffer
Disk Controller
Correct !

8. Which three statements are true about M7 processors ?


(1/1) Points
CLINKS are used on both the M7 and T7 servers
Each M7 processor provides coherency links, referred to as CLINKs
SSM is also a common features with Intel Processors
CLINKS provide for inter-processor connections
Level 4 cache is one of the most important processor enhancements
Correct !
9. Which feature of the SPARC M7 processor permits the server to reduce power consumption ?
(1/1) Points
Dynamic Voltage Frequency Scaling
Power gating
Dynamic memory allocation
Voltage Acclimatization
Correct !

10. What is the total amount of level 3 cache that the M7 processor supports ?
(1/1) Points
256 Mbytes
64 Mbytes
128 Mbytes
32 Mbytes
Correct !

11. How many virtual CPUs can a single M7 processor support considering that each thread can
be a virtual CPU ?
(1/1) Points
64
256
32
128
Correct !

SPARC M7 Systems Product Overview - Part 1

This assessment tests the participant's knowledge of the content in the SPARC M7 Systems Product
Overview course.

(Answer all questions in this section)


12. Which features of “Software in Silicon” are supported by the SPARC M7 processor?
(1/1) Points
Database Decompression
Database Query Acceleration
scalability links
Silicon Secured Memory
coherency links
Correct !

13. Which links are connected to the switch units from the CMIOUs on the M7-16?
(1/1) Points
coherency
scalability
cache
memory
Correct !

14. Which interconnect is common to the M7-8 and M7-16 configurations?


(1/1) Points
II_8_N_RO
II_W_248
XI_N_4_T2B_S
II_CMIOU_SP
Correct !

15. How many CMIOUs are there in a DCU in the M7-16?


(1/1) Points
1
2
3
4
Correct !

16. What is the Silicon Secured Memory feature?


(1/1) Points
A "Software in Silicon" feature that adds a 16 bit application data bits which can associate the
pointer to the object it is pointing to.
A "Software in Silicon" feature where DAX used to execute the database queries offloading it
from the software threads.
A "Software in Silicon" feature that improves the performance of Java.
A "Software in Silicon" feature where a DAX used to accelerate data decompression by
offloading it from the software threads.
Correct !

17. How many M7 processors are supported on each CMIOU?


(1/1) Points
2
4
3
1
Correct !

18. Which two responses are true about the SPARC M7-8 Server?
(1/1) Points
The M7-8 has a maximum of 4 processors
The M7-8 with 2 PDOM is configured as a 1x8 socket arrangement with a maximum of 8
processors
The M7-8 with 1 PDOM has cache coherency between all 8 M7 processors
The M7-8 with 1 PDOM uses the same internal interconnects as that of the M7-8 with 2 PDOM

The M7-8 with 2 PDOM is configured as a 2x4 socket arrangement with a maximum of 8
processors
Correct !

19. How many DIMM slots are supported on each CMIOU?


(1/1) Points
16
32
8
64
Correct !

20. Select the two specifications that correspond to the M7 processor?


(1/1) Points
Total of 512KB level 2 data cache per core pair
Total of 3 memory controllers
Total of 32 cores
Total of 4 MB of level 3 cache per each set of 4 cores
Greater than a 4.0 GHz clock speed
Correct !

21. Which are the boot options available on the SPARC M7-8 and M7-16 Servers?
(1/1) Points
Versaboot/eUSB
USB port for a flash stick
Internal HBA and HDD
16 Gb FC to FC SAN attached Storage using Ganymede-Q or Ganymede-E
Aura3 Memory Express (NVMe) controller and a Solid-State Disk (SSD).
Correct !

SPARC M7 Systems Product Overview - Part 2

This assessment tests the participant's knowledge of the content in the SPARC M7 Systems Product
Overview course.

(Answer all questions in this section)


22. Which management tool provides a discovery window to find the server within a network?
(1/1) Points
Oracle ILOM
Oracle Enterprise Manager Ops Center
Java
Oracle VM Server for SPARC
Correct !

23. Which optional software can be installed on the SPARC M7 systems to perform system
management?
(1/1) Points
Oracle ILOM
Oracle VM Server for SPARC
Java
Oracle Enterprise Manager Ops Center
Correct !

24. What is a key characteristic that is new about the SPARC M7 processor?
(1/1) Points
3 threads per core
On-chip memory controllers
32 cores
3 cache levels
Correct !

