Final Bill Format (MKT & WH)
Final Bill Format (MKT & WH)
DivisionBllNo.G/BBCIAPARTI NOP/Roads/NLOT o
t.
S-Division Blill No. G/BBC/SD-I/APART/NL-7/2020-21/IPC-1/36 Dt.13/04/2021
Chief Engineer, (EAP), ARR& TI Complex, PWRD, Assam, Guwahati
APART WORKs cOMPONENT
Name of Work: Construction of road from Moranjan to Pagladiya embankment of 3 no Balitara village Paschim Banbhag
Mouza in Nalbari District. Assam
Name ofContractor:Prabir KALITA
Contract Agreement No. CEJAPART/40/2020/16 Dated: 05/01/2021
Package no.: APARTINOCP/ ROADS/NL-07
Date of order to commence of work: 05/01/2021
Date of completion of work: Work in Progress
Initail contract price: Rs. 73,82,447.00
Revised contract price: Nil
INTERIN PAYMENT CERTIFICATENo.1
Period :Upto
SI Brief Description of ltems Total value to date (Rs) Value up to previous IPC (Rs)| Value of this IPC (Rs)
No
5-3-4)
Value of work as per BoQ (CoC-42). Refer Annex 1 20,24,081.00 0.00 20,24,081.00
Value of non-peishable materialsbroughtto site (CoC-51.4) &SI-3 of 0.00
0.00 0.00
Contract Data. Refer Annex I
c.Value of variation temsexecuted (CoC40)ReferAnnexl 0.00 0.00 0.00
0.00 0.00
Price adjustment (Coc-47) &Contract Data. Refer Annex IV 0.00
(A) Amount Due (excl Advance Payment) 20,24,081.00 0.00 20,24,081.00
e.
Mobilisaton Advance (COC-51) and Si-1ofContractData 0.00 0.00 0.00
Advance (CoC-51) and Sl-2 of Conrract Data 0.00 0.00
Equipment 0.00
(B) Total Advance Payment 0.00 0.00 0.00
(c) Gross Amount Due (incl Advance Payment) 20,24,081.00| 0.00 20,24,081.00
Repayment of Mobilisation Advance as per Contract Data (15% of 0.00 0.00 0.00
Amount (A)
Retention@6% ofAmount (A) up to max 5% of final contractprice 21445 00
Other (Specifty) FR (W.L)
Executive 1
Ac
Braha 1uiia
Divisivu, Úiiiuit
E 22!
N N
E 8 8 8 88 8
APART PWRD, Assam
I -CERTIFICATEs &SIGNATURE
1. The measurement on which are based the entries in columns 4 to 9 of IPC - 1
*2. Certified that in addition to quarter part from the quantities of work actually executed
connection with
as shown in column 7 of account I, some work has actually been done in
several items and the value of such work (after deducting there from the proportionate
amount of secured advance, if any ultimately recoverable on account of the quantities of
materials used therein) is in no case less than the advance payments as per column 3, of
Account II made or proposed to be made for the convenience of the contractor, in
*3. Certified
Account II above have
(1) That the plus quantities of materials shown in column 3 of has
the not
actually been brought by the contractor to the site of work and
contractor
Erecrtie
T.D.
Assistant Executive Engineer, PWRD RSt.
Junior Engineer, PVVRD
Brahmaputra Bridge Constn.Sub-Division-II Erahnn
Brahmaputra Bridae Consin Sub-Dwision-ll Asst. Eeeattve Engineer as Engineer PWRD
Jutfor EAgineer
Ref:- Renovation of official Building of DICC and Commerce Centre in Nagaon District.
Dear Sir,
With reference to the subject above, this is our issuance of the Completion Certificate of the work as
mentioned above, as per Contract Clause 55 & Sub-Clause 55.1. It is hereby agreed that the work of this
Contract as mentioned above, has been completed to a satisfactory standard and hence the issuance of this
completion certificate is accorded following a joint inspection of the work conducted on 01/11/2020.
Pursing clause 35.1 wehereby notify that the defects to be rectified are required to be completed by
you expenditiously during the defect liability period.
The defect liability period has commence on 01/11/2020 and will expire on 31/10/2021 Further you
Memo No.
Copy to:
1.The Chief Engineer, PWD (EAP) Cum Project Director World Bank Aided Project Assam, Fatasil Ambari,Guwahati-25
2.The General Manager, DICC,Nagaon Assam.
