Jun-09 Generation Data in Respect of DPH BBMB Slapper Part-1

Units Generated Total Total Running Hours (HH:MM) Total


Date Genaration Transmission Date
1 2 3 4 5 6 1 2 3 4 5 6 RH 1
1 0 0 10489608 24:00 24:00 24:00 24:00 24:00 24:00 144:00 1 0.00
2 0 0 10578888 0:00 2 0.00
3 0 0 13287348 0:00 3 0.00
4 510600 510600 15057312 0:00 4 12.89
5 3894000 3894000 15403320 0:00 5 98.33
6 3706800 3706800 14768100 0:00 6 93.61
7 3820800 3820800 14970924 0:00 7 96.48
8 2326080 2326080 11882160 0:00 8 58.74
9 633180 633180 9772704 0:00 9 15.99
10 0 0 10641312 0:00 10 0.00
11 749820 749820 11939508 0:00 11 18.93
12 1977820 1977820 11210688 0:00 12 49.94
13 3573600 3573600 11394516 0:00 13 90.24
14 2317780 2317780 9811752 0:00 14 58.53
15 1526040 1526040 9826764 0:00 15 38.54
16 1656840 1656840 8864412 0:00 16 41.84
17 2147140 2147140 9722028 0:00 17 54.22
18 3820800 3820800 9250296 0:00 18 96.48
19 1155840 1155840 8675328 0:00 19 29.19
20 583920 583920 9107400 0:00 20 14.75
21 961160 961160 9706380 0:00 21 24.27
22 2214440 2214440 13821480 0:00 22 55.92
23 3728400 3728400 0:00 23 94.15
24 0 0:00 24 0.00
25 0 0:00 25 0.00
26 0 0:00 26 0.00
27 0 0:00 27 0.00
28 0 0:00 28 0.00
29 0 0:00 29 0.00
30 0 0:00 30 0.00
31 0 0:00 31 0.00
Total 41305060 0 0 0 0 0 41305060 250182228 24:00 24:00 24:00 24:00 24:00 24:00 144:00
Caloulations of Energy Generated Endst No.______
Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Transmission Running Hours Copy To-
R/on dt 30.6.09 at 24.00 Hrs 1. CE Gen. BBM
96191019012 94039865315
R / on dt 1.6.09 At 00.00 Hrs 26722 80797 4616 40245 76746 75314 2. SE DPH BBMB
Diffrence 3. SE / Regulat
MF/CF 1200 1200 1000 1000 1000 1000
96149713952 93789683087 645295.52
Units Generated 0 0
41305060 250182228 144:00
Aux Cons(#1&2)
0 0 0 0 0 0
Generation Data in Respect of DPH BBMB Slapper Part-1
Load Factor (%) Avalablitty Factor Maximum Demand (MW)
2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

_____________ / Op38 ( T ) Dated_________ / 2009

. BBMB (PW) Nangal.