25. Which term is used to describe a logical server that runs its own OS?
(1/1) Points
zone
PDOM
LDOM
container
Correct !

26. Where in the CMIOU does the PCIe root complex originate?
(1/1) Points
IOU
eUSB
IOH (Mystic River)
M7 processor
Correct !

27. Which component contains the Oracle ILOM management software?


(1/1) Points
CMIOU
SP
PDECB
switch unit
Correct !

28. Which generation of the PCIe interconnect is supported by the SPARC M7 systems?
(1/1) Points
1
3
4
2
Correct !

29. What OS and version is supported on the SPARC M7 system CMIOUs at release?
(1/1) Points
Red Hat Enterprise Linux 6.5
Oracle Linux 6.5
Solaris 11.1
Solaris 11.3
Correct !
30. Which PCIe-based card is used to support an NVME-based boot disk?
(1/1) Points
IB HCA
HBA
card F320
1GbE card
Correct !

31. Which component contains the M7 processor?


(1/1) Points
PDECB
SP tray
switch unit
CMIOU
Correct !

32. Which component connects the two CMIOU chassis together using SLINKs on a SPARC
M7-16?
(1/1) Points
switch chassis
Another CMIOU chassis
interconnect chassis
SP chassis
Correct !

33. How many PCIe cards are supported a fully populated the SPARC M7-8?
(1/1) Points
32
24
8
16
Correct !

34. What is a key difference in the PCIe implementation on the SPARC M6-32 versus the
SPARC M7?
(1/1) Points
Number of PCIe slots available
Each CMIOU has its own PCIe slots versus the IOUs used on the SPARC M6-32
PCIe slots support 16 lanes versus 8 lanes
PCIe generation 3 versus 4
Correct !

35. Which memory technology is used on the SPARC M7 systems?


(1/1) Points
DDR5
DDR3
DDR2
DDR4
Correct !

36. Which processor-to-processor interconnectivity technology is used to connect between the


CMIOUs in a SPARC M7-8?
(1/1) Points
memory channels
Scalability links
Coherency links
I/O links
Correct !

37. Which type of disk is used in a NVME implementation?


(1/1) Points
SAS HDD
SATA HDD
SSD
USB flash disk
Correct !

38. How many physical PCIe card slots are there per CMIOI board?
(1/1) Points
3
4
2
1
Correct !
39. Which optional software can be installed on the SPARC M7 systems to create and manage
LDOMs?
(0/1) Points
Oracle Enterprise Manager Ops Center
Oracle ILOM
Oracle VM Server for SPARC
Java
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

40. Which three statements are true about PDoms and LDoms?
(1/1) Points
PDoms are defined by the interconnect cabling used
PDom is a physical domain and Ldom is a logical domain
Pdom stands for Pedabyte domain
Ldoms cannot be configured as hard partitions for software licensing purposes
Oracle VM Server for SPARC is needed to be able to create LDOms
Correct !

41. What service processor management software comes pre-installed on the SPARC M7
systems?
(1/1) Points
Oracle ILOM
Java
Oracle Enterprise Manager Ops Center
Oracle VM Server for SPARC
Correct !

42. How many DIMM slots can each BoB (referred to as Yuba) support?
(1/1) Points
1
3
2
4
Correct !

43. Which three of these technologies can be used for the boot disk on the SPARC M7 systems?
(1/1) Points
eUSB
Fiber Channel
NVME
Punched cards
Floppy disk
Correct !

SPARC M7 Systems Product Overview - Part 3

This assessment tests the participant's knowledge of the content in the SPARC M7 Systems Product
Overview course.

(Answer all questions in this section)


44. A customer asks you to create a user account for a night-shift employee to be able to monitor
the system but to nothing else. Which privilege do you assign to this user?
(1/1) Points
administrator (a)
console (c )
user (u)
read-only operator (o)
Correct !

45. You're very familiar with ILOM on the T5-8 servers, but notice that there are two targets that
are new to you in ILOM on the SPARC M7 servers? Which two targets are new in the Simplified
Data Model?
(1/1) Points
/System
/Storage
/Servers
/SP
/SYS
Correct !

46. You want to assign 12 virtual CPUs to the control domain. Which command do you run?
(1/1) Points
ldm assign-vcpu 12 primary
ldm set-vcpu 12 primary
ldm set-vcpu 12 control
ldm assign-vcpu 12 control
Correct !
47. Multiple people are working on a server. You power-on HOST1 and it sits for a few minutes
with no messages before starting and then running. Which option represents a possible reason for
this?
(1/1) Points
The HOST does not meet the minimum configuration requirements.
Your firmware is not up to date.
There is a lot of activity on the server.
Another HOST is going through POST.
Correct !

