The document provides a resistivity survey report for a site in Village Redapur, District Mainpuri, Uttar Pradesh, including details on the client, location, date of survey, expected soil strata at different depths, and recommendations for tube well construction such as recommended drilling depth and diameter, expected water quality and discharge. The report recommends drilling to a depth of 100 meters below ground level at the surveyed point to obtain an expected discharge of 1200-1500 liters per minute and estimates the initial water level to be 15-20 meters.
The document provides a resistivity survey report for a site in Village Redapur, District Mainpuri, Uttar Pradesh, including details on the client, location, date of survey, expected soil strata at different depths, and recommendations for tube well construction such as recommended drilling depth and diameter, expected water quality and discharge. The report recommends drilling to a depth of 100 meters below ground level at the surveyed point to obtain an expected discharge of 1200-1500 liters per minute and estimates the initial water level to be 15-20 meters.
The document provides a resistivity survey report for a site in Village Redapur, District Mainpuri, Uttar Pradesh, including details on the client, location, date of survey, expected soil strata at different depths, and recommendations for tube well construction such as recommended drilling depth and diameter, expected water quality and discharge. The report recommends drilling to a depth of 100 meters below ground level at the surveyed point to obtain an expected discharge of 1200-1500 liters per minute and estimates the initial water level to be 15-20 meters.
A. Recommendation depth of drilling 100+-10 B.G.L. for tube well Construction.
B. Well logging is recommendation at this site. The tube well can be constructed on the basis of well logging report only. C. Recommendation rotary DC rig machine for drilling 500mm. dia. bore hole and 200mm. MS/PVC casing pipe. D. Water Quality is expected to be medium. E. Expected Discharge is 1200 to 1500 L.P.M. F. Report is not valid for legal complication. G. There may be 10-15 Percent variation in above result. H. Drilling essentially be carried out at the surveyed point to get the above results.