BBMB (PW) Slapper.
egulation BBMB (PW) SNR. Sr. XEN / Operations
BBMB(PW), Slapper.
Apr-18 Generation Data in Respect of DPH BBMB Slapper Part-1
Units Generated TOTAL TOTAL Running Hours (HH:MM) Total
Date Gen. Trans.
1 2 3 4 5 6 1 2 3 4 5 6 RH
1 489000 1839420 223000 528000 0 0 3079420 3135684 3:02 11:08 1:25 3:16 0:00 0:00 18:51
2 503420 3004820 1150000 0 0 0 4658240 4680824 3:03 18:06 7:02 0:00 0:00 0:00 28:11
3 653620 2486980 1027000 1120000 0 0 5287600 5306436 4:05 14:57 6:25 6:48 0:00 0:00 32:15
4 511820 3161020 0 786000 0 0 4458840 4512828 3:07 19:03 0:00 4:49 0:00 0:00 26:59
5 498600 3362840 0 914000 0 0 4775440 4797864 3:03 20:12 0:00 5:35 0:00 0:00 28:50
6 502200 3147820 0 769000 0 0 4419020 4462836 3:02 19:05 0:00 4:47 0:00 0:00 26:54
7 0 3161020 466000 632000 0 0 4259020 4291824 0:00 19:05 2:55 3:48 0:00 0:00 25:48
8 589920 2444940 0 553000 0 0 3587860 3634332 3:36 14:42 0:00 3:21 0:00 0:00 21:39
9 392880 2760920 386000 588000 0 0 4127800 4161864 2:23 16:38 2:23 3:33 0:00 0:00 24:57
10 748520 3323220 0 982000 0 0 5053740 5075960 4:34 20:04 0:00 5:55 0:00 0:00 30:33
11 515420 3344620 0 882000 0 0 4742040 4765956 3:07 19:05 0:00 5:22 0:00 0:00 27:34
12 1291580 2521840 0 2464000 0 0 6277420 6268740 7:55 15:12 0:00 15:00 0:00 0:00 38:07
13 559900 3336400 0 952000 0 0 4848300 4882572 3:27 20:03 0:00 5:48 0:00 0:00 29:18
14 629580 3342420 539000 2000 0 0 4513000 4552452 3:51 20:05 3:20 0:01 0:00 0:00 27:17
15 497400 3156220 250000 0 0 0 3903620 3954000 3:01 19:04 1:32 0:00 0:00 0:00 23:37
16 552660 3167020 429000 0 0 0 4148680 4211616 3:20 19:05 2:36 0:00 0:00 0:00 25:01
17 659600 2118140 797000 0 0 0 3574740 3608220 4:01 12:43 4:53 0:00 0:00 0:00 21:37
18 922720 2102540 686000 0 0 0 3711260 3765084 5:33 12:42 4:16 0:00 0:00 0:00 22:31
19 922720 2432940 61000 554000 0 0 3970660 4034748 5:36 14:41 0:23 3:21 0:00 0:00 24:01
20 1083720 2089320 0 744000 0 0 3917040 3968196 6:34 12:36 0:00 4:31 0:00 0:00 23:41
21 1137760 3483000 0 2490000 0 0 7110760 7113132 6:50 20:56 0:00 15:03 0:00 0:00 42:49
22 2630000 1469400 0 1284000 0 0 5383400 5424528 15:59 8:57 0:00 5:48 0:00 0:00 30:44
23 1005640 3972000 0 1273000 0 0 6250640 6289248 6:10 24:00 0:00 7:49 0:00 0:00 37:59
24 3600 3969600 866000 1116000 0 0 5955200 5991828 0:01 24:00 5:25 6:46 0:00 0:00 36:12
25 884260 3945600 492000 2930000 0 0 8251860 8258160 5:21 24:00 3:04 18:00 0:00 0:00 50:25
26 950360 3984000 504000 2966000 0 0 8404360 8379984 5:48 24:00 3:07 18:03 0:00 0:00 50:58
27 871160 3831600 305000 3838000 0 0 8845760 8825052 5:46 24:00 1:52 24:00 0:00 0:00 55:38
28 368860 3186320 912000 2967000 0 0 7434180 7413360 2:17 19:37 5:47 18:04 0:00 0:00 45:45
29 949140 3992400 570000 2070000 0 0 7581540 7561944 5:43 24:00 3:34 12:37 0:00 0:00 45:54
30 955160 3960000 508000 2342000 0 0 7765160 7706892 5:46 24:00 3:06 14:21 0:00 0:00 47:13
Total 22281220 92098380 10171000 35746000 0 0 160296600 161036556 136:01 555:46 63:05 216:26 0:00 0:00 971:18
Caloulations of Energy Generated
Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Transmission Running Hours
R/on dt 31.12.09 at 24.00 Hrs 101285 167680 61783 110549 70681 76630
R/on dt 01.12.09 At 00.00 Hrs 82740 91024 51612 74803 70681 76630
124502825042 121713950855 829524:52
Diffrence 18545 76656 10171 35746 0 0
MF/CF 1200 1200 1000 1000 1000 1000
124342528442 121552914299 828553:34
Units Generated 22254000 91987200
Aux Cons(#1&2) 27220 111180
160296600 161036556 971:18
22281220 92098380 10171000 35746000 0 0 160296600
Apr-18 Generation Data in Respect of DPH BBMB Slapper Part-1
Load Factor (%) Avalablitty Factor Maximum Demand (MW)
Date
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
1 12.35 46.45 5.63 13.33 0.00 0.00 100 100 100 100 0 0 165 165 165 165 0 0
2 12.71 75.88 29.04 0.00 0.00 0.00 100 100 100 100 0 0 165 165 165 0 0 0
3 16.51 62.80 25.93 28.28 0.00 0.00 100 100 100 100 0 0 165 165 165 165 0 0
4 12.92 79.82 0.00 19.85 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
5 12.59 84.92 0.00 23.08 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
6 12.68 79.49 0.00 19.42 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
7 0.00 79.82 11.77 15.96 0.00 0.00 100 100 100 100 0 0 0 165 165 165 0 0
8 14.90 61.74 0.00 13.96 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
9 9.92 69.72 9.75 14.85 0.00 0.00 100 100 100 100 0 0 165 165 165 165 0 0
10 18.90 83.92 0.00 24.80 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
11 13.02 84.46 0.00 22.27 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
12 32.62 63.68 0.00 62.22 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
13 14.14 84.25 0.00 24.04 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
14 15.90 84.40 13.61 0.05 0.00 0.00 100 100 100 100 0 0 165 165 165 0 0 0
15 12.56 79.70 6.31 0.00 0.00 0.00 100 100 100 100 0 0 165 165 165 0 0 0
16 13.96 79.98 10.83 0.00 0.00 0.00 100 100 100 100 0 0 165 165 165 0 0 0
17 16.66 53.49 5.63 0.00 0.00 0.00 100 100 100 100 0 0 165 165 165 0 0 0
18 23.30 53.09 29.04 0.00 0.00 0.00 100 100 100 100 0 0 165 165 165 0 0 0
19 23.30 61.44 25.93 13.99 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
20 27.37 52.76 0.00 18.79 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
21 28.73 87.95 0.00 62.88 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
22 66.41 37.11 0.00 32.42 0.00 0.00 100 100 100 100 0 0 165 165 0 165 0 0
23 25.39 100.30 11.77 32.15 0.00 0.00 100 100 100 100 0 0 165 165 165 165 0 0
24 0.09 100.24 0.00 28.18 0.00 0.00 100 100 100 100 0 0 0 165 165 165 0 0
25 22.33 99.64 9.75 73.99 0.00 0.00 100 100 100 100 0 0 165 165 165 165 0 0
26 24.00 100.61 0.00 74.90 0.00 0.00 100 100 100 100 0 0 165 165 165 165 0 0
27 22.00 96.76 0.00 96.92 0.00 0.00 100 100 100 100 0 0 165 165 165 165 0 0
28 9.31 80.46 0.00 74.92 0.00 0.00 100 100 100 100 0 0 165 165 165 165 0 0
29 23.97 100.82 0.00 52.27 0.00 0.00 100 100 100 100 0 0 165 165 165 165 0 0
30 24.12 100.00 12.83 59.14 0.00 0.00 100 100 100 100 0 0 165 165 165 165 0 0