48. You are ready to run SunVTS against the SPARC M7 platform. Which command do you use
to verify that it is installed?
(0/1) Points
pkg install system/test/sunvts
pkg list system/test/sunvts
pkg list sunvts
pkg list entire sunvts
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

49. You are ready to create a logical domain called test. Which command do you execute?
(1/1) Points
ldm add-logical-domain test
ldm add-domain test
ldm create-domain test
ldm set-domain test
Correct !

50. You are traveling to the customer's site with a new replacement part. What should you have
with you to help prevent electrostatic discharge (ESD) from damaging the new part?
(1/1) Points
torque wrence
screwdriver
antistatic wrist strap
steel-toe shoes
Correct !

51. Which command would you run to switch the ACTIVE_SP responsibilities?
(1/1) Points
set SP_failover=true
set /SP failover=true
set /SP/redundancy initiate_failover_action=true
set /SP/redundancy failover=on
Correct !

52. Which three statements are prerequisites for powering on HOST0?


(0/1) Points
HOST0 must have at least one DCU assigned to it.
keywitch must be set to Locked.
HOST0 must currently be powered off.
keyswitch must be set to Normal.
There must be suffucuent resources assigned to HOST0.
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

53. You attempt to add an Oracle ILOM user account but it fails. Which option represents a
possible reason for the failure?
(1/1) Points
You do not have the user management role enabled.
You do not have the host control role enabled.
You have exceeded the maximum number of 20 user accounts.
You need to add SSH keys to the system before creating user accounts.
Correct !

54. After completing the installation, you need to collect the system's configuration. What two
actions do you perform?
(1/1) Points
Explorer on the SPs
Explorer on the Pdoms
Snapshot on the ACTIVE SP
Snapshot on the Pdoms
Correct !

55. You need to find the system's serial number to open a service call. What command do you
run to see it?
(1/1) Points
show /System model
show /SP hostname
show /SP network
show /System serial_number
Correct !

56. When taking FRUs out of the server, where should they be placed?
(1/1) Points
table
antistatic mat
foam
raised floor
Correct !

57. Based on this output, what version of firmware is this customer running? System_fw_version
= Sun System Firmware 10.1.3.e 2015/01/15 08:53
(1/1) Points
10
10.1
0.370138888888889
10.1.3.e
Correct !

58. Which three components require IP addresses when you configure the SP network?
(1/1) Points
ACTIVE_SP
SP1
SLAVE_SP
SP0
SPARE_SP
Correct !

59. Which of the following can be roles of a logical domain?


(1/1) Points
Control Domain
CPU Domain
Service Domain
I/O Domain
Correct !
60. What enforces the partitioning of the server's resources in the Ldoms?
(1/1) Points
Solaris
Hypervisor
SP
OBP
Correct !

61. You want to start /HOST0 but, by accident, you hit Enter after typing start /HOST. Which
option best represents the outcome of this?
(1/1) Points
The start command gets applied to all HOSTs in the system.
The start command lists all of the HOSTs and asks you which one you want to start.
The start command defaults to HOST0 if you do not specify a HOST number.
The start command gives an error.
Correct !

62. Before you can configure the service procesors, which three pieces of network information
do you need from the customer?
(1/1) Points
Clock board IP address
SP0 IP address
SP1 IP address
Active SP IP address
Domain IP address
Correct !

63. During the initial installation of the M7 server, you notice that the SP NET MGT interface is
not available. Which option represents a possible reason for this?
(1/1) Points
The SPARC M7 does not use the SP NET MGT interface.
The network does not use DHCP.
Oracle ILOM is down.
It must be connected to a Gigabit network.
Correct !

64. You need to set auto-boot? To false for the test domain that you just created. Which
command do you run?
(1/1) Points
ldm set-var auto-boot=true test
ldm set-var auto-boot\?=true test
ldm set-auto-boot\?=true test
ldm set auto-boot\?=true test
Correct !

