ID ITEMS TO BE CHECKED C CC NC COMMENT/ REMARK/ Condition Report page #/ Drawing reverance no.s
Proper
a metrological data
has been used
Catchment
b delineation is
made annexed
Discharge
estimation for
appropriate design
d period of each
selected structure
is
made and annexed
Optimum and
economic Cross
drainage structure
e
is selected where
alternatives
exist
Summary of
hydraulic
calculation has
f been tabulated for
both minor and
major
drainage structures
Catchment
h delineated map
has been attached
Erosion protection
structures are
j identified and
proposed where
appropriate
Evaluation on
Structural Design
of Bridges
BRIDGE
a
GEOMETRY
Confirm hydraulic
requirement
i
including
freeboard
Check of
consistency of
ii alignment and
details with
roadway plans
Confirm Depth of
iii
foundation
Confirm Potential
iv
scour requirements
APPLICABLE
b BRIDGE DESIGN
STANDARDS
ADOPTED
c DESIGN
METHODS
MATERIAL
d
PROPERTIES
BRIDGE
LOADING (Dead,
Additional Dead,
d Design Vehicle
Load, Associated
Live Loads, Earth
pressure …)
CHECKING
e DESIGN
CRITERIA FOR:
Railings, Drains,
ii
Cross fall
Abutment, wing
iii walls &
Foundations
Annexed
f Structural statical
Calculation
Check Analysis of
g the most important
structural elements
Evaluation for
Drawings
Sequence of
a
drawings
b Cover sheet
Drawing index
c
sheet
d Typical section
Crown, foreslopes,
ditch slopesk,
e
typical cut and fill
slopes are shown
Proposed
pavement structure
f clearly shown and
variability with
station tabulated
List of
g
Bm’s/pillars
h Plan profiles
Pavement
i
thickness
j List of structures
Drainage standard
k
drawings
1= 200 horizontal
L
& 1= 2000 vertical
(400) (4000)
On each plan
horizontal
alignment data,
curve data,
M stationing and
bearings are
clearly indicate
and provided in
tabular form
On each profile
vertical curve
data, VPI
information, K
values, length of
N verticle
curves, grades, has
been clearly
detailed on the
drawing and
tabulated
Sheet ( naming
O /numbering) is
consistant.
Control point are
P indicted on each
plan.
Cut/fill operation
Q
is balanced
MINOR
DRAINAGE
Cross drainage
i structures are
indicated on plan
Hydraulic
recommendations
followed
(hydraulic
ii information, slope,
length, and
invert elevations
shown on
plan/profile)
Standard bridge
iv loading and bridge
width provided
Standard drawings
vi
are attached