Outage Data Returns DPH Slapper
Planned Outage Forced Outage
From To Duration From To Durati
Mcs. Reason of Planned Mcs on Reason of Forced
No. Hrs: Hrs:M Hrs : Outage No. Hrs: Date Hrs: Date Hrs: Outage
Date Date
Min in Min Min Min Min
5 0:00 01/04/18 24:00 30/04/18 720:00 PSD
NIL
6 0:00 01/04/18 24:00 30/04/18 720:00 PSD
Add.SE /Sr.XEN
Op.Divn.DPH.BBMB(P
Endst No.___________________/ Op33 ( T ) Dated. _____ / ___/ 2018 Slapper (HP)
CC
1. EIC/Gen BBMB Nangal.
2.Superintending Engineer DPH BBMB (PW) Slapper.
3.The P.C BBMB Chandigarh
E-mail :- cegen@ bbmb.nic.in
Apr-18
Bhakra Beas Management Board (PW)
Total Outage of Unit
Period of Outage
Outage
From To Duration of Outage Unit No.
Code
Reason of Outage Remarks
Hrs Min Date Hrs Min Date Planned Forced
0.00 4/1/2018 24.00 4/30/2018 720:00 − 5 PSD
0.00 4/1/2018 24.00 4/30/2018 720:00 − 6 PSD
Sr.No. Main Abstract Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total
1 No. of Forced Shut downs 0 0 0 0 0 0 0
2 Hrs. of Forced Shut downs 0:00 0:00 0:00 0:00 0:00 0:00 0:00
3 No. of Planned Shut downs 0 0 0 0 1 1 2
4 Hrs. of Planned Shut downs 0:00 0:00 0:00 0:00 720:00 720:00 1440:00
5 Idle Hrs 583:59 164:14 656:55 503:34 0:00 0:00 1908:42
6 Running Hours 136:01 555:46 63:05 216:26 0:00 0:00 971:18
7 Total Outage 0:00 0:00 0:00 0:00 720:00 720:00 1440:00
8 Availabilty Factor in % age 100.00 100.00 100.00 100.00 0.00 0.00
9 Energy Loss
Endst No.___________________/ Op 33 ( T ) Dated. ____ / ___/ 2018
Copy of the above is forwarded to the following for information please.
Copy To-
1. EIC Gen. BBMB (PW) Nangal.
2. Dy. CE / PR Chandigarh.
3. SE DPH BBMB (PW) Slapper. Add.S.E / Sr. XEN / Operations
4. The P.C BBMB Chandigarh Divn. BBMB (PW), Slapper.
720:00
4320:00
PROFORMA-C
April-18 TECHNICAL DATA RETURNS
DEHAR POWER PLANT:- SLAPPER (HP)
Sr. Unit wise data during the month
Description
No. 1 2 3 4 5 6 Total
1 Total Hours 720:00 720:00 720:00 720:00 720:00 720:00 4320:00
2 Total Running Hrs 136:01 555:46 63:05 216:26 0:00 0:00 971:18
3 Total Available Hrs. 720:00 720:00 720:00 720:00 0:00 0:00 2880:00
4 Planned Outage Hrs. 0:00 0:00 0:00 0:00 720:00 720:00 1440:00
5 Force Outage Hrs. 0:00 0:00 0:00 0:00 0:00 0:00 0:00
6 Total Outage Hrs. 0:00 0:00 0:00 0:00 720:00 720:00 1440:00
7 Present Installed Capacity in MW 165 165 165 165 165 165 990
8 Target (in LU) 224
9 Actual Generation in units 22281220 92098380 10171000 35746000 0 0 160296600
10 Plant Utilization factor in % 100.00
11 Plant Availability factor in % 66.67
12 Plant Load factor in % age 22.49
13 Max. Demand in MW 660 MW 18:28 Hrs Dated- 25.04.18
CC :-
1.The C/E Gen. Nangal.
2.The S/E DPH Slapper.
3.The P.C BBMB Chandigarh Add.SE /Sr.XEN
Op.Divn.DPH.BBMB(PW)
E-mail :- cegen@ bbmb.nic.in Slapper (HP)
66.67
April-18
TRANSMISSION LINES OUTAGE DATA RETURNS
DEHAR POWER PLANT:- SLAPPER (HP)
Sr. Outage Hrs Min & with date Duration
Transmission Lines Reasons / Preventive measures for outage
No. From To Hrs:Min
1 220 KV Dehar Gwl - II 12/04/18 7:51 12/04/18 18:41 10:50 Half yearly mtc. carried out.