Endst No.___________________/ Op38 ( T ) Dated_________ / 2009


Copy To-
1. EIC Gen. BBMB (PW) Nangal.
2. Dy.CE DPH BBMB (PW) Slapper.
3. SE / Regulation BBMB (PW) SNR. Sr. XEN / Operations
BBMB(PW), Slapper.
Apr-18
Transmission Data with SEM in Respect of BBMB (PW) Slapper
Sr. SEM Description Initial Final Diff. M.F. Unit Transmitted
No. No. Reading Reading

1 1616-A 132 KV D-Shimla 6802 52953 46151 480 22152480

2 1609-A 220 KV D-Kangoo 57221 112357 55136 600 33081600

3 1610-A 220 KV D-Gwl-1 30043 55000 24957 2400 59896800

4 1611-A 220 KV D-Gwl-2 43598 68193 24595 2400 59028000

5 1614-A 400 KV D-Rajpura 90442 77273 -13169 3636 -47882484

6 1612-A 400 KV D-Panchkula 22214 31774 9560 3636 34760160

Total Transmission 161036556

Endst No.___________________/ OP 37 ( T ) Dated. 01/05/ 2018


Copy of the above is forwarded to the following for information please.
1.C.E/ Gen BBMB (PW) Nangal.
2.CE / Comm,HVPN Panchkula.
3.Director / Comm,BBMB Chandigarh.
4.Superintending Engineer DPH BBMB (PW) Slapper.
5.SE / Comml,RRVPND Jai Pur .
6.Dy. Director Comm./ BBMB Chandigarh.
7.PC / PSEB Patiala.
8.PC / HVPN Panchkula. Add.S.E / Sr. XEN / Operations
9.PC / HPSEB Shimla (HP) Divn. BBMB (PW), Slapper.
161036556 0

121713950855
121552914299
Apr-18
Outage Data Returns DPH Slapper
Planned Outage Forced Outage
From To Duration From To Durati
Mcs. Reason of Planned Mcs on Reason of Forced
No. Hrs: Hrs:M Hrs : Outage No. Hrs: Date Hrs: Date Hrs: Outage
Date Date
Min in Min Min Min Min
5 0:00 01/04/18 24:00 30/04/18 720:00 PSD
NIL
6 0:00 01/04/18 24:00 30/04/18 720:00 PSD

Add.SE /Sr.XEN
Op.Divn.DPH.BBMB(P
Endst No.___________________/ Op33 ( T ) Dated. _____ / ___/ 2018 Slapper (HP)
CC
1. EIC/Gen BBMB Nangal.
2.Superintending Engineer DPH BBMB (PW) Slapper.
3.The P.C BBMB Chandigarh
E-mail :- cegen@ bbmb.nic.in
Apr-18
Bhakra Beas Management Board (PW)
Total Outage of Unit
Period of Outage
Outage
From To Duration of Outage Unit No.
Code
Reason of Outage Remarks
Hrs Min Date Hrs Min Date Planned Forced
0.00 4/1/2018 24.00 4/30/2018 720:00 − 5 PSD
0.00 4/1/2018 24.00 4/30/2018 720:00 − 6 PSD

Sr.No. Main Abstract Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total
1 No. of Forced Shut downs 0 0 0 0 0 0 0
2 Hrs. of Forced Shut downs 0:00 0:00 0:00 0:00 0:00 0:00 0:00
3 No. of Planned Shut downs 0 0 0 0 1 1 2
4 Hrs. of Planned Shut downs 0:00 0:00 0:00 0:00 720:00 720:00 1440:00
5 Idle Hrs 583:59 164:14 656:55 503:34 0:00 0:00 1908:42
6 Running Hours 136:01 555:46 63:05 216:26 0:00 0:00 971:18
7 Total Outage 0:00 0:00 0:00 0:00 720:00 720:00 1440:00
8 Availabilty Factor in % age 100.00 100.00 100.00 100.00 0.00 0.00
9 Energy Loss
Endst No.___________________/ Op 33 ( T ) Dated. ____ / ___/ 2018
Copy of the above is forwarded to the following for information please.
Copy To-
1. EIC Gen. BBMB (PW) Nangal.
2. Dy. CE / PR Chandigarh.
3. SE DPH BBMB (PW) Slapper. Add.S.E / Sr. XEN / Operations
4. The P.C BBMB Chandigarh Divn. BBMB (PW), Slapper.
720:00

