Part A: Measurements
1. Retaining Wall
Part B
Construction and Overheads
Rate analysis for amount or costing. The basic structure starts from the material, labour,
equipment, machines, water, electricity, and C.P.O.H. (Contractors Profit over Head). According
to the guidelines, The profit will be divided as 7.5% to the contractor and overhead (Li et 2017).
Over Heads
Overall estimate and cost of the project; for example, a contractor gets a project estimate of
about 100 billion. Based on the calculation, the overhead cost is about 7.5%, which means to
manage the construction needs (Li et 2017).
References
Chen, H., Asteris, P.G., Jahed Armaghani, D., Gordan, B. and Pham, B.T., 2019. Assessing
dynamic conditions of the retaining wall: developing two hybrid intelligent models. Applied
Sciences, 9(6), p.1042.
Gandomi, A.H., Kashani, A.R., Roke, D.A. and Mousavi, M., 2017. Optimization of retaining
wall design using evolutionary algorithms. Structural and Multidisciplinary Optimization, 55(3),
pp.809-825.
Li, H., Zheng, X., Sheng, Y. and Ke, S., 2017. Differential settlements of embankment treated by
cement fly-ash gravel pile and sheet pile in freeway extension constructions. International
Journal of Geomechanics, 17(11), p.04017092.
Lonero, R.P., 2020. Method for manufacturing a stone retaining wall block. U.S. Patent
10,844,571.
McShane, G., Wuensch, A. and Wendt, R.R., PilePro LLC, 2018. Connecting profile for
connecting sheet piles of a sheet pile wall. U.S. Patent Application 15/700,426.