SHARM ELSHEIKH 12015-J-022-REP-111
6 x LM6000 50Hz SIMPLE CYCLE 0 1
CONTRACTOR VENDOR MAIN CONTRACTOR
CONTRACTOR SUB-CONTRACTOR
Title
UNIT(2) - BECKWITH PROTECTION RELAY (M-3425A)
TEST REPORT
Contents
SCOPE:.............................................................................................................................................................................5
Setting ...................................................................................................................................................................... 6
Relay Secondary Metering ....................................................................................................................................... 6
Injecting on Terminal CT’s between G.C.B & GSU................................................................................................ 6
Pick-up Test ...................................................................................................................................................... 6
Time Test .......................................................................................................................................................... 7
Setting ...................................................................................................................................................................... 8
Relay Secondary Metering ....................................................................................................................................... 8
Pick-up Test ............................................................................................................................................................. 8
Time Test ................................................................................................................................................................. 9
Blocking Inputs Test .............................................................................................................................................. 10
Setting .................................................................................................................................................................... 11
Relay Secondary Metering ..................................................................................................................................... 11
59 (#1) Testing ....................................................................................................................................................... 11
Pick-up Test .................................................................................................................................................... 11
Time Test ........................................................................................................................................................ 12
Function: 59 (#2).................................................................................................................................................... 13
Pick-up Test .................................................................................................................................................... 13
Time Test ........................................................................................................................................................ 13
Setting .................................................................................................................................................................... 14
Relay Secondary Metering ..................................................................................................................................... 14
24 (#1) Testing ....................................................................................................................................................... 14
Pick-up Test .................................................................................................................................................... 14
Time Test ........................................................................................................................................................ 15
24 (#2) Testing ....................................................................................................................................................... 16
Pick-up Test .................................................................................................................................................... 16
Time Test ........................................................................................................................................................ 16
Setting .................................................................................................................................................................... 17
Pick-up Test ........................................................................................................................................................... 17
Time Test ............................................................................................................................................................... 18
Title: Document No. Rev. Page
Setting .................................................................................................................................................................... 19
81 (#2) Testing ....................................................................................................................................................... 19
Pick-up Test .................................................................................................................................................... 19
Time Test ........................................................................................................................................................ 20
81 (#4) Testing ....................................................................................................................................................... 20
Pick-up Test .................................................................................................................................................... 20
Time Test ........................................................................................................................................................ 21
Blocking Input Test ................................................................................................................................................ 21
Setting .................................................................................................................................................................... 22
Time Test ............................................................................................................................................................... 22
Setting .................................................................................................................................................................... 23
Definite-Time Testing ............................................................................................................................................ 23
Pick-up Test .................................................................................................................................................... 23
Time Test ........................................................................................................................................................ 24
Inverse-Time Testing ............................................................................................................................................. 24
Time Test ........................................................................................................................................................ 24
Reset Time Test ..................................................................................................................................................... 25
Setting .................................................................................................................................................................... 26
Relay Secondary Metering ..................................................................................................................................... 26
Pick-up Test ........................................................................................................................................................... 26
Time Test ............................................................................................................................................................... 27
Blocking Input Test ................................................................................................................................................ 27
Setting .................................................................................................................................................................... 28
Pick-up Test ........................................................................................................................................................... 28
Over-current Pick-up Test ............................................................................................................................... 28
Under-voltage Pick-up Test ............................................................................................................................ 28
Time Test ............................................................................................................................................................... 29
Pick-up Time Test ........................................................................................................................................... 29
Drop-Out Time Test ........................................................................................................................................ 30
Setting .................................................................................................................................................................... 31
Relay Secondary Metering ..................................................................................................................................... 31
Pick-up & Time Test .............................................................................................................................................. 31
At 100 % Voltage. ........................................................................................................................................... 32
At 50 % Voltage. ............................................................................................................................................. 35
At 25 % Voltage. ............................................................................................................................................. 37
At Values Less Than 25 % Voltage. ............................................................................................................... 39
At Values Greater Than 100 % Voltage. ......................................................................................................... 40
Setting .................................................................................................................................................................... 41
Zones boundaries Test............................................................................................................................................ 41
Time Test ............................................................................................................................................................... 41
Zone-1 (40 #1) Time Test. .............................................................................................................................. 41
Zone-2 (40 #2) Time Test. .............................................................................................................................. 42
Setting .................................................................................................................................................................... 43
51N (#1) Testing .................................................................................................................................................... 43
Pick-up Test .................................................................................................................................................... 43
Time Test ........................................................................................................................................................ 44
51N (#2) Testing .................................................................................................................................................... 44
Pick-up Test .................................................................................................................................................... 44
Time Test ........................................................................................................................................................ 45
Setting .................................................................................................................................................................... 46
Phase Angle Window: 10 (Degree) ........................................................................................................................ 46
Delta Voltage: 11.0 (V) .......................................................................................................................................... 46
Lower Voltage Limit: 58 (V) ................................................................................................................................. 47
Upper Voltage Limit: 126 (V) ................................................................................................................................ 48
Sync Check Delay: 1 (Cycles) ............................................................................................................................... 48
Blocking Input: 5 ................................................................................................................................................... 49
Setting .................................................................................................................................................................... 49
Dead Voltage Limit: 11 (V) ................................................................................................................................... 49
Time Delay: 1 (Cycle) ............................................................................................................................................ 50
Blocking Input: 5 ................................................................................................................................................... 50
Title: Document No. Rev. Page
SCOPE:
Purpose of this document is to provide the tests of BECKWITH (M-3425A Generator Protection
Relay) functions for unit (2) for SHARM ELSHEIKH 6 x LM6000 50 Hz SIMPLE CYCLE COMBINED
CYCLE PROJECT.
