You are on page 1of 9

1.

Refer to a waste disposal site designed, constructed, operated and maintained in a manner that exerts engineering control over
significant potential environmental impacts arising from the development and operation of the facility.
a. Dumb site b. Sanitary landfill c. Open dumb site d. Aota e. Nota

2. Refer to a solid waste management practice of separating, at the point of origin, different materials found in solid waste in order
to promote recycling and re-use of resources and to reduce the volume of waste for collection and disposal.
a. Segregation b. Segregation at source c. Receptacles d. Aota e. Nota

3. This Act shall be known as the “Ecological Solid Waste Management Act of 2000”
a. RA no. 9275 b. RA no. 9003 c. RA no. 1586 d. Aota e. Nota

4. This Act shall be known as the “Philippine Clean Water Act of 2004.”
a. RA no. 9725 b. RA no. 9275 c. RA no. 9257 d. Aota e. Nota

5. Means any unauthorized or illegal disposal into any body of water or land of wastes or toxic or hazardous material: Provided, that
it does not mean a release of effluent coming from commercial, industrial, and domestic sources which are within the effluent
standards
a. Unsegregated b. Dumping c. Effluent d. Aota e. Nota

6. Means water containing less than 500 ppm dissolved common salt, sodium chloride, such as that in groundwater, rivers, ponds
and lakes.
a. Tap water b. Freshwater c. Ground water d. Aota e. Nota

7. The Department, in coordination with NWRB, shall designate certain areas as water quality management areas using appropriate
physiographic units such as watershed, river basins etc. What NWRB means?
a. National Water Research Bureau b. National Water Resources Board
c. National Water Resources Bureau d. Aota e. Nota

8. This Act shall be known as the “Philippine Clean Air Act of 1999.”
a. RA no.8794 b. RA no. 8749 c. RA no. 8947 d. Aota e. Nota

9. Means any matter found in the atmosphere other than oxygen, nitrogen, water vapor, carbon dioxide, and the inert gases in their
natural or normal concentrations, that is detrimental to health or the environment, which includes but not limited to smoke, dust,
soot, cinders, fly ash, solid particles of any kind, gases, fumes, chemical mists, steam and radio-active substances;
a. Air pollution b. Air pollutant c. Water pollution d. Aota e. Nota

10. Means any air contaminant, pollutant, gas stream or unwanted sound from a known source which is passed into the atmosphere
a. Greenhouse gases b. Emission c. air Contamination d. Aota e. Nota

11. This Act shall be known as the "Toxic Substances and Hazardous and Nuclear Wastes Control Act of 1990."
a. RA no.6969 b. RA no. 9669 c. RA no.9696 d. Aota e. Nota

12. Are hereby defined as substances that are without any safe commercial, industrial, agricultural or economic usage and are
shipped, transported or brought from the country of origin for dumping or disposal into or in transit through any part of the territory
of the Philippines.
a. Nuclear Waste b. Hazardous Waste c. Unsegregated Waste d. Aota e. Nota

13. It is a list of existing & new chemicals that DENR has determined to potentially pose unreasonable risk to public health,
workplace & the environment.
a. PICCS b. PCL c. PICCL d. Aota e. Nota

14. It is a list of all existing chemicals & chemical substances used, sold, distributed, imported, processed, manufactured, stored,
exported, treated or transported in the Philippines.
a. CCO b. PICCS c. PCL d. Aota e. Nota

15. Purpose is to screen harmful substances before they enter the Philippine’s commerce
a. SQI b. PMPIN c. PCL d. Aota e. Nota
16. Prohibits, limit, or regulate the use, manufacture, import, export, transport, processing, storage, possession, and wholesale of
those priority chemicals that DENR determined to be regulated, phased- out, or banned due to the serious risks they pose to public
health, workplace & environment.
a. SQI b. CCO c. PMPIN d. Aota e. Nota

17. Establishing an environmental impact statement system including other environmental management related measures and for
other purposes or (ENVIRONMENTAL IMPACT STATEMENT (EIS) STATEMENT OF 1978)
a. PD 1856 b. PD 1586 c. PD 1658 d. Aota e. Nota

18. Environmental Compliance certificate (ECC) issued by?


a. DENR b. EMB c. DENR or EMB d. Aota e. Nota

19. Certificate of Non-Coverage refers to the document issued by ____ stating that the proposed project is not covered by the
Philippine Environmental Impact Assessment System, therefore, the proponent is not required to secure an ECC prior to
commencement of operation.
a. DENR b. EMB c. DENR or EMB d. Aota e. Nota