65. The customer has finished running their tests on the test domain and would like you to
remove it. What command do you run to do that?
(0/1) Points
ldm remove-ldom test
ldm remove-domain test
ldm rm-domain test
ldm rm-ldom test
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

66. You have powered-on HOST3 and want to verify its current status. Which two commands
would give you that output?
(0/1) Points
show /Servers/Pdomains/Pdomain_3/HOST status_detail
show /Servers/Pdomains/Pdomain_3/HOST status
show status /Servers/Pdomains/Pdomain_3/HOST
show /Servers/Pdomains/Pdomain_1/HOST status
Incorrect. Please refer back to the lesson “SPARC M7 Systems Product Overview".

67. Before you can perform a firmware upgrade, you must first check the keyswitch property for
each host. What must it be set to for the firmware upgrade to work?
(1/1) Points
Diag
Locked
Unlocked
Open
Normal
Correct !

SPARC M8 vs M7 Server Differences Assessment

This assessment tests the participant's knowledge of the content in the SPARC M8 vs M7 Server Differences
knowledge requirement.
(Answer all questions in this section)
68. Which IO Controller root port is used on the M8 CMIOU, but was left not-connected
(unused) on the M7 CMIOU?
(1/1) Points
1
3
2
4
Correct !

69. What is the minimum ILOM major release supporting M8?


(1/1) Points
ILOM 5.x
ILOM 3.x
ILOM 9.8
ILOM 4.x
Correct !

70. The “ip-transport.interconnect-down” and “ip-transport.link-down” alerts are reporting a


problem on _________.
(1/1) Points
The indicted network interface
The connection between the NIC and the network switch
The EoUSB interconnect path supporting the FMA Fault Proxying mechanism
The PCIe switch on the CMIOU
Correct !

71. What is the connection between the CMIOU, SP and eUSB disk?
(1/1) Points
Sharing the root port 4 of the IO controller
Using respectively root ports 3 and 1 of the IO controller
Using respectively root ports 4 and 2 of the IO controller
Sharing the root port 2 of the IO controller
Correct !

72. What components have been modified for M8 servers as compared to those used in M7
servers?
(0/1) Points
Service Processor, Power Supply
CMIOU, Service Processor
CMIOU, Power Supply
CMIOU, Service Processor, Power Supply
Incorrect. Please review all the SPARC M8 vs M7 courses and try again.

73. What are the configuration rules for Power Supplies A261 and A265?
(0/1) Points
A261 and A265 cannot be mixed but A265 from Belpower and Delta can be mixed with no error

A261 and A265 can be mixed in a platform


A261 and A265 cannot be mixed and A265 from Belpower and Delta should not be mixed.
Incorrect. Please review all the SPARC M8 vs M7 courses and try again.

74. What happens when an unsupported CMIOU configuration is detected?


(1/1) Points
Starting the respective host will fail. No impact on any running host. An alert is generated.
Starting the respective host will succeed. No impact on any running host. An alert is generated.

Starting the respective host will fail. Any running host will be gracefully stopped. An alert is
generated.
Correct !

75. What happens if Power Supplies A261 and A265 are mixed in a platform?
(1/1) Points
The running hosts will not be impacted and it's possible to restart the hosts with non-dominant
PS faulted.
The running hosts will be stopped but it's then possible to restart the hosts with non-dominant PS
faulted.
The running hosts will be stopped and it's not possible to restart any host.
The system is run as expected without any impact.
Correct !

76. On which platforms can M7 and M8 CMIOUs be mixed?


(0/1) Points
M7-8 with 2 Pdoms using M7 Service Processor and M8 CMIOUs in DCU#1
M7-8 with 2 Pdoms using M7 Service Processor, M7 and M8 CMIOUs in the same DCU
M7-8 platform using M7 Service Processor
M7-8 and M7-16 platform using M7 Service Processor
Incorrect. Please review all the SPARC M8 vs M7 courses and try again.

77. Mixing an M7 SP and an M8 SP in the same chassis is supported.


(1/1) Points
True
False
Correct !

EIS Installation Best Practices Online Assessment

This assessment tests the participant's knowledge of accessing and using EIS methodology.

(Answer all questions in this section)


78. What are three factors that influence how long a system (server, storage, engineered system)
will require to be acclimatized after delivery to a customer, before power can be applied without
causing damage?
(1/1) Points
temperature
cleanliness
humidity
timezone
data center space
Correct!

