You are on page 1of 4

Assignment No 2

Project Management

Tagline: In it to Win it.


Group name: Dominators
Project Manager: Noor

Submitted by: Noor (180326)


Zain Ali (180317)
Kinza Zaheer (170146)
Rabail Jaleel (1
Submitted to: MR. Umer Ghauri
BUSINESS CHARTER

BUSINESS CASE
PROJECT NAME “Smart Home ”
PROPOSED DATE 1st Mar,2020
THE Material:
PROJECT(OBJECTIVES) • Construction requirement include bricks, steel, cement,
sand tiles etc.
• Smart Home automation makes life easier by getting the
work done by voice control, remote control, tablet, app or
smart phone.
• The type of wiring e.g.: hardwire, wireless, hybrid.
Labor:
• Labor is required for installation and activation of
software programs, transceiver, triggers, and user
interface.
• Labor required for construction.
LIMITATIONS(RISK) • Power outages (leading delay in timeline)  High cost of
installation of automation.
• Unskilled labor.
• Increase in labor and material cost.
• Not meeting quality criteria.
TIME ANALYSIS • Time required for construction of 5 Marla house is around
180 days.
• The estimated time required for installation of smart
house is about two to three weeks. Depending upon the
number and type of devices that we need to install.
COST ANALYSIS • The cost of construction of 5 Marla house grey structure
is Rs.2363150.
• Total cost of finishing is Rs.2231575.
• The cost of installation of smart house installation system
ranges from $675-$3500 depending on the requirement
and type of wiring.(Hardwire, Wireless, Hybrid)
BENEFITS Automation system:
• It is power saving.
• It is remote control.
• It makes your life easier and more convenient.
• It is time saving.
• It provides security to your home when you are away.
• It boost up your professional life.
• Less competitors of smart homes in market.

PROJECT DESCRIPTION
The project which our company opted for is unique in its nature whose output is “a fully
constructed and installed Smart Home” which will cater the advanced needs or scope of our
Customer’s requirements. Digital application could be installed along with censors and wireless
advanced systems (mechanisms). One can easily save their time in doing different household tasks
just at one click. There will be wireless wiring and 3D wallpaper and flooring. Our digital graphics
team will work closely in coordination with our engineers to bring up the best possible results in
maintaining under time, cost and scope (quality) of this project. LED and LRD systems will be
installed for lighting and ceiling.

DELIVERABLES TIMELINE
• To deliver a fully installed smart home to • Complete the construction of house and
our customers installation of automation system within 6
• Remaining in the budgeted time, cost months.
and scope of this project • Start Date: 1st March,2020.
• To provide a different and a whole new • End Date: 31st August,2020.
experience to our customers
• To build a strong PM team
• To strengthen our company’s image as a
whole
• To deliberately meet the criteria of our
team and customers
• To oversee any risks and opportunities
involved in this project

SCOPE BUDGET
• In scope: Construction of a 5marladouble • The total cost of construction of grey
story furnished house including 4 structure is Rs. 2,363,150.
bathrooms, 2 kitchens, a terrace on first • The cost of finishing is Rs. 2,231,575.
floor, and storeroom on second floor. • The cost of installation of automated
• Tiles are used on floors and marbles used system is Rs.5, 39,525($3500).
on stairs and kitchen shelves.
• Installation of home automation system
within given time frame.
• Out of scope: Home appliances, curtains,
LED, mirror and other household items.
OUTCOMES:
• Construction of 5 Marla furnished smart
home that reacts intelligently to your daily
routine allowing home owner to control
the system via remote or voice control.
• Increased Efficiency
• Meeting 6 sigma quality criteria

CEO: PROJECT MANAGER:


Mr. Umer Ghauri Aimen Mustafa

You might also like