Da

Date 01.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes
(PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

405 34723 126.70

Only Low-grade limestone is handled and crushed for Civil department usage.
0:15 Hopper empty
(Hopper empty hours included in the Crusher Run hours)

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
49 9.0

Pile No. Pile Quantity Cumulative. LSF

405 34723 126.70


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 0.00 0:00:00 0.00 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 0.00 0:00:00 0.00 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂
Pile full on
12.25 31.05.2021
MINES 2
n hours)

Cumulative
Boom Height
SiO₂

12.25 90%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 0.00 297978.00 282:20:00 1055.42 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 0.00 297978 282:20:00 1055.42 0.00 0.00


Total Excavation

297978.00

0.00

0.00

297978.00
Da
Date 02.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 5911.00 6:20:00 933.81 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 5911.00 6:20 933.81 0.00

Duration Reason for Stoppage

0:15 Shift start

0:40 stacker positining to new point pile

7:45 Local issue

0:30 Stopped due to local issue

2:30 Spillage conveyor slip

Note: Limestone handled from stockyard to crusher with minimum (3 tippers) due to local issue

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
Mines Blasting Status :
34 8.08

Pile No. Pile Quantity Cumulative. LSF

Point Pile (36) 505 135.00

406 4672.91 133.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 2110.00 8021.00 5911.00 6:20:00 933.81 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 2110.00 8021.00 5911.00 6:20:00 933.81 0.00

Frequency of
Department
stoppage

Misc., 1

Misc., 1

Misc., 1

Misc., 3

Mechanical., 1

mum (3 tippers) due to local issue so TPH is 933.81


Cumulative
Boom Height
SiO₂

11.70 POINT PILE FULL

11.74 5%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 5911.00 303889.00 288:40:00 1052.72 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2110.00

0.00 5911.00 303889 288:40:00 1052.72 0.00 2110.00


Total Excavation

303889.00

0.00

2110.00

305999.00
Da
Date 03.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 22083.00 19:00:00 1162.26 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 22083.00 19:00 1162.26 0.00

Duration Reason for Stoppage

0:20 Tea break

0:55 Shift start

0:30 Tiffin break

0:15 Safety talk

0:25 260 BC discharge chute coating clearance

1:05 Lunch break

0:30 Shift change

1:00 Dinner Break


Hopper empty due to shortage of tipper
0:45
(Hopper empty hours included in the Crusher Run hours)
Hopper empty due to spillage cleaning on weigh bridge
0:15
(Hopper empty hours included in the Crusher Run hours)

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

406 30490 127.5


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 22083.00 27994.00 25:20:00 1105.17 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 22083.00 27994.00 25:20:00 1105.17 0.00

Frequency of
Department
stoppage

Misc., 2

Misc., 1

Misc., 1

Misc., 1

Mechanical., 1

Misc., 1

Misc., 1

Misc., 1
MINES 5
n hours)
bridge
MINES 3
n hours)

Cumulative
Boom Height
SiO₂

12.32 82%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 27994.00 325972.00 307:40:00 1059.49 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2110.00

0.00 27994.00 325972 307:40:00 1059.49 0.00 2110.00


Total Excavation

325972.00

0.00

2110.00

328082.00
Da
Date 04.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 9438.00 9:05:00 1039.43 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 9438.00 9:05 1039.43 0.00

Duration Reason for Stoppage

0:45 BC100 Pullcord activated

0:10 Tea break

1:05 Shift change

0:10 Surgebin emptying

1:45 Pile full and stacker positioning to point pile

1:00 Point pile full

As a system requirement, to ensure continuous crusher operation when ever the stacker boom height re
reduced to 700-800 RPM to avoid jib conveyor jam. Due to this TPH is 1039.43.
Hopper empty due to shortage of tippers(Tyre punctures)
0:35
(Hopper empty hours included in the Crusher Run hours)

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

406 32288 128

Point pile 2123.42 128


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 9438.00 37432.00 34:25:00 1087.51 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 9438.00 37432.00 34:25:00 1087.51 0.00

Frequency of
Department
stoppage

Misc., 1

Misc., 1

Misc., 1

Misc., 1

Misc., 1

Misc., 1

en ever the stacker boom height reached to 85%, the WF-250 belt conveyor speed will be
1039.43.
unctures) Misc., 4
n hours)