79. What are two cautions that should be acknowledged when acclimatizing a system?
(1/1) Points
Avoid unpacking items inside the computer centre (dust/dirt contaminating filters etc.)
Powering ON the system will speed the acclimatization process as the heat from the system will
accelerate its warming
Once powered on the temperature is no longer an issue, as internal cooling systems commence

The maximum positive or negative temperature gradient that is permitted for multi-layer boards
is approximately 2° C (4° F) per hour.
Correct!

80. What are Oracle Standard System Installations (OSSI)?


(1/1) Points
Installation Services sold by Oracle Advanced Customer Support
Field Delivery Support Services offered through certified partners
Advanced professional services offered by IBM Global Services
Installation Services sold by 3rd party service providers
Correct!

81. What are the two primary objectives for the Installation Configuration Planning step of the
EIS methodology?
(1/1) Points
Oracle/Partner and Customer will determine and mutually agree upon the hardware and software
installation requirements which will be documented in the Installation and Configuration Plan

Tests that will be performed during the Systems Testing will be defined.
Oracle/Partner confirms power and cooling requirements for system installation
Customer provides walk-through of installation site
Correct!

82. What is the primary goal of the Installation and Configuration of Oracle Hardware and
Software step in the EIS methodology?
(1/1) Points
System acclimatization, installation, and basic configuration
Hardware cabling , wiring and Power ON
Troubleshooting software configuration issues
Managing transition from Installation phase to Field Service issue recording
Correct!

83. What is the primary purpose of the”Basic Solaris” standard?


(1/1) Points
Specifically describes how to install Solaris on non-SPARC hardware
Describes how to install legacy versions of Solaris on systems that need to support backward
compatible applications
Defines a method for achieving a consistent installation for Oracle Servers with Solaris OS
Differentiates between Linux and Solaris installation processes on dual-boot systems
Correct!

84. What are three types of configuration information typically documented in an Installation
Configuration Plan?
(1/1) Points
System documentation and guidelines
General and Management Network Configuration
IO cards and controllers
Power cord specifications
System host names
Boot Disk Layout
Correct!

85. What three typical activities are done during the Project Initiation phase of the EIS
Methodology?
(1/1) Points
Details about the customer are determined and documented
The EIS Site-Audit is scheduled
Details about the project are identified and documented, for example, is this a single system
installation or a complex, multi-product installation
System configuration details are documented.
System delivery occurs, and the project commences
Correct!

86. What should you do if you believe you have found an error in an EIS checklist?
(1/1) Points
Email Larry Ellison and recommend changes
Follow the feedback method on the last page of every checklist: email SUPPORT-PARTNER-
QUESTIONS_WW_GRP@oracle.com
Submit your concerns to My Oracle Support
Assume that the EIS team is already aware and the next version of the checklist will be updated

Correct!

87. Which three statements are true about EIS?


(1/1) Points
EIS evolved from the field, is sustained by those closely involved with the field, and is intended
to assist the field
EIS is a methodology designed to address issues before, during and after the actual hands-on
installation of Oracle systems
EIS stands for “Enterprise Installation Standards”
EIS stands for “Enterprise information Standards”
EIS is a quick and dirty process for expediting Oracle system installations
Correct!

88. What three documents are typically used as part of the EIS Planning and Preparation stage in
the installation process?
(1/1) Points
Operational Hand-off Form
Installation and Configuration Plan
Acclimatization Report
Project Schedule
Site Audit Report
Test Procedures Plan
Correct!

89. Which three responses are true regarding EISdoc v4?


(1/1) Points
Is accessible to customers and end-users of Oracle hardware and software
Is a free guide to configuring Oracle software
Contains documents matched to the steps in the EIS Methodology
Is available on the partner Enterprise Installations Standards web page and on the EIS-DVD
Is an OpenOffice-based set of documentation that includes planning for installations of Oracle
equipment and some software
Correct!

90. What is the primary purpose of the EIS-DVD?


(1/1) Points
The EIS-DVD is used for on-the-job tutorials on how to install Oracle servers and storage
The EIS-DVD is an annually released product which support all hardware installations, and
documents all bugs and issues that have been logged during the prior year
The EIS-DVD is a tool that is provided to installation partners as a give-away to customers
The EIS-DVD is to help installers of Oracle/Sun products perform consistent installations in an
efficient manner.
Correct!

