Professional Documents
Culture Documents
Highway Alignment
Vertical Alignment
Bad Combinations of
Horizontal and Vertical Curvature
http://4.bp.blogspot.com/-XGSJulNYVnE/VJV-IkbwpEI/AAAAAAAAGcI/Wt6MkB_SbCo/s1600/Kontur.jpg
Outline of Steps in Determining Outline of Steps in Determining
a Potential Horizontal Alignment a Potential Horizontal Alignment
R = V2/127(e+f)
Dij Ti + Tj
A B
A B
Urban Road Right of Way (RoW)
Sight Distance
on Curve
Widening on Curve
Superelevation
Diagram
Stationing
8/17/2020 11:57 AM 32
Frontage Road
8/17/2020 11:57 AM 33
8/17/2020 11:57 AM 37
cs
Azimuth, angle & distance
t b tw tw b t Minimum radius on curve
ms ms
Type of curve (FC/SCS/SS)
Kelas jalan II (JP)
Fungsi jalan Arteri Primer Sight distance on curve
Kecepatan rencana (kph) 60 Widening on curve
Kendaraan rencana WB-15
Tipe jalan 4/2D Superelevation diagram
Lebar satu lajur (m) 3,00 Stationing
Lebar trotoar/t (m) 1,50
Lebar bahu/lajur parkir/b (m) 1,00
Design drawing
Lebar median/cs (m) 6,00
Jalur tepian/ms (m) 0,50
Trase Jalan Azimuth (AZ), Intersection Angle (D),
distance between PI (d)
https://journals.lib.unb.ca/journalimages/JFE/2005/Vol_16/No_02/arugaOE1.JPG
1 -9,247.93 3,445.32
2 -9,242.96 3,730.27
3 -9,042.55 4,099.38
10 -7,017.21 5,366.79
Urban, max = 6%
2% 2%
Radius vs superelevation
[RSNI T-14-2004, t13 p29]
Normal Cross-Fall (NC-2%)
≥2%
≥2%
Superelevation
Runoff
Tangent
Runout
(TR)
TC
CS
2. Spiral-Circle-Spiral (SCS)
SC
TS
PI ST
SS
3. Spiral-Spiral (SS)
TS ST
90 3.000 50 1.200
80 2.500 40 800
70 2.000 30 500
Minimum radii not required transition Minimum radii not required superelevation
section [038/TBM/1997 p30 tII18] [038/TBM/1997, p.31]
80 900 30 130
60 500 20 60
TC CT
R R
D
Full Circle (FC) curve 1/3 Full Circle (FC) curve 2/3
Superelevation
Runoff
Tangent
Runout
(TR)
Lc
Ls’ Ls’ Tangent Runout Length (TR)
[AASHTO eq.3-26 p.179 & eq.3-31 p.191]
Tangent Tangent
Runout (TR) Runout (TR) ݁
ܮ௧ = ܮ
݁ௗ ௦
• Lt = tangent runout length (m)
Superelevation Runoff Superelevation Runoff • en = normal cross slope rate (%)
• ed = design superelevation rate (%)
• Ls = tangent runoff length (m)
If PI & P2 FC
Tikungan majemuk searah
dij Ti (+TR+2/3Ls) + Tj (+ TR+2/3Ls)
Maximum distance between curve
Tikungan majemuk balik arah [038/TBM/1997, p.27]
140 5.850
120 5.000
100 4.200
80 3.350
60 2.500
Tikungan majemuk balik arah Transition curve (spiral)
[007/BM/2009, p.49]
To provide a natural, easy-to-follow path for
the driver to negotiate, where centrifugal
force increase/decrease gradually.
Superelevation
Runoff
Tangent
Runout
(TR)
JP JAK JBH/JT
Waktu Tempuh t.14, h.30 p.II.8, h.29 t.23, h.34-35
Kelandaian - p.II.10, h.28- t.24, h.35
Melintang 29
t.II.17, h.30
Gaya - p.II.9, h.29 t.25, h.36
Sentrifugal
Kelandaian t.15, h.30-31 - t.26, h.36-37
Relatif
p Min & Maks - - h.42
Kph JP JAK JBH/JT
Panjang Lengkung Peralihan 120 100 67
berdasarkan Waktu Tempuh Panjang 110 92
lengkung 100 56 83 56
ܸோ 90 50 75
ܮ௦ = ݐ peralihan
3,6 80 44 67 44
berdasarkan 70 39 58
dengan,
waktu 60 33 50 33
VR = kecepatan rencana (kph) 50 28 42
tempuh
t = waktu tempuh pada lengkung peralihan 40 22 33
30 17 25
JP: 2 detik (RSNI 2004, h.30) 20 17
JAK: 3 detik (038/TBM/1997, h.29) Keterangan:
JP: Jalan Perkotaan (RSNI 2004)
JBH/JT: 2 detik (007/BM/2009, h.34-35) JAK: Jalan Antar Kota (038/TBM/1997)
