Annexure B
Al HADEED CONSTRUCTORS Date: 15/07/2019
Ref. AHC/GRC/2019/38
QUOTATION FOR MECHANICAL WORK AT PHLCEP PROJECT SWABI Rev. 0
Proposal 1 Fabrication & Installation/Erection at Site Ghulam Rasool &
Client: Company Pvt. Ltd.
Bill of Quantities for Lot-02
Bill No. 2.4 Mechanical Components of Pressure Pipe
BOQ Labour Rate
Description Unit Quantity Amount (PKR)
Item PKR
Fabrication of steel pipe, design, shop drawings,
transportation, laying in final position,
complete including Radiographic Test of
2.4.1 welded joints and Air Pressure Test as per Kg 10,769,059 55 592,298,245
drawings, specifications and directions of Engr.
lncharge.
Page 2 of 7
BOQ Labour Rate
Description Unit Quantity Amount (PKR)
Item PKR
Design, shop drawings, laying, testing and
commissioning of butterfly valve as per
2 .4.10 No 1 29,400 29,400
drawings, specifications and directions of Engr.
lncharge for 0.35 m dia pipe.
Design, shop drawings, laying, testing and
commissioning of Sleeve Valve for 1.0 m dia as
2.4 .11 No 2 73,500 147,000
per drawings, specifications and directions of
Engr. lncharge
Design, shop drawings, laying, testing and
commissioning of Sleeve Valve for 0.3 m dia
2.4.12 as per drawings, specifications and directions No 1 33,000 33,000
of Engr. Lncharge
Page 3 of 7
Annexure B
Al HADEED CONSTRUCTORS Date: 15/07/2019
Ref. AHC/GRC/2019/38
QUOTATION FOR MECHANICAL WORK AT PHLCEP PROJECT SWABI Rev. 0
Proposal 1 Fabrication & Installation/Erection at Site Ghulam Rasool &
Client: Company Pvt. Ltd.
Bill of Quantities for Lot-01
Bill No.2.4.4 Mechanical Works
BOQ Labour
Description Unit Quantity Amount (PKR)
Item Rate
Fabrication of steel pipe, design, shop drawings,
transportation, laying in final position, complete
including Radiographic Test of welded joints and
2.4.4.1 Kg 142,430 55 7,833,650
Air Pressure Test as per drawings, specifications
and directions of Engr. lncharge.
Page 5 of 7
Annexure B
Al HADEED CONSTRUCTORS Date: 15/07/2019
Ref. AHC/GRC/2019/38
QUOTATION FOR MECHANICAL WORK AT PHLCEP PROJECT SWABI Rev. 0
Proposal 1 Fabrication & Installation/Erection at Site Ghulam Rasool &
Client: Company Pvt. Ltd.
Bill of Quantities for Lot-01
Bill No. 3.4 Mechanical Components of Pressure Pipe
BOQ Labour Rate
Description Unit Quantity Amount (PKR)
Item PKR
Fabrication of steel pipe, design, shop drawings,
transportation, laying in final position, complete
including Radiographic Test of welded joints and Air
3.4.1 Kg 648,808 55 35,684,440
Pressure Test as per drawings, specifications and
directions of Engr. lncharge.
Page 6 of 7
BOQ Labour Rate
Description Unit Quantity Amount (PKR)
Item PKR
Providing & applying Red Oxide paint on external
surface of pipe as per specifications & directions
3.4.12 Sq.m 11,454 115 1,317,210
of Engr. lncharge.