20. A technical person competent in pollution control and environmental management, performing the duties and responsibilities in
a particular establishment and officially accredited by the Environmental Management Bureau Regional Office to perform such
responsibilities
a. Pollution Technician b. Pollution Control Officer c. Pollution Accreditor d. Aota e. Nota

1. In Free Irrigation Service Act ,How many hectares does a farmer needed to be exempted from paying irrigation service fees (ISF)
for water derived from national irrigation systems (NIS) and communal irrigation systems (CIS) that were, or are to be, funded,
constructed, maintained and administered by the National Irrigation Administration (NIA) and other government agencies, including
those that have been turned over to irrigators associations (IAs).

a. 8 ha and below b. 9 ha and below c. 10 ha and below d. AOTA e. NOTA

2. Which statement/s is/are true?

a. The Board shall submit to the Commission the ratings obtained by each candidate within ten (10) days after the examination,
unless extended for just cause. Upon the release of the results of the examination, the Board shall send by mail the rating received
by each examinee at his/her given address using the mailing envelope submitted during the examination. (RA 10915)

b. The Board shall submit to the Commission the ratings obtained by each candidate within twenty (20) days after the examination,
unless extended for just cause. Upon the release of the results of the examination, the Board shall send by mail the rating received
by each examinee at his given address using the mailing envelope submitted during the examination. (RA 8559)

c. To be qualified as having passed the Board examination for agricultural engineers, a candidate must obtain a weighted general
average of seventy percent (70%), with no grades lower than fifty-five percent (55%) in any given subject. However, an examinee
who obtains a weighted general average rating of seventy percent (70%) or higher but obtains a rating below fifty-five percent (55%)
in any given subject must take the examination in the subject or subjects where he obtained a grade below fifty-five percent (55%).

d. Both b and c

e. AOTA

3. The composition of the board (in Professional regulatory board of ABE) shall be appointed by

a. PSABE officers and board members

b. Senate President

c. Minority Floor leader

d. AIPO

e. NOTA

4. The professional identification card for ABE shall be renewed every ____ years

a. 3 b. 4 c. 5 c. 6 d. 7 e. NOTA
5.The creation and/or allocation of agricultural and biosystems engineer position shall be implemented by all concerned national
government units within ____ years.

a. 5 b. 6 c. 3 d.2 e. NOTA

6. In the logo of ABE, the sides of dodecagon represents what?

a. 12 founding members of ABE

b. 12 functional scope of practice of ABE

c. 12 important characteristics of being good ABE

d. 12 agencies/government entities that helps in implementation of ABE

e. It doesn’t mean anything

7. At least how many marginal farmers (majority of which are Agrarian Reform Beneficiaries) are needed in an agrarian reform areas
to organized an Agrarian Reform Cooperative.

a. 10 b. 15 c. 20 d. AOTA e. NOTA

8. Agrarian Reform Cooperatives shall be organized for any or all of the following purpose except;

a. To develop an appropriate system of land tenure, land development, land consolidation or land management in areas covered by
agrarian reform;

b.To coordinate and facilitate the dissemination of scientific methods of production and provide assistance in the processing,
storage, transport, and marketing of farm products for Agrarian Reform Beneficiaries and their immediate families, hereinafter
referred to as "beneficiaries

c. To provide financial facilities to beneficiaries for provident or production purposes at reasonable costs;

d. To arrange and facilitate the expeditious transfer of appropriate and suitable technology to beneficiaries and marginal farmers at
the lowest possible costs;

e. NOTA

9. It refers to the area subject to the coverage of Comprehensive Agrarian Reform Program (CARP)/Comprehensive Agrarian Reform
Program Extension with Reform (CARPER).