Cumulative
Boom Height
SiO₂

12.25 Pile full

12.25 Point pile full


FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 37432.00 335410.00 316:45:00 1058.91 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2110.00

0.00 37432.00 335410 316:45:00 1058.91 0.00 2110.00


Total Excavation

335410.00

0.00

2110.00

337520.00
Da
Date 05.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 3417.00 2:55:00 1170.21 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 3417.00 2:55 1170.21 0.00

Duration Reason for Stoppage

18:20 Pile full and stacker positioning to new pile

0:10 Weigh bridge cross checking

0:20 Stacker tripped

0:15 Shift end

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
Pile No. Pile Quantity Cumulative. LSF

407 2975 129


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 3417.00 40849.00 37:20:00 1094.27 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 3417.00 40849.00 37:20:00 1094.27 0.00

Frequency of
Department
stoppage

Misc., 1

Misc., 1

Misc., 1

Misc., 1
Cumulative
Boom Height
SiO₂

12.06 1%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 40849.00 338827.00 319:40:00 1059.93 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 40849.00 338827 319:40:00 1059.93 0.00 2123.00


Total Excavation

338827.00

0.00

2123.00

340950.00
Da
Date 06.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 11762.00 10:40:00 1102.34 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 11762.00 10:40 1102.34 0.00

Duration Reason for Stoppage

0:50 Shift start dleay due to stacker opt non availability

1:05 Reject hopper full/pneumatic gate fault

0:30 Tiffin break

0:20 Safety talk

0:30 Mines blasting

0:40 Shift change

0:20 RFID programme updation

0:10 Surgebin emptying


0:10 BC 100 Pull cord activated

0:25 Crusher liner plate found at Magnetic separator

0:20 Shift end

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
50 8.0

Hopper empty
0:15 (Hopper empty hours included in the Crusher Run hours)

Pile No. Pile Quantity Cumulative. LSF

407 14894 128.7


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 11762.00 52611.00 48:00:00 1096.06 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 11762.00 52611.00 48:00:00 1096.06 0.00

Frequency of
Department
stoppage

y Misc., 1

Misc., 1

Misc., 1

Misc., 1

Misc., 1

Misc., 1

Misc., 2

Misc., 1
Misc., 1

Misc., 1

Misc. 1

n hours)
Misc., 3

Cumulative
Boom Height
SiO₂

11.95 43%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 52611.00 350589.00 330:20:00 1061.33 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 52611.00 350589 330:20:00 1061.33 0.00 2123.00


Total Excavation

350589.00

0.00

2123.00

352712.00
Da
Date 07.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 11931.00 10:50:00 1101.66 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 11931.00 10:50 1101.66 0.00

Duration Reason for Stoppage

0:15 Shift start

1:10 BC205 Diverting gate trip

0:30 Tiffin break

2:00 BC200 discharge chute plate welding work

0:30 Shift change

0:15 Stacker operator not available

0:05 Sample collection

0:05 Spillage conveyor Gear box oil top-up


0:20 Shift end

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Hopper empty shortage of tippers


0:50 (Hopper empty hours included in the Crusher Run hours)

Pile No. Pile Quantity Cumulative. LSF

407 26413 122.7


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 11931.00 64542.00 58:50:00 1097.09 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 11931.00 64542.00 58:50:00 1097.09 0.00

Frequency of
Department
stoppage

Misc., 1

Misc., 1

Misc., 1

Mechanical 1

Misc., 1

Process 1

Quality 1

Mechanical 1
Misc., 1

n hours)
Misc., 6

Cumulative
Boom Height
SiO₂

12.44 73%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 64542.00 362520.00 341:10:00 1062.58 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 64542.00 362520 341:10:00 1062.58 0.00 2123.00


Total Excavation

362520.00

0.00

2123.00

364643.00
Da
Date 08.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 6083.00 5:45:00 1057.91 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 6083.00 5:45 1057.91 0.00