91. What is the purpose for the Operational Handover step in the EIS Methodology?
(1/1) Points
Perform system testing and diagnostics
Documents the installation and configuration of Customer's system(s)
Used to negate responsibility for any ongoing System issues
Documents how to use the EIS documentation and standards
Correct!
92. What four tasks are typically happening at the EIS Planning and Preparation stage in the
installation process?
(1/1) Points
Identify Installation team – Oracle Installation Coordinator, Project Manager, Customer Point of
Contact, others as needed
Notification of Customer Installation project
Unpack and power ON systems
Begin work on Project Schedule
Compile EIS planning documents
Cable and install systems into custom rack
Correct!

93. What is the main purpose of the EIS methodology?


(1/1) Points
To enable customers to install and service Oracle hardware and software.
To use best practices to support standard field delivery and break/fix services by partners.
To provide a foundational methodology for front line support triage by Help Desk providers.

To use best practices, standards, methodologies and continuous process improvement to ensure
consistent, efficient, supportable and high quality product installations globally
Correct!

94. Which four objectives are primary goals for an EIS Site Audit?
(0/1) Points
Determine the availability of required electrical power to run and maintain the System
Determine installation needs for the System, including such assessments as: the suitability of
access routes to the installation location, such as doors, elevators, floor strengths and ramps
Determine the environmental conditions at Customer's site including temperature, humidity,
cleanliness and such other assessments as are determined to be necessary in Oracle's sole
discretion
Determine how many logical domains need to be configured on the system
Determine how frequently system backups will be completed
Determine the floor weight load capacity at the location where the System will be installed
Incorrect! Please review the "Using the EIS Methodology" course and try again.

95. What is found on the EIS-DVD? Select all the apply.


(0/1) Points
Tools to help verify the quality of the installation (e.g. ORAS/CLI)
Selected Oracle/Sun Software
A complete set all configuration files for every Oracle server, storage system and Engineered
system
Sales and presales technical training on Oracle systems
Scripts that assist during the installation
Incorrect! Please review the "Using the EIS Methodology" course and try again.

96. Assuming a SPARC T5 Server installation on which you install Solaris 11, what EIS
documentation, at a minimum, is it recommended that you bring to support you in the installation
project?
(1/1) Points
EIS Installation Checklist for Sun Datacenter InfiniBand Switch 36
EIS Installation Checklist for Solaris 11 OS
EIS Installation Checklist for Common Array Manager
EIS Installation Checklist for SPARC T5
Correct!

97. Which Oracle products are covered by EIS Checklists – select all that apply.
(1/1) Points
Servers
Engineered Systems
Storage
OS and Cluster-related Software
ERP applications
Switches
Oracle Fusion Middleware
Correct!

98. Name three of the problems that EIS was created to overcome?
(0/1) Points
Poor communication/use of Best Practices
Inconsistent installations: Customers buying identical servers for two locations were dismayed to
find different patch levels, firmware versions etc.
Standards for delivery of replacement parts for Oracle hardware
Oracle hardware shipping best practices for on-time delivery
Lack of formal agreement with customers as to outcome of an installation
Incorrect! Please review the "Using the EIS Methodology" course and try again.

99. When should you review deliverables and why?


(1/1) Points
Ideally EIS deliverables would be reviewed at the very start of an installation project, as they
clearly define scope, roles and responsibilities, and project deliverables
EIS deliverables are used as a last step in the installation process to ensure the installer provided
everything that is required
EIS deliverables are included in the Oracle system shipping and packaging documents near the
start of an installation
EIS deliverables are an interim checklist to ensure that at the mid-way point of an installation the
project remains on track.
Correct!

100. Which two EIS documents are most useful during the Installation and Configuration of
Oracle Hardware and Software step?
(1/1) Points
DVD
Installation Configuration Plan
Site-Audit Report
Operational Handover Agreement
EIS Checklist
Correct!

101. Why are EIS deliverables relevant for Partner installations too?
(1/1) Points
EIS deliverables describe the amount of time, materials and deliverables are in scope for a
standard installation
When partners use the EIS deliverables and submit documentation to that effect, their customer
gets a 25% discount on support
EIS deliverables provide flexibility when customers want to make ad-hoc configuration changes

Advanced Customer Services mandates that Partners use the EIS methodology for installations

Correct!

102. Why it is important to do Installation planning, rather than just asking the customer as you
work through the installation process? (Select three)
(0/1) Points
Customer technical contact may not be readily available
Pricing for Installation Services is less expensive if planning in not included
Planning leads to more thoughtful consideration for a predictable outcome of the installation
process
Continuing interruptions can detract from the professionalism of your work, and lead to customer
dissatisfaction
Support Services will not engage on services requests if no installation planning was done
Incorrect! Please review the "Using the EIS Methodology" course and try again.

