You are on page 1of 2
DAT cannes 18 JUL 2019 Approval Of Materials RECEIVED Date: 17. Jul 2019 Request no: MAT.CSCEC-00-ME-HD-0111-00 | Business District of the New Administrative Capital of Egypt [Contractor BF RT LS Drawing ret Specitcavon tach al “4. Material description (one item only on this form) ‘cea of application; General forall CBD towers (according to the attached materia ist) Metal Duct Raw Material (Sample Atached) 800 ret no 2283113 -METAL DUCT Ret zoott- wera. over Stardards: _ASTMAGS4A SAM 2275 (690) vant echiealHeralue marked io dent relevant descrpion, cent Test Certicates, samples as appropiate 2, Manufacturer /supplior Company Name: Kandi Gaha & Kama) Coating vaatity Adress deur Cy Industrial Zone Area # (6 69.88) ~ Block 13035 Postal Code Cairo ~ Local agent Kandi (Galve & Kama) Coating 3. Delivery: County oferigin: Egypt Signature: © Locally Manufactured O Overseas very {eer ta cebon [_zora0ens 1 {_202ve0 Estimates ie of rival on ate {| z0s908's Pregam Dat teil reaed on se [ zora0ens | Lats dt reer [ amaonwns | lve crit nat the above evi ters have been reviewed in deta and ee corect nd inert conormiy wih he ear Spcstcnlrs exces oernse ae. oso a he mater sores dei aoe hae ee eve eta on ah wa Spy [Sree cnt we stove an dvr sae tre submtedty: Wang dog 1 PuXioFon - sre? AX Pte, “4, Enginoer's Representative comments Tl peso ‘ eroved a ced Reber to Commedts lied Reve ane mutt ell < ve Teen ave Sonera os ere San oh aol Fens eypty ved 18 JUL 2019 CENTRAL BUSINESS DISTRICT - NEW ADMINISTRATIVE CAPITAL Mat -cSCEC-00-G00-ME-HO-O114 REV.O dar Metal Duct Raw Material Project Central Business District - New Administrative Capital Submittal Number" MAT-CSCEC-00-ME-HD-0111-00 Subject Metal Duct Raw Material Manufacturer Kandil (Galva & Kama) Coating Supplier - Revision 0 Specs Ref. 233113 BOQ Ref. 233113 Code “Code B”, Approved as Noted ENGINEER COMMENTS: ‘The submitted material approved in principle but contractor/manufacturer has to assure that the below comments are satisfied: 1. Contractor/manufacturer requested to provide mill test certificate (MTC) for each consignment and/or batch delivered at site clarifying all mechanical, chemical and coating tests. 2. All consignments and/or batches delivered to site should stenciled by heat no., wall thickness, standard, date of production, coil no....ete. 3. Contractor/manufacturer to assure that all galvanization coating is G90 and/or Z275 negative tolerance shall not accepted. 4. For any consignments and/or batches delivered to site, engineer has the rights to take sample and ask contractor for third party test to assure its conformity with required standard at specification. 5. All measurement devices required for measuring metal thickness and galvization coating should be available at site. 6. Contractor requested to satisfy all comments indicated at method statements for duct fabrication. -End of Report- Page 1 oft

You might also like