Duration Reason for Stoppage

0:30 Shift start delay due to shortage of tipper drivers

0:10 Surgebin emptying

0:30 Tiffin break

0:30 Stacker operator not available

0:10 Surgebin emptying

8:25 Pile full

As a system requirement, to ensure continuous crusher operation when ever the stacker boom height re
reduced to 700-800 RPM to avoid jib conveyor jam. Due to this TPH is 1057.91
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

407 31955 121.6


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 6083.00 70625.00 64:35:00 1093.60 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 6083.00 70625.00 64:35:00 1093.60 0.00

Frequency of
Department
stoppage

s Mines 1

Misc., 1

Misc., 1

Process 1

Misc., 1

Misc., 1

en ever the stacker boom height reached to 85%, the WF-250 belt conveyor speed will be
1057.91
Cumulative
Boom Height
SiO₂

12.51 Pile full


FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 70625.00 368603.00 346:55:00 1062.50 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 70625.00 368603 346:55:00 1062.50 0.00 2123.00


Total Excavation

368603.00

0.00

2123.00

370726.00
Da
Date 09.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 12960.00 10:45:00 1205.58 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 12960.00 10:45 1205.58 0.00

Duration Reason for Stoppage

1:05 Shift start delay due to shortage of tipper drivers

0:30 Tiffin break

0:15 Surgebin emptying

0:25 Blasting clearance

0:55 Shift change

1:45 Spillage conveyor bolt inspection and retightening

0:20 Shift end


Hopper empty due to shortage of tippers
0:10
(Hopper empty hours included in the Crusher Run hours)

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
42 8.4

Pile No. Pile Quantity Cumulative. LSF

408 12557 139.3


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 12960.00 83585.00 75:20:00 1109.58 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 12960.00 83585.00 75:20:00 1109.58 0.00

Frequency of
Department
stoppage

s Mines 1

Misc., 1

Misc., 1

Misc., 1

Misc., 1

g Mechanical 2

Misc., 1
Misc., 1
n hours)

Cumulative
Boom Height
SiO₂

11.41 32%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 83585.00 381563.00 357:40:00 1066.80 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 83585.00 381563 357:40:00 1066.80 0.00 2123.00


Total Excavation

381563.00

0.00

2123.00

383686.00
Da
Date 10.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 13813.00 11:50:00 1167.62 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 13813.00 11:50 1167.62 0.00

Duration Reason for Stoppage

0:35 Shift start

1:00 Tiffin break

1:35 Blasting clearence

0:15 Shift change

0:25 Stacker operator not available

0:20 Shift end

Hopper empty
0:45
(Hopper empty hours included in the Crusher Run hours)
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
47 8.38

Pile No. Pile Quantity Cumulative. LSF

408 24588 128.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 13813.00 97398.00 87:10:00 1117.33 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 13813.00 97398.00 87:10:00 1117.33 0.00

Frequency of
Department
stoppage

Misc., 1

Misc., 1

Misc., 1

Misc., 1

Process 1

Mines 1

Misc., 7
n hours)
Cumulative
Boom Height
SiO₂

12.02 67%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 97398.00 395376.00 369:30:00 1070.03 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 97398.00 395376 369:30:00 1070.03 0.00 2123.00


Total Excavation

395376.00

0.00

2123.00

397499.00
Da
Date 11.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 8804.00 8:20:00 1056.90 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 8804.00 8:20 1056.90 0.00

Duration Reason for Stoppage

0:30 Shift start

0:30 Tiffin break

0:50 Crusher discharge chute bolts replaced

0:50 Shift change

0:10 Pile full

1:15 Scraper conveyor work

3:35 Point pile full


As a system requirement, to ensure continuous crusher operation when ever the stacker boom height re
reduced to 700-800 RPM to avoid jib conveyor jam. Due to this TPH is 1056.90

0:25 Hopper empty shortage of tippers


(Hopper empty hours included in the Crusher Run hours)

Pile No. Pile Quantity Cumulative. LSF

408 32180 123.8

Point pile 2141 140.2


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 8804.00 106202.00 95:30:00 1112.06 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 8804.00 106202.00 95:30:00 1112.06 0.00

Frequency of
Department
stoppage

Misc., 1

Misc., 1

Mechanical 1

Misc., 1

Misc., 1

Mechanical 1

Misc., 1
en ever the stacker boom height reached to 85%, the WF-250 belt conveyor speed will be
1056.90