103. What are two activities that take place during the System Test step of the EIS methodology?
(1/1) Points
On Solaris-based systems, Oracle's Explorer Data Collector will be run and the results evaluated
with ORAS/CLI from the EIS-DVD
Electrical grounding and environmental assessment
Application installation, configuration, and testing
Tests specified in the Test Procedures Plan Plan will be carried performed
Correct!

104. Why should you use the EIS methodology to guide your installation process?
(1/1) Points
The EIS methodology provides a 20% discount on Support Services if you install your
customers’ hardware or software using it
Using the proven EIS methodology will provide step-by-step installation guidelines, help
guarantee a quality installation, make your life easier, and ensure customer satisfaction
Larry Ellison has mandated using EIS
Installation processes are very lengthy, the EIS methodology is quick and dirty
Correct!

105. What are the four key points covered in each test topic of the Test Procedures Plan?
(1/1) Points
Conclusion
Prerequisites
Outcome
Method
Objective
Test Result
Correct!

106. What two activities are accomplished during Installation Task Planning step in the EIS
Methodology?
(1/1) Points
Organization of the team who will actively work the Installation
Review the timeframe options for delivery of the service
System unpacking and acclimatization
Communicate schedule for installation to the customer
Networking and system component cabling
Correct!

107. What is the mission statement for use of the Enterprise Installation Standards?
(1/1) Points
To manage communication and resolution of Services Requests in a timely and customer-
friendly manner
To drive consistent best practices for Oracle Services field delivery
To use a methodology for support service that is from the field, created by the field for the Field.

To drive the ongoing development and usage of Enterprise Installation Standards (EIS), resulting
in consistent, high quality, and cost effective installations that speed time to deployment and
provide the foundation for enhanced stability and performance.
Correct!

108. Which four documents are included as part of the Operational Handover?
(1/1) Points
Installation and Configuration Plan
Site Audit Report
Test Procedures Plan
System Documentation
EIS Checklist for the System installed
MOS Internal Documentation
Correct!

109. Who is involved in the Project Initiation phase?


(1/1) Points
Partner point of contact
Oracle Installation Coordinator or Project Manager (if applicable)
3rd party Service Provider
Oracle Financing contact
Customer point of contact
Correct!
110. What are three items in the EIS Site-Audit Report are documented for all Oracle hardware?
(1/1) Points
Access Route requirements
Operating Environment and Cooling requirements
Facility Power requirements
IP Address requirements
Operating System requirements
Correct!

111. Name two functions for the EIS-DVD during the Installation and Configuration of Oracle
Hardware and Software step in the EIS methodology?
(1/1) Points
Used as a back-up for complete documentation sets that are on http://docs.oracle.com
Provides an excellent tool as a leave behind utility for customers
Provides installation assessment and diagnostic tools
Contains required patches and firmware for most installations
Correct!

112. Why should you typically complete the Installation Configuration Plan and create your Test
Procedures Plan at the same time?
(1/1) Points
You should create the Test Procedures Plan after you have completed the system installation and
configuration.
As you work through the system configuration process with your customer, you should state how
you will test key items in the system’s configuration for having been successfully completed.

Test Procedures plan is a standard document used in all generic system installations.
Correct!

113. What do EIS deliverables define?


(1/1) Points
EIS deliverables are the Customer Support Identifiers that customers use for field delivery
service after an installation has completed
EIS deliverables are the documents that are left behind with customers after an installation
service is performed
EIS deliverables give a high level description of the scope of the EIS activities for each product
or product family
EIS deliverables describe detailed process steps for each phase of the installation service
Correct!

114. What are two statements that are true about EIS checklists?
(1/1) Points
Checklists are intended as guidelines for properly trained installers and are NOT a substitute for
appropriate product training.
Checklists are a valuable tool to share with customers so they know how to install systems
themselves
EIS installation checklists are intended to guide the installer through the installation in a logical
and consistent manner
Checklists are publicly available on oracle.com
Correct!

115. Why is the rate of temperature change when acclimatizing systems such an important factor
as described in the EIS methodology?
(1/1) Points
Systems should be warmed up and powered ON as quickly as possible to optimize the
installation project timeline
It is actually not relevant or important
Variations in temperature do not have as big an impact as do Service contract considerations for
how long an installation will take
Variations in temperature should not exceed the approved gradient of approximately 2° C (4° F)
per hour, because ignoring this may could lead to long-term damage (hair-cracks) on the boards

Correct!