4320:00
PROFORMA-C
April-18 TECHNICAL DATA RETURNS
DEHAR POWER PLANT:- SLAPPER (HP)
Sr. Unit wise data during the month
Description
No. 1 2 3 4 5 6 Total
1 Total Hours 720:00 720:00 720:00 720:00 720:00 720:00 4320:00
2 Total Running Hrs 136:01 555:46 63:05 216:26 0:00 0:00 971:18
3 Total Available Hrs. 720:00 720:00 720:00 720:00 0:00 0:00 2880:00
4 Planned Outage Hrs. 0:00 0:00 0:00 0:00 720:00 720:00 1440:00
5 Force Outage Hrs. 0:00 0:00 0:00 0:00 0:00 0:00 0:00
6 Total Outage Hrs. 0:00 0:00 0:00 0:00 720:00 720:00 1440:00
7 Present Installed Capacity in MW 165 165 165 165 165 165 990
8 Target (in LU) 224
9 Actual Generation in units 22281220 92098380 10171000 35746000 0 0 160296600
10 Plant Utilization factor in % 100.00
11 Plant Availability factor in % 66.67
12 Plant Load factor in % age 22.49
13 Max. Demand in MW 660 MW 18:28 Hrs Dated- 25.04.18

Endst No.___________________/ Op 33 ( T ) Dated. _____ / ____/2018

CC :-
1.The C/E Gen. Nangal.
2.The S/E DPH Slapper.
3.The P.C BBMB Chandigarh Add.SE /Sr.XEN
Op.Divn.DPH.BBMB(PW)
E-mail :- cegen@ bbmb.nic.in Slapper (HP)
66.67
April-18
TRANSMISSION LINES OUTAGE DATA RETURNS
DEHAR POWER PLANT:- SLAPPER (HP)
Sr. Outage Hrs Min & with date Duration
Transmission Lines Reasons / Preventive measures for outage
No. From To Hrs:Min

1 220 KV Dehar Gwl - II 12/04/18 7:51 12/04/18 18:41 10:50 Half yearly mtc. carried out.

Endst No.___________________/ Op 33 ( T ) Dated. _____ /____ / 2018


CC
1. EIC/Gen BBMB Nangal.
2.Superintending Engineer DPH BBMB (PW) Slapper.
3.The P.C BBMB Chandigarh Add.SE /Sr.XEN
4.E-mail :- cegen@ bbmb.nic.in Op.Divn.DPH.BBMB(PW)
Slapper (HP)
Apr-18
Tripping Report of 400 KV Line

Auto Protection Scheme Operated


Sr. Name of Time of Time of Relay Relay Indication At
Date Date Reclosed Facia Main -I,Main-II(i.e.Name of
No. Line Tripping Restore Indication Other End
or Not Scheme)

1 2 3 4 5 6 7 8 9 10 11
400 KV
1 Dehar- NIL NIL NIL NIL NIL NIL NIL NIL NIL
Rajpura

400 KV
2 Dehar- NIL NIL NIL NIL NIL NIL NIL NIL NIL
Panchkula

Endst No.___________________/ Op 33 ( T ) Dated. _____ /___ / 2018


CC :-
1. EIC/Gen BBMB Nangal.
2. P.C. BBMB Chandigarh. Add.S.E/ Sr. XEN / Operations
3. Superintneding Engineer DPH Slapper. Divn. BBMB (PW), Slapper.
Apr-18
WHOLE TRANSMISSION SYSTEM OUTAGE DATA IN RESPECT OF TRANSFORMER OF DEHAR POWER HOUSE, SLAPPER. ANNEXURE-IV
Period:
April-18 (Element wise Chronological listing)

Time
Time considere Element
Name of the Deemed Ckt. Weightage considere d for non (Ti-Tnai) Wi (Ti- Wi (Ti- wise Reason of
Sr. No. Transmission Outage Restoration Duration of Outage Attributable to Availability SIL Km. factor d for availablit Tnai) 16x19 Tnai) / availability Outage
element % (Wi) 14x16 availablit y (Tnai) 17-18 Ti 20/17 % 21/16
y (Ti) hrs Hrs

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
System Constraint /
Date Time Date Time Utility Itself Others Natural
DD/MM/YY Hrs/Min. DD/MM/YY Hrs/Min. Hrs. Min. Hrs. Min. Hrs. Min.

17/04/18 12:08 17/04/18 18:50 6 42 6:42 713:18 Tripped


ICT 400/220
1 KV 96% 315 1 315 720:00 216898:30
28/04/18 16:36 29/04/18 17:20 24 44 24:44 688:34 Tripped

Sr. no. 24 -
1. Tripping of dated 17/04/18 work done:- Moisture observed in Y-phase PRD which has been replaced with spair PRD.