Misc., 3
n hours)

Cumulative
Boom Height
SiO₂

12.48 Pile full

11.05 Point pile full


FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 106202.00 404180.00 377:50:00 1069.74 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 106202.00 404180 377:50:00 1069.74 0.00 2123.00


Total Excavation

404180.00

0.00

2123.00

406303.00
Da
Date 12.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 3634.00 3:00:00 1211.33 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 3634.00 3:00 1211.33 0.00

Duration Reason for Stoppage

11:30 Pile full

1:15 High vibration at primary crusher jack shaft NDE side

0:15 Shift end

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
Pile No. Pile Quantity Cumulative. LSF

409 3424 144.4


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 3634.00 109836.00 98:30:00 1115.09 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 3634.00 109836.00 98:30:00 1115.09 0.00

Frequency of
Department
stoppage

Misc., 1

side Misc., 1

Misc., 1
Cumulative
Boom Height
SiO₂

10.86 1%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 109836.00 407814.00 380:50:00 1070.86 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 109836.00 407814 380:50:00 1070.86 0.00 2123.00


Total Excavation

407814.00

0.00

2123.00

409937.00
Da
Date 13.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 15682.00 13:10:00 1190.74 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 15682.00 13:10 1190.74 0.00

Duration Reason for Stoppage

0:40 Shift start

0:40 Tiffin break

0:20 Safety talk

0:45 Shift change

0:10 Surgebin emptying

0:15 Shift end


Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Hopper empty shortage of tippers


0:10 (Hopper empty hours included in the Crusher Run hours)

Pile No. Pile Quantity Cumulative. LSF

409 18357 126.6


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 15682.00 125518.00 111:40:00 1124.01 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 15682.00 125518.00 111:40:00 1124.01 0.00

Frequency of
Department
stoppage

Misc., 1

Misc., 1

Misc., 1

Misc., 1

Misc., 1

Misc., 1
n hours)
Misc., 1

Cumulative
Boom Height
SiO₂

12.35 54%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 125518.00 423496.00 394:00:00 1074.86 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 125518.00 423496 394:00:00 1074.86 0.00 2123.00


Total Excavation

423496.00

0.00

2123.00

425619.00
Da
Date 14.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 12556.00 11:20:00 1108.21 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 12556.00 11:20 1108.21 0.00

Duration Reason for Stoppage

0:30 Shift start

0:30 Tiffin break

0:45 Crusher operator not available

0:40 Blasting clerance

0:15 Shift change

1:40 BC205 skirt rubber adjustment

0:20 Shift end


Powder factor
Blasted Holes (PF)
Mines Blasting Status :
39 8.79

Pile No. Pile Quantity Cumulative. LSF

409 30823 126


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 12556.00 138074.00 123:00:00 1122.55 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 12556.00 138074.00 123:00:00 1122.55 0.00

Frequency of
Department
stoppage

Misc., 1

Misc., 1

Mines 1

Mines 1

Misc., 1
39

Mechanical 1

Misc., 1
Cumulative
Boom Height
SiO₂

12.41 85%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 138074.00 436052.00 405:20:00 1075.80 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 138074.00 436052 405:20:00 1075.80 0.00 2123.00


Total Excavation

436052.00

0.00

2123.00

438175.00
Da
Date 15.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 2879.00 3:25:00 841.81 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 2879.00 3:25 841.81 0.00

Duration Reason for Stoppage

3:00 Stacker conveyor jam

0:30 Tiffin break

1:05 Spillage conveyor inspection and grinding path adjustment

1:30 Pile full and stacker shifting for point pile

1:30 Shift change

5:00 Point pile full

As a system requirement, to ensure continuous crusher operation when ever the stacker boom height re
reduced to 700-800 RPM to avoid jib conveyor jam. Due to this TPH is 841.81
Powder factor
Blasted Holes (PF)
Mines Blasting Status :
62 8.50

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9

Point pile 1052.98 139.5


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 2879.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 2879.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Misc., 1

djustment Mechanical 1

Mines 1

Misc., 1
39

Misc., 1

en ever the stacker boom height reached to 85%, the WF-250 belt conveyor speed will be
841.81
Cumulative
Boom Height
SiO₂