a. Agrarian Reform Area

b. Agrarian Reform Land

c. Agrarian Reform Extension Area

d. Agrarian Reform Subsidiary Land

10. Free Irrigation Service Act is also known as

a. RA 10937

b. RA 10618

c. RA 10906

d. RA 10951

e. RA 10969

1. Local government Units (LGU’s) are one of the government agencies that is responsible in the implementation of RA 10601
which is known as “agricultural and Fisheries mechanization act of 2016”. Which of the following is not true about this law?
a. The LGUs, shall undertake applied research, extension, dispersal, management and regulation of agricultural and
fisheries machinery and equipment, including the collection of fees.
b. The agricultural engineering division/section of the agriculture offices of the LGUs shall serve as the planning,
coordinating, regulating and implementing etc. of the projects.
c. The LGU shall encourage and assist in the organization of a private-led classification and accreditation system for
agricultural machinery assemblers, manufacturers, importers, suppliers, distributors and dealers.
d. AOTA e. NOTA
2. Which is the following is the function and responsibilities of ” Strengthening the Agricultural Engineering Groups of the
LGUs”?
a. Provide agricultural engineering services which include engineering survey, preparation and evaluation of plans,
designs, technical specifications etc.
b. Sell new agricultural and fishery machine in the market with warranty
c. Operate testing center with proper accreditation
d. Encourage other engineering profession to apply in LGU
e. NOTA

3. RA 10601. SEC. 30. Prohibited Acts. – It is unlawful for any person to: except

a. Sell, mortgage or lease agricultural and fishery machinery without being registered with the BAFE

b. Sell new agricultural and fishery machinery without warranty or after-sales service

c. Claim ownership to an agricultural and fishery machinery that has not been properly registered in his/her name

d. Kill former Ag. Engr.

e. AOTA

4. Engr. Pedro is a graduate of agricultural and Biosystems engineering in Harvard University in MANILA, Pili. After his board
exam, he found out that he failed to pass the licensure exam. After that, he planned to apply in the department of
agriculture to get a job. He was hired and assigned to the Regional agricultural engineering division (RAED). Is he prohibited
to apply RA 10915?

a. Yes d. I don’t know

b. No e. NOTa

c. Maybe

5. Dr. Pedro is a license civil engineer and worked in department of agriculture. Is he having the right to seal a Farm to market
road project from Department of agriculture?

a. Yes d. I don’t know

b. No e. NOTA

c. Maybe

6. Main purpose of mandanas Ruling?

a. To give LGUs a wealth c. Increased income of LGUs employer.

b. To strengthen the capability of LGUs to d. Both b and c


manage the public and private sector.
e. AOTA

7. What year mandanas ruling will start?

a. 2023 c. 2022

b. 2021 d. 2024

e. NOTA

8. Engr. MacArthur is a license ABE abroad and plans to conduct research related to agricultural and Biosystems here in
Philippines. Can he practice his profession here without agreement?

a. Yes c. Maybe

b. No d. I don’t know
e. AOTA

9. What laws covers the strengthening of the Agricultural and Biosystems engineering profession here in the country?

a. RA 10915 and RA 10601 c. RA 10915 and RA 8559

b. RA 10915 and RA 8759 d. AOTA

e. NOTA

10. Mang Jose plans to put an agricultural machinery manufacturing center. However lack of capital is one of his problems to
start up. What government agencies/programs will be able to help him to start a business?

a. DA

b. RAED

c. ACEF

d. LGU

e. NOTA
11. I will take an Agricultural and Biosystems Engineering Licensure Exam this year. What will happen to me if I get a score of 55, 55,
and 100 in Area 1, 2, and 3 respectively?

a. I will not take exam next year b. I will take exam next year c. I will retake the exam in All Area
d. I will retake exam in Area 1 and 2 e. NOTA

11. An Agricultural and Biosystems Engineer (ABE) either in public or private entities, who starts to practice his/her profession
as any of the various level ABE shall have the career progression in the following, except?
a. Professional Practice b. Industry Practice c. Teaching d. Research and Extension e. NOTA

12. The Technical Education and Skills Development Authority (TESDA) include in its program, the development and
promulgation of competency standards and training programs and regulations for agricultural and biosystems engineering
technicians and operators, in addition to the Training Regulations which are already promulgated and/or developed as
follows: except?
a. drying and milling operation NCIII b. biogas servicing NCII c. aquaculture system NCII
d. shielded metal arc welding NCII e. NOTA

13. He/she performs highly specialized or managerial/executive level of professional practice that requires specialized
cognitive, technical and research competence in agricultural and biosystems engineering.
a. Head ABE b. Senior ABE c. Chief ABE d. ABE (Engineer III) e. NOTA

5.The shape of Agricultural and Biosystems Engineer Seal was?


a. Circle b. Dodecagon c. Octagon d. Decagon e. NOTA

6.Mr. Humamihahamu Ho Haraharaharararay was a registered ABE. If he worked in building design and construction firm for 5 years.
Can he work as Building official?
a.yes, if he is a Filipino citizen with a good moral character
b.yes, if he is a member of a good standing of duly accredited organization for not less than 2 years.
c.yes, because of his work experienced d. AOTA E. NOTA

