Professional Documents
Culture Documents
S.NO Query/Feedback from client From Via Received date Concern Person Remarks
Hi Mahendra,
I will talk to Seshu and clear the drawings immediately
zen is our HVAC and panel consultant closed - 18th May -
1
They know in and out about our layout
Mr.Manikandan S Mail Mon, 17 May,
Seshu Modified RCP &
@ Seshu call me , you have to give your final clearance on design and 17:38 COP Shared with
layout as a consultant
Vendor
Hi, Seshu,
Dear Rajasimha,
2 Jun 2021, 19:47 (6 days ago)
Regards,
Please go through below mentioned comments and proceed for your further necessary action .
2 Mr.Manikandan S Mail Attachments Seshu closed Cut-out Sizes for electrical and Display units, Light fixtures have been updated in the legend as per the GA drawings shared
Manikandan through below mail ( Please confirm)
2 Jun 2021, 14:11
in legend Cut out Sizes verified it is matching with GA drawings .
9100787338 In the first floor crystallizer area( Stream-2) Hepa filters position to be changed. Please suggest a new position for these.
Please find re-arranged Crystalizer area ( Stream-02) Lights & Filters are layouts in mail.
Please find the attached door schedule for the below approved layout. Please approve the door schedule to release them for
manufacturing.
Door schedule & Openings verified as per layout all doors and opening positions are matching.
in the first floor area grid no - K two number ECP removed as per Manikandhan sir comments.
Regards,
Seshu N
Hi Chandra,
Pls provide the AHU P&ID Showing manifold , with control valve
size , flow requirements, damper size & actuator torque details , LEL
& O2 sensor , smoke detector , T, RH & Dp sensor , etc
this we need immediately by Monday
I hope we have finalised the same during tender stage itself
3
However , pls provide final purchase specifications immediately to
Mr.Manikandan S Mail Sun, 6 Jun, 15:32 Seshu Under Progress
(2 days ago)
initiate procurement
Regards
Kuppu