12.33 Pile full

10.65 Point pile full


FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 2123.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 2123.00


Total Excavation

438931.00

0.00

2123.00

441054.00
Da
Date 16.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


409 32278 126.9

Point pile 1052.98 139.5


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
12.33 Pile full

10.65 Point pile full


FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 17.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 18.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 19.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 20.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 21.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 22.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 23.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 24.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 25.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 26.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
58 8.35

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 27.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 0.00 0:00:00 0.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 0.00 0:00 0.00 0.00

Duration Reason for Stoppage

16:00 Pile full

Powder factor
Blasted Holes
(PF)
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

409 32278 126.9


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 0.00 140953.00 126:25:00 1114.96 0.00

Frequency of
Department
stoppage

Misc., 1

Cumulative
Boom Height
SiO₂

12.33 Pile full on


15.06.2021
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 140953.00 438931.00 408:45:00 1073.84 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 0.00

0.00 140953.00 438931 408:45:00 1073.84 0.00 0.00


Total Excavation

438931.00

0.00

0.00

438931.00
Da
Date 28.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 3645.00 3:00:00 1215.00 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 3645.00 3:00 1215.00 0.00

Duration Reason for Stoppage

8:00 Pile full

3:10 Pneumatic vibrator fixing for BC 260 discharge chute

0:45 Point pile full

0:45 Secondary crusher contactor fault

0:20 Shift end

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
- -
Pile No. Pile Quantity Cumulative. LSF

Point pile 1290 149.4

410 2514 145


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 3645.00 144598.00 129:25:00 1117.28 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 3645.00 144598.00 129:25:00 1117.28 0.00

Frequency of
Department
stoppage

Misc., 1

ute Mechanical 1

Misc., 1

Electrical 1

Misc., 1
Cumulative
Boom Height
SiO₂

11.03

11.03 5%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 144598.00 442576.00 411:45:00 1074.87 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 1128.02

0.00 144598.00 442576 411:45:00 1074.87 0.00 1128.02


Total Excavation

442576.00

0.00

1128.02

443704.02
Da
Date 29.06.2021
Today
Sl.No
To crusher
To
To crusher Black Soil Dump
Mines Excavation (In MT)
Run hours TPH

Limestone Production
1
From Mines 13277.00 11:15:00 1180.18 0.00

2 Black Soil From Mines 0.00 0.00 0.00 0.00

3 Limestone From Mines 0.00 0.00 0.00 0.00

Total 13277.00 11:15 1180.18 0.00

Duration Reason for Stoppage

0:30 Shift start

0:30 Tiffin break

0:40 LS material jam clearance work at BC 200 & BC 205

0:50 Shift change

1:55 Stacker over travelling

0:20 Shift end

Powder factor
Blasted Holes (PF)
Mines Blasting Status :
Mines Blasting Status :
- -

Pile No. Pile Quantity Cumulative. LSF

410 15595 130.5


Daily Production Report - Mines

Today Month to date

To
Limestone to Limestone from stock Total Excavation To crusher (In Run hours TPH Black Soil
Stock yard to Crusher MT) Dump

0.00 0.00 13277.00 157875.00 140:40:00 1122.31 0

0.00 0.00 0.00 0 0 0 0.00

0.00 0.00 0.00 0 0 0 0

0.00 0.00 13277.00 157875.00 140:40:00 1122.31 0.00

Frequency of
Department
stoppage

Misc., 1

Misc., 1

05 Misc., 1

Misc., 1

Misc., 1

Misc., 1
Cumulative
Boom Height
SiO₂

12.42 38%
FY 2021 - 2022
to date Year to date

To To To
Limestone Total Excavation To crusher (In Run hours TPH Black Soil Limestone
Stock yard MT) Dump (in MT) Stock yard

0 157875.00 455853.00 423:00:00 1077.67 0.00 0.00

0 0.00 0 0 0 0.00 0.00

0.00 0.00 0 0 0 0.00 1128.02

0.00 157875.00 455853 423:00:00 1077.67 0.00 1128.02


Total Excavation

455853.00

0.00

1128.02

456981.02