Time Test
Setting
Pick-up Test
This test is done by using Ramp function on secondary injection tester and decreasing time delay
to the minimum value then re-entering the time delay value after finishing pick-up test.
Title: Document No. Rev. Page
Time Test
59 (#1) Testing
Pick-up Test
This test is done by using Ramp function on secondary injection tester and decreasing time delay
to the minimum value while de-activating 59 (#2) then re-entering the time delay value after
finishing pick-up test.
Title: Document No. Rev. Page
Time Test
Function: 59 (#2)
Pick-up Test
Time Test
24 (#1) Testing
Pick-up Test
This test is done by using Ramp function on secondary injection tester and decreasing time
delay to the minimum value while de-activating 24 (#2) then re-entering the time delay value
after finishing pick-up test.
Time Test
24 (#2) Testing
Pick-up Test
Time Test
Function: 50 (Breaker-Failure)
Setting
Pick-up Test
This test is done by using Ramp function on secondary injection tester and decreasing time delay
to the minimum value then re-entering the time delay value after finishing pick-up test.
Time Test
81 (#2) Testing
Pick-up Test
This test is done by using Ramp function on secondary injection tester and decreasing time
delay to the minimum value then re-entering the time delay value after finishing pick-up test.
Time Test
81 (#4) Testing
Pick-up Test
Time Test
This test is done by making jumper on input-1 while applying a frequency of 47 Hz. Then the
output is blocked.
If jumper is removed, the output comes-back.
Checking: Ok.
Title: Document No. Rev. Page
Time Test
Definite-Time Testing
Pick-up Test
This test is done by using Ramp function on secondary injection tester and decreasing time
delay to the minimum value while de-activating 46 (IT) then re-entering the time delay value after
finishing pick-up test. The current injected is in negative-sequence.
Time Test
Inverse-Time Testing
Time Test
K 30
I rated 0.79
Injected Current Value 200% 1.58 A
Calculated Tripping Time 7.5 Sec. 375 Cycle
K 30
I rated 0.79
Injected Current Value 300% 2.37 A
Calculated Tripping Time 3.333333 Sec. 166.6667 Cycle
Title: Document No. Rev. Page
Pick-up Test
Injecting rated voltage and increase current from zero in opposite direction (180 degree shift).
So pick-up will be at 0.005 PU= 0.005*0.79 Amp = 0.004 Amp.
Title: Document No. Rev. Page
Time Test
Pick-up Test
Over-current Pick-up Test
This test is done by using Ramp function of injected current values on secondary injection
tester while injecting under-voltage value.
Time Test
Pick-up Time Test
Applying –firstly- Over-current and then under-voltage when the leads of timer are out and not
connected to tester. Then connect timer before pick-up time comes.
Do not forget to reduce the drop-out time to be less value.
Figure 21: 51V C/CS as pick-up percentage related to input voltage as percentage.
Title: Document No. Rev. Page
At 100 % Voltage.
So the Pick-up will be 100% (1.18 Amp.).
Injected current value Calculated Time (Sec.) Measured Actual Time (Sec.)
11.7 A 0.165 0.172
5A 0.359 0.357
3.6 A 0.605 0.585
2.13 A 1.96 1.941
Table 1: Summary of injected values results at 100 % voltage.
Title: Document No. Rev. Page
At 50 % Voltage.
Injected current value Calculated Time (Sec.) Measured Actual Time (Sec.)
1.19 A 1.53 1.514
3.66 A 0.23 0.243
Table 2: Summary of injected values results at 50 % voltage.
Title: Document No. Rev. Page
At 25 % Voltage.
So the Pick-up will be 25% (0.295 Amp.).
Voltage restrain: quarter rated voltage and quarter pickup current,
Voltage injection = 63.5/4 = 15.88 V.
Pickup current =1.18/4 = 0.295 A.
Injected current value Calculated Time (Sec.) Measured Actual Time (Sec.)
0.63 A 1.31 1.306
1.45 A 0.296 0.328
Table 3: Summary of injected values results at 25 % voltage.
Title: Document No. Rev. Page
Table 5: Summary of injected values results at values greater than 100 % voltage.
Title: Document No. Rev. Page
Time Test
Zone-1 (40 #1) Time Test.
Title: Document No. Rev. Page
Time Test
Time Test
De-activating firstly, the function 51N (#1).
The Value obtained as shown in previous snap-shoot was 11.14 Volt (= 70 – 58.86).
Blocking Input: 5
This test is done by making jumper on input-5 while all synchronization conditions are satisfied.
Then the output is blocked.
If jumper is removed, the output comes-back.
Checking: Ok.
Blocking Input: 5
This test is done by making jumper on input-5 while all synchronization conditions are satisfied.
Then the output is blocked.
If jumper is removed, the output comes-back.
Checking: Ok.