7.Maximum Total cost of a building in order to be exempted from payment of building permit fees.
a.10,000 b. 25,000 c. 30,000 d. 50,000 e. NOTA

8.They can erect, construct, alter, repair, move, convert or demolish any building structure without obtaining building permit.
a. private individual b. firm or corporation c. government agency d. instrumentality of the government e. NOTA

9.Building permit must be issued by the building official_______ from payment of the required fees by the applicant.
a. 10 working days b. 15 days c. 20 working days d. 30 days e.
NOTA

10.Group in occupancy classification that agricultural buildings occupants are classified.


a. Group D b. Group G c. Group J d. Group M e. NOTA

11.The quality of drinking water from meteoric, surface and underground sources shall conform to the criteria of?
a. National Standards of Drinking Water b. Water Code of the Philippines
c. Waterworks System Standards of the Philippines d. Water Quality Code e. NOTA

12.The design, construction and operation of deep wells for abstraction of ground water shall be subjected to the provision of?
a. National Standards of Drinking Water b. Water Code of the Philippines
c. Local or Municipal Waterworks System d. Water Quality Code e. NOTA

13.An agricultural building has 57 employees. What will be the minimum width of the stairways to conform in the National Building
Code?
a. 900mm b. 100 cm c. 1.1 m d. 1.5 m e. NOTA

14.Maximum rise and minimum run of every step of an stairway respectively?


a. 200mm & 250mm b. 210mm & 250mm c. 220mm & 240 mm d. 210mm & 240mm e. NOTA

15.An agricultural building has 49 employees. What will be the minimum width of the stairways to conform in the National Building
Code?
a. 850mm b. 900 mm c. 950 mm d. 1000 mm e. NOTA

16.Minimum width of an aisle that serving only one side?


a. 850mm b. 900 mm c. 950 mm d. 1000 mm e. NOTA

17. Minimum width of an aisle that serving both side?


a. 1000 mm b. 1200 mm c. 1250 mm d. 1500 mm e. NOTA

18.The following are protection to pedestrians, except?


a. Marquees b. Railings c. Fences d. Canopies e. NOTA

19.Which of the following is not true about veneer to comply in NBC of the Philippines?
a. Veneer shall support its own weight only b. anchored veneer shall resist horizontal forces c. Adhered veneer shall
bond to the supporting elements d. AOTA e. NOTA

20.Flashing and counter flashing shall be provided at?


a. horizontal and vertical surface of the roof b. horizontal surface and juncture of the roof
c. vertical surface and juncture of the roof
d. horizontal and vertical surfaces and juncture of the roof e. NOTA

1. All municipalities and cities must have a municipal and city agriculturists respectively.
A. True B. False C. Either/Optional D. Neither E. NOTA
2. All provincial government must have a provincial agriculturist.
A. True B. False C. Either/Optional D. Neither E. NOTA
3. At least how many years should be the acquired experience in agriculture related field to qualify as a city agriculturist.
A. 3 years B. 4 years C. 5 years D. 6 years E. NOTA
4. At least how many years should be the acquired experience in agriculture related field to qualify as a municipal agriculturist.
A. 3 years B. 4 years C. 5 years D. 6 years E. NOTA
5. Provincial agriculturist must have practiced his profession in agriculture and acquired experience in a related field for at
least five (5) years.
A. True B. False C. Either/Optional D. Neither E. NOTA
6. The Professional Regulatory Board of Agricultural and Biosystems Engineering have the following powers and duties except.
A. Supervise the registration, licensure and practice of agricultural and biosystems engineering in the Philippines.
B. Administer oaths of successful examinees entering the practice of agricultural and biosystems engineering.
C. Issue, suspend or revoke the license for the practice of agricultural and biosystems engineering profession.
D. Prescribe guidelines in the CPD program for agricultural and biosystems engineers in coordination with the AIPO of
Agricultural and Biosystems Engineers.
E. NOTA
7. Who principally authored RA 7160 or the Local Government Code of 1991.
A. Jovito Salonga B. Aquilino Pimentel Jr. C. Teofisto Gingona
D. Juan Ponce Enrile E. NOTA
8. AIPO refers to the professional organization of agricultural and biosystems engineers duly accredited by the Professional
Regulatory Board of Agricultural and Biosystems Engineering and the PRC. AIPO means?
A. Accredited Integrated Policy Organization B. Accredited Integrated Professional Organization C.
Accredited Internal Policy Oranization D. Accredited Internal Professional Organization
E. NOTA
9. Certificate of Registration can be revoked or suspended as well as Temporary/Special Permit (TSP) can be cancelled if there
is an unjustified or unexplained neglect or failure to pay the annual registration fees for how many consecutive years.
A. 2 B. 3 C. 4 D. 5 E. NOTA
10. The following are local chief executives except.
A. Punong Barangay B. City/Municipal Mayor C. Governor
D. Congressman D. NOTA