116. According to the EIS methodology, when issues are uncovered during the Site-Audit, who
should be notified?
(1/1) Points
Oracle Premier Support
Customer point of contact
Oracle sales management
Installation coordinator if applicable
Correct!

117. What should you do with the EIS checklist when an installation project is complete?
(1/1) Points
Crumple the checklist and throw it in the customer wastepaper bin
Post the EIS checklist and Test Procedures Plan to My Oracle Support under your customer’s
account
Leave the EIS checklist with the customer so that they can re-install when they need to
Remove the EIS checklist and other confidential Oracle Intellectual Property from the customer
datacenter
Correct!

118. You are assigned to an installation project in France in February to install 5 new SPARC T5
servers. The servers, in their original packaging, are sitting in the customer’s loading dock with a
temperature of 8 degrees C (46 degrees F). The customer’s data center is 20 degrees C (68
degrees F). What is the recommended next step in acclimating these systems?
(0/1) Points
Move the systems (still packed) into a room with a similar environment to the data center
Move the systems (still packed) into the data center
Unpack the servers and store in the data center
Unpack the servers and store in the loading dock
Incorrect! Please review the "Using the EIS Methodology" course and try again.

119. If the customer has asked for some customization of their installation, how is testing for that
accomplished? Choose all responses that apply.
(0/1) Points
Additional tests can be inserted into the Test Procedures plan
Testing above and beyond the Covered System Tests are at the sole discretion of Oracle and/or
the Partner installer
Oracle is automatically responsible for any non-standard installation procedure, regardless of
whether they were agree to as part of the Installation and Configuration Plan
Not all installation actions need testing
Incorrect! Please review the "Using the EIS Methodology" course and try again.

120. What tasks occur during the operational handover phase of the EIS methodology?
(1/1) Points
Document the serial number for the system(s) installed, as well as any comments pertaining to
the installation
Collate the EISdocV4 documents pertaining to this customer installation, and product
documentation for handover
Obtain customer signatures to successful close project
Provide the customer the 20% installation service rebate that is required after a successful
installation
Correct!
121. For safety awareness with respect to grounding, if a system has been modified after the
manufacturer's assembly process, what three recommendations does the EIS Grounding Standard
make?
(1/1) Points
If the temperature is below 60 degrees F., warm the room first before power ON
If modifications involved any power supplies, distribution units or wiring, did qualified
personnel verify that the modification was was correct and did they test the system to ensure that
it doesn't pose any safety hazard?
If qualified personnel did not test the safety of the modified system then proper testing should be
requested before Oracle and/or partner personnel will work on the equipment
Determine whether the local electrician can support the installation process
Check whether the modification involved any power supplies, distribution units or wiring?
Correct!

122. Why do the EIS Standards recommend that external cables between Oracle hardware, such
as servers, storage devices, network devices and ports be clearly labeled?
(1/1) Points
Cable routing should be done with rubber bands for ease of reconfiguration
For ease of maintenance it should be unambiguously clear from the label on each cable, where
the cable has to be attached
Labeling is not an EIS best practice
Service requests for field diagnostics will not be accepted unless cables are labeled
Correct!

123. What if the customer has their own labeling methodology that differs from the
recommended one from EIS?
(1/1) Points
Follow the customer's standard for cable labeling provided it meets with EIS requirements for
identification and port location.
Ignore the customer’s standard and use the EIS standard
Redo cabling throughout the datacenter to meet the EIS standard
Submit a Service Request for Oracle approval on use of the customer labeling and routing
methods
Correct!

124. When should the Site-Audit be performed?


(1/1) Points
As soon as the product has been delivered to the customer
After the system has been acclimatized and is ready for unpacking at the customer site
As soon as possible, and certainly prior to delivery of the system
Prior to the completion of the sale, in order to ensure that the customer’s location is viable
Correct!

125. What should partners do before first using ESISdocV4? (Select two)
(1/1) Points
Review the Openoffice presentation on EISdoc V4 found on the EIS Planning & Documentation
web page
Review Oracle product overview documentation
Submit their EIS Test Procedure Plan outcomes
Review the “EISdoc V4 Getting Started Cookbook” and “Success with EISdoc V4 Cookbook”

Correct!

You might also like