TB14A
1. Package No APART/NOCP/RoADS/NL-09
2. Name of Work :Comr ncli on Rsadom Morayan to: aplakiya
lyeuskon eut >3nomlitava Vtlape PalAin
n h o e leA in Nelberi disht,Asce
3. Divisional Bill No. & Date:
4. Name of Contractor. Sri habiy kalit
5. Contract Agreement No: eE/APART/40/20ro/6 os/o1/20 4
6. Time:- (a) Date of Commencement e/20-
(b) Date of Completion - Works in progress
7. Contract Amount Ks 73,8244
8. Bill Value
9. Utlized Quantity of Forest Materials
Material Cumulative Quantity (Cum)
Sand
Stone/GraveB 142
Earth
4817.94
Timber
10. Comment
Assistant Engineer
División Brahia
Construction
P W D
Bridge
( R O 0 ) ,G u w a h a t i - 2 5
Brahmaputra
Total
arh 4819.94
Construction
5
dge
rahmaputr
PWD (R
APART WORKS COMPONENT
Name of Work: Construetion of road from Moranjan to Pagladiya embankment of 3 no Balitara village Pascim Banbhag Mouza in Nalbari District. Assam
Setting Out
Unit- 1KM
Reference Bench Mark and Bench Mark
pillar as per MORD and Technical
each 1.000 10000.00 10000.00 1.00 0.00 1.00 10000.00 0.00 10000.00 100.00%|
|Specitications Clause No.- 100
AS BUILT DRAWING
Package No APART/N0CP/ROAD/KOK-02
F.W.O.No. CE/APART/145/2019/10 DT. 21/08/2019
NAME OF CONTRACTOR: Marjit Basumatary
PWDGOVT OF ASSAMS
HAREAABITATION
HABAREAITAT HABITATION
ARE
SMM) CULVIEXICHSTIRT690.NG0(S0MBOX
(SM X
HABIAREATATION
MXIART
NooOS H
OSV
2018-19
Batabari Road in Kokrajhar District, Assam under World Bank Funded APART for the year
Name of Work Construction of Road from Nalbari to
INTERLOCKING CC BLOCKS
80MM THICK
- SAND BED 30MM THICK
EDGE BLOCK
300MM(175MM - 150MM)-
ALL DIMENSIONS ARE IN MM WBM -II 75MM THICK
GSB GR-I1 100MM THICK
EW IN SHOULDER DL 100MM THICK
25% 2.5%-
1.5
Slope
EWIN
EWIN 5000 CORE
CORE
6000
7080
7380
su EXECUTYNEREN, PWD
KokkPKK DVISION
aFotADAD AGEREavTIEEFINFEBWD Di¥n.
JUNIOUR ENGINEER, PWD
KOKRAJHAR RR DIVIsiON KgURRASRURaRRdaHsB-DIVI`ITÖN
Sur.ivn
Name of Work: Construction
of Road from Nalbari to Batabari Road in Kokrajhar District, Assam under World Bank Funded APART for the year 2018-19
NOTES
1. ALL DIMENSIONS ARE IN MILIMETERS 1350
T75
175
ti50
ROADWAY
175
B
100
1000
40
GL GL
I75
A
PLAN-DEEP CULVERT 175
NOT TO SCALE
TOO0
DETAIL OF A
1500 NOT TO SCALE
SECTIONATC - C
NOT TO SCALE
PARAPET WALL
WINGS WALL
O00 1500
4050
115 125
/500-
GL
GL
15OMM PCC
6000
4050
3750
GL
GL
6000
4050
3750
GL
58.280 58.193
.193
RL ON ICBP 58.200 58.113
.113 58.038
RL ON WBM III 58.038 58.125
57.963
RL ON WBM II 7.963 58.050 57.771 57.441
57.950 57.863
RL ON GSB 57.441 57.771| 863 57.863 57.441 57.441
RL ON SHOULDER 57.441 57.441 57.863 57.950 57.341 57.341 57.231 57.281
57.763
RL ON DL 57.763 57.850 57.341 57.341 57.231 57.281
RL ON CORE 57.281 57.231 57.341 |57.341 57.763 57.850 57.763
3.540 3.690 6.000
RL ON INITIAL 57.281 57.231 57.341 57.341 1.875 0.000 1.875 3.000
6.000| 3.690|3.540 3.000
DISTANCE IN M
6000
4050
3750
GL
GL
Datum 555
Formation L
Level
Initial R in
Chainage
----**
Datum =55
Formation
|Level
initial RL
Chainage
LONGITUDINAL SECTION
Indications
Fomation Line
HFL
WBM-II& SHOULDER
WBM-1 &SHOULDER
GSB SHOULDER
E/W IN EMBANKMENT
RCC BRIDGE NO
RCC BRIDGECHAINAGE IN (M)
CULVERT NO 1/4
CULVERT CHAINAGE IN (M) 925
ICBP&SHOULDER
WBM-Il1 &SHOULDER
WBM-II&SHOULDER
GSB SHOULDER
E/W IN EMBANKMENT 1150.00 1200.00 1250.00 1300 1350 1415
|Distn. in M 700.00 750.00 800.00 850.00 900.00 950.00 1000.00 1050.00 1100.00
No-APART-NOCP-ROADS-KOK-02
Bataban in District, Package
Kokrajhar
PROJECT: Construction of road from Nalbari to
Chief Engineer,PWRD(EAP),Fatasil Ambari, Assam, Guwahat-25
NAME OF EMPLOYER The
Rural Road Dvision
NAME OF ENGINEER Executive Engineer,PWD,Kokrajhar
BTAD,Assam
NAME OF CONTRACTOR Sri Marjit Basumatary,Gossaigaon Kokrajhar ROAD STRIP PLAN
OCCUPANCY CERT!FICATE
This is to certify that Sri Nava Kanta
based work "Renovation of Official
Talukdar, Contractor has completed the need
the Nalbari District
Building of District Industries& Commerce Centre in
(Package No. APART/NOCP/DICC/NL-01) funded by World Bank as
per plane and estimate.
Now, after completing the work the contractor has handed over the Building/ structure
to the undersigned and the undersigned has taken over the same.