1. Fine for the person who violate the R.A 10915


a. Fine of not less than P100 000 but not more than P500 000
b. Imprisonment of not less than 6 months but not more than 6 years
c. Community service of 1440 hours
d. Both A and B
e. None of the above
2. Any foreign Nationality practicing Agricultural and Bio system Engineer shall be limited due to this Law
a. RA 8981 (PRC modernization Act)
b. 2017 Revised Rule and Regulations in Administrative Investigation
c. RA 10912 (Continuing Professional Development Act of 2016)
d. All of the above
e. None of the above
3. A person can be removed as a board member due to:
a. Gross neglect, incompetence, or dishonesty in the discharge of duty
b. Violation or tolerance of the violation of this act or Code of Ethics for ABE
c. Final judgement for crimes involving moral turpitude
d. Unprofessional, unethical, immoral or dishonorable conduct
e. All of the above
4. This is/are power, function and duties of the board
a. Accreditation of specialty organization
b. Approve, issue, limit or revoke temporary/special permit to practice ABE
c. Issue the certificate of registration to successful examinees
d. All of the above
e. None of the above
5. These is/are qualification of Members of the board.
a. At least 30 years old
b. He/she had a connection with review center
c. Has never been convicted of any offense involving moral turpitude
d. All of the above
e. None of the above
6. What is agrarian reform
a. It refers to land devoted to agricultural activity
b. Refers to redistribution of land to the landless farmers
c. A land which is capable of agricultural activity
d. Controversies relating of land acquired under R.A. 6657
e. None of the above
7. Who is/are beneficiary of the CARP law
a. Anyone b. A graduate of Agriculture c. farmer with less than 3 hectares d. Aota e. Nota
8. Which is/are land covered by the CARP
a. Not classified as forest/mineral land
b. Land owned by the government devoted for agriculture
c. All private land devoted to or suitable for agriculture
d. All of the above
e. None of the above
9. These is/are the Phase One Priorities of Department of Agrarian Reform
a. All public agricultural lands which are to be opened for new development and resettlement
b. Private land offered by owners for Agrarian reform
c. All private land in excess with 50 hectares
d. Both A and C e. NONE OF THE ABOVE
10. A person who is can be a beneficiary under CARP law can submit his requirements
a. Barangay Agrarian Reform Committee
b. Municipal Agrarian Reform Committee
c. Regional Agrarian Reform Committee
d. National Agrarian Reform Committee
e. Nota
11. A person who offers a 25hectares land can get an initial compensation of
a. 25% cash and the remaining are to be paid by government financial instrument at any time
b. 30% cash and the remaining are to be paid by government financial instrument at any time
c. 35% cash and the remaining are to be paid by government financial instrument at any time
d. 40% cash and the remaining are to be paid by government financial instrument at any time
e. NOTA
12. A person who offers a 50hectares land can get an initial compensation of
a. 25% cash and the remaining are to be paid by government financial instrument at any time
b. 30% cash and the remaining are to be paid by government financial instrument at any time
c. 35% cash and the remaining are to be paid by government financial instrument at any time
d. 40% cash and the remaining are to be paid by government financial instrument at any time
e. NOTA
13. If a person is a beneficiary of CARP Law, he can own a land through
a. Paying the amount of the market value of a certain land
b. Hire a lawyer to transfer the legal document for transfer of ownership
c. Paying a certain percentage of annual gross income to the Land Bank
d. All of the above
e. Nota
14. What is/are the task of DAR in this Law after granting farmer as beneficiary
a. Monitoring the record or performance of the beneficiary
b. Forfeit the right of beneficiary if he commits guilty of negligence or misuse of the land
c. Conduct seminar and training for Agricultural mechanization for the farmers
d. All of the above
e. Nota
15. Percentage allocation of DAR in support and services for the farmer-beneficiary
a. 25% b. 30% c.35% d. 50% e. NOTA

You might also like