LS = panjang lengkung peralihan (m) JBH/JT: Jalan Bebas Hambatan/Tol (007/BM/2009)
if RFC = RSCS
then TFC < TSCS
FC SCS
Comparison of FC vs SCS Comparison of FC vs SCS
tangent length 1/2 tangent length 2/2
Ts
T
Spiral-Circle-Spiral (SCS)
s (90 )( Ls )
R
c 2s
Lc Rc 25m
180
Ltotal Lc 2 Ls
Spiral-Circle-Spiral (SCS) Spiral-Circle-Spiral (SCS)
4 8
X L[1 ( L 2) (
L )] 2 4
40 R 2 Ls 3456 R 4 Ls 4 Xs Ls[1 ( Ls 2 ) ( Ls )]
40 R 3456 R 4
3 4 8
Y L [1 ( L 2 2 ) (L )] Ys Ls
2
[1 ( Ls
2
Ls 4
6 RLs 56 R Ls 7.040 R 4 Ls 4 6R 56 R 2) (
7040 R 4
)]
K Xs R sin s
P Ys R (1 cos s )
Tangent
Ts Runout
Tangent Tangent
Runout (TR) Runout (TR) (TR)
Superelevation
Runoff
Ts Superelevation
Superelevation Runoff Superelevation Runoff
Runoff
Tangent
Runout
(TR)
Comparison of SCS vs SS
Check dij Ti (+TR) + Tj (+TR) !!! tangent length 1/2
Ts
Comparison of SCS vs SS
tangent length 2/2
Ts
Ts Ts
4 8
X L[1 ( L ) (L )] 2 4
2
40 R Ls 2
3456 R 4 Ls 4 Xs Ls[1 ( Ls 2 ) ( Ls )]
40 R 3456 R 4
3 4 8
Y L [1 ( L 2 2 ) (L )] Ys Ls
2
[1 ( Ls
2
) ( Ls
4
6 RLs 56 R Ls 7.040 R 4 Ls 4 6R 56 R 2
7040 R 4
)]
Spiral-Spiral (SS) Spiral-Spiral (SS)
Ts [( R P ) tan ] K Es [( R P ) sec ] R
2 2
K Xs R sin s
P Ys R (1 cos s )
Tangent Tangent
Check dij Ti (+TR) + Tj (+TR) !!!
Runout (TR) Runout (TR)
SS
PSD d1 d 2 d 3 d 4 PSDmin 2 d 2 d 3 d 4
3
V2
SSD 0,278 V t 0,039
a
V2
SSD 0,694 V 0,00394
(WSDOT Design Manual M 22-01.06 December 2009)
f g
Minimum Stopping Sight Distance Minimum Stopping Sight Distance
[Table 10 p. 23 RSNI 2004] [Table 10 p. 23 AASHTO 2004]
100 185 60 85
90 160 50 65
80 130 40 50
70 105 30 35
V2
SSD 0,694 V 0,00394
f g
Minimum Passing Sight Distance Minimum Stopping Sight Distance
[Table II.11 p. 21-22 038/TBM/1997] [Table 13 p. 23-24 007/BM/2009]
V2
SSD 0,278 V t 0,039
a
V2
SSD 0,278 V t
a
254 g
9,81
Required Clearance for Sight Distance
on Horizontal Curves Sight Distance on Horizontal Curve
(Highway Engineering 1st ed, Martin Rogers)
28,65S
M R [1 cos( )]
S S R
S
[007/BM/2009 p. 25]
Sight Distance on Horizontal Curve Sight Distance on
(S > L) Horizontal and Vertical Alignment
28,65S 28,65S
M R [1 cos( )] 0,5(S L) sin( )
S S R R
S S
[007/BM/2009 p. 26]
W = Wc – Wn
• W = Widening (m) 0.60m
• Wc = Width of traveled way on curve (m)
• Wn = Width of traveled way on tangent (m)
Adjustments:
• 6 lane 2 way Wc x 1.5
• 8 lane 2 way Wc x 2.0
TS SC CS ST
emax
cl
en
emax
Ls Lc Ls
Stationing
PI 1 … n Ls Kelandaian relatif m
o
Sudut Ls p min m
Jarak sebelah kiri m Ls p max m
Jarak sebelah kanan m Ls SS m
Jenis Lengkung (FC/SCS/SS)
Ls Renc ana m
R renc ana m o
qs
e renc ana % o
qc
Ls Waktu tempuh m
Lc m
Ls K emiringan melintang m
L Total m
Ls Gaya sentrifugal m
L Min m
Ls Kelandaian relatif m
Xs m
Ls p min m
Ys m
Ls p max m
K m
Ls SS m
P m
Ls Renc ana m
o
E m
qs
o
M m
qc
T m
Lc m
Tangent Runout (TR) m
L Total m
T+TR m
L Min m
Jarak Pandang di Tikungan
Xs m
Jarak Pandang (SSD/PSD) m
Ys m
Tipe (S<L / S>L)
K m
Jarak bebas tersedia (Msite) m
P m
Radius sumbu lajur terdalam (Rs) m
E m
Jarak bebas diperlukan (Ms) m
M m
P elebaran di Tikungan m
T m
Stationing
Tangent Runout (TR) m
Start
T+TR m TC/TS
Jarak Pandang di Tikungan SC
Jarak P andang (SSD/P SD) m SS
Tipe (S<L / S>L) PI
CS
Jarak bebas tersedia (Msite) m
CT/ST
Radius sumbu lajur terdalam (Rs) m End