2. Tripping of dated 28/04/18 work done:-Spair phase of ICT PRV problem recified by adding sealant PRV cable gland and top cover

mail id
Endst No.___________________/ Op 33 ( T ) Dated. 01 / 04 / 2018 cets@bbmb.nic.in
1.EIC/Gen.BBMB(PW) Nangal. cegenaeworks@bbmb.nic.in
3. Superintneding Engineer DPH Slapper. drwsecsedph@bbmb.nic.in
3.PC BBMB,Chandigarh. xenwcets@bbmb.nic.in ASE/Senior Executive Engineer /OP
DPH BBMB(PW) Slapper(HP)
AVAILABILITY FACTOR OF TRANSFORMERS OF BBMB AT DEHAR POWER HOUSE SLAPPER Commulative
Tripping
No of No of
trippi trippi
AF ng ng
Name Duration Duration TNA TA WAF
Name of SIL Total durin durin Current Previous
of the
the T/F MW Hrs.
of schdule of forced
(5+6) (4-7) (8/4) (3x9) g g
Remarks
year year
Month station Mtc. outage %
Sr. No. curre previ
/year
nt ous
year year

2
1 3 4 5 6 7 8 9 10 11 12 13 14 15

400/220KV
1 Apr-18 DPH ICT 250 744.00 12.47 0.00 12.47 731.53 98.32 24580 1 4 − − −

40/36/4MVA
2 Apr-18 DPH T/F T-7 40 744.00 16.50 12.47 28.97 715.03 96.11 3844 3 4 − − −

40/36/4MVA
3 Apr-18 DPH T/F T-8 40 744.00 0.00 744.00 744.00 0.00 0.00 0.00 0 1 − − −

Note : Hours are in decimals


Endst No.___________________/ OP 33 ( T ) Dated__________ / 2009
CC
1. EIC Gen BBMB (PW) Nangal
2. Dy. CE DPH Slapper.
Sr. XEN / Operations
BBMB(PW), Slapper (HP)

E-mail :- cegen@ bbmb.nic.in

WHOLE TRANSMISSION SYSTEM OUTAGE DATA IN RESPECT OF TRANSFORMER OF DEHAR POWER HOUSE, SLAPPER. ANNEXURE-IV
Period:
Period Dec-99 (Element wise Chronological listing)
Sr. No.

Time
Time considere Element
Name of the Deemed Ckt. Weightage considere d for non (Ti-Tnai) Wi (Ti- Wi (Ti- wise Reason of
Transmission Outage Restoration Duration of Outage Attributable to Availability SIL Km. factor d for availablit Tnai) 16x19 Tnai) / availability Outage
element % (Wi) 14x16 availablit y (Tnai) 17-18 Ti 20/17 % 21/16
y (Ti) hrs Hrs

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
System Constraint /
Date Time Date Time Utility Itself Others Natural
DD/MM/YY Hrs/Min. DD/MM/YY Hrs/Min. Hrs. Min. Hrs. Min. Hrs. Min.
1 4/17/2018 12:08 4/17/2018 18:50 6 42
ICT 400/220
KV 28/04/18 16:36 29/04/18 17:20 24 44 99.85% 315 1 315 744 8:32 735:28 231613 314.53 99.85% Tripped

Transformer
T-7 40/36/4 100.00% 40 1 40 744 744 40 100.00%
MVA
Transformer
T-8 40/40/13 100.00% 40 1 40 744 744 40 100.00%
MVA
Apr-18 Caloulations of Energy Generated
Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Total Gen. Transmission

24.00 Hrs 31.12.09

00.00 Hrs 01.12.09 82740 91024 51612 74803 70681 76630

Diffrence
124342528442 121552914299
MF/CF 1200 1200 1000 1000 1000 1000
Units Generated

Aux Cons ( # 1 & 2)

Total

Running Hours Unit 1 to 6


Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 R / H Total

24.00 Hrs 31.12.09

00.00 Hrs 01.12.09 141179.30 125929.31 118391.23 100560.01 82747.29 89861.53 828553:34

Diffrence