1 2 3 4 5 6 7 8 9 10 11
400 KV
1 Dehar- NIL NIL NIL NIL NIL NIL NIL NIL NIL
Rajpura
400 KV
2 Dehar- NIL NIL NIL NIL NIL NIL NIL NIL NIL
Panchkula
Time
Time considere Element
Name of the Deemed Ckt. Weightage considere d for non (Ti-Tnai) Wi (Ti- Wi (Ti- wise Reason of
Sr. No. Transmission Outage Restoration Duration of Outage Attributable to Availability SIL Km. factor d for availablit Tnai) 16x19 Tnai) / availability Outage
element % (Wi) 14x16 availablit y (Tnai) 17-18 Ti 20/17 % 21/16
y (Ti) hrs Hrs
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
System Constraint /
Date Time Date Time Utility Itself Others Natural
DD/MM/YY Hrs/Min. DD/MM/YY Hrs/Min. Hrs. Min. Hrs. Min. Hrs. Min.
Sr. no. 24 -
1. Tripping of dated 17/04/18 work done:- Moisture observed in Y-phase PRD which has been replaced with spair PRD.
2. Tripping of dated 28/04/18 work done:-Spair phase of ICT PRV problem recified by adding sealant PRV cable gland and top cover
mail id
Endst No.___________________/ Op 33 ( T ) Dated. 01 / 04 / 2018 cets@bbmb.nic.in
1.EIC/Gen.BBMB(PW) Nangal. cegenaeworks@bbmb.nic.in
3. Superintneding Engineer DPH Slapper. drwsecsedph@bbmb.nic.in
3.PC BBMB,Chandigarh. xenwcets@bbmb.nic.in ASE/Senior Executive Engineer /OP
DPH BBMB(PW) Slapper(HP)
AVAILABILITY FACTOR OF TRANSFORMERS OF BBMB AT DEHAR POWER HOUSE SLAPPER Commulative
Tripping
No of No of
trippi trippi
AF ng ng
Name Duration Duration TNA TA WAF
Name of SIL Total durin durin Current Previous
of the
the T/F MW Hrs.
of schdule of forced
(5+6) (4-7) (8/4) (3x9) g g
Remarks
year year
Month station Mtc. outage %
Sr. No. curre previ
/year
nt ous
year year
2
1 3 4 5 6 7 8 9 10 11 12 13 14 15
400/220KV
1 Apr-18 DPH ICT 250 744.00 12.47 0.00 12.47 731.53 98.32 24580 1 4 − − −
40/36/4MVA
2 Apr-18 DPH T/F T-7 40 744.00 16.50 12.47 28.97 715.03 96.11 3844 3 4 − − −
40/36/4MVA
3 Apr-18 DPH T/F T-8 40 744.00 0.00 744.00 744.00 0.00 0.00 0.00 0 1 − − −
WHOLE TRANSMISSION SYSTEM OUTAGE DATA IN RESPECT OF TRANSFORMER OF DEHAR POWER HOUSE, SLAPPER. ANNEXURE-IV
Period:
Period Dec-99 (Element wise Chronological listing)
Sr. No.
Time
Time considere Element
Name of the Deemed Ckt. Weightage considere d for non (Ti-Tnai) Wi (Ti- Wi (Ti- wise Reason of
Transmission Outage Restoration Duration of Outage Attributable to Availability SIL Km. factor d for availablit Tnai) 16x19 Tnai) / availability Outage
element % (Wi) 14x16 availablit y (Tnai) 17-18 Ti 20/17 % 21/16
y (Ti) hrs Hrs
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
System Constraint /
Date Time Date Time Utility Itself Others Natural
DD/MM/YY Hrs/Min. DD/MM/YY Hrs/Min. Hrs. Min. Hrs. Min. Hrs. Min.
1 4/17/2018 12:08 4/17/2018 18:50 6 42
ICT 400/220
KV 28/04/18 16:36 29/04/18 17:20 24 44 99.85% 315 1 315 744 8:32 735:28 231613 314.53 99.85% Tripped
Transformer
T-7 40/36/4 100.00% 40 1 40 744 744 40 100.00%
MVA
Transformer
T-8 40/40/13 100.00% 40 1 40 744 744 40 100.00%
MVA
Apr-18 Caloulations of Energy Generated
Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Transmission
Diffrence
124342528442 121552914299
MF/CF 1200 1200 1000 1000 1000 1000
Units Generated
Total
00.00 Hrs 01.12.09 141179.30 125929.31 118391.23 100560.01 82747.29 89861.53 828553:34
Diffrence