You are on page 1of 79

thickness

GA 0.1
2SF
0.1
3SF
Total
NO. of C
CF1 2
CF2 4
F2 2
F2A 2
F2B 2
F1 2
TO

Dimensions
a
C1 0.3
C2 0.3
C3 0.3
C4 0.3
C5 0.3
C6 0.3
C7 0.3
C8 0.3
C9 0.3
C10 0.3
C11 0.3
C12 0.3
C13 0.3
C14 0.3
C15 0.3
C16 0.3
C17 0.3
C18 0.3
C19 0.3
C20 0.3
C21 0.3
C22 0.3
C23 0.3
C24 0.3
C25 0.3
C26 0.3
TOTAL
L
1F IWC 76.968
2F IWC 76.968
RWC 2.28
CWF 83.68
T
W
1Fl CHB 87.9
2Fl CHB 87.9
RF CHB 36.95
Total

Area
Front wall 17.118
Total Wall Area 671.5288
TOTAL CHB
7478

a
2G-1 - 2G-2 0.25
2Fl
2B-1 0.2
2Fl
FTB-1 0.3
2G-1 - 2G-2 0.25
2RF
2B-1 0.2
SLAB
Area Volume
273.9134 27.39134
224.172 22.4172
198.901 19.8901
69.69864
Footing

L W
2.2 5.6
2.6 5.8
2.2 2.2
2.4 2.4
2 2
1.6 1.6
TOTAL

Column
Dimensions
b H
0.3 8.5
0.3 8.5
0.3 9.7
0.3 9.7
0.3 8.5
0.3 8.5
0.3 7.3
0.3 7.3
0.3 7.3
0.3 7.3
0.3 7.3
0.3 7.3
0.3 7.3
0.3 7.3
0.3 9.7
0.3 9.7
0.3 7.3
0.3 7.3
0.3 8.5
0.3 8.5
0.3 8.5
0.3 9.7
0.3 9.7
0.3 7.3
0.3 9.7
0.3 9.7
TOTAL
Wall
Concrete
W t
2.8 0.125
2.8 0.125
2.6 0.15
0.25 0.225
Total
H A
3.552 312.2208
2.8 246.12
2.6 96.07
Total

Cement Mortar
No. of CHB
Cement (bags)
214 27
Concrete
b L
0.4 163.69
0.4 32.52
0.4 76.23
0.4 163.69
0.4 32.52
Total

Plaster f
Height Perimeter
8.4 1.2
7.2 1.2
6 1.2
Total
B
Concrete (bags) Sand (cu.m)
246.52206 1.369567
201.7548 1.12086
179.0109 0.994505
628 3.49
Footing

T Volume
0.6 14.784
0.6 36.192
0.6 5.808
0.6 6.912
0.6 4.8
0.6 3.072
71.568

Column

Volume Concrete (bags)


0.765 6.885
0.765 6.885
0.873 7.857
0.873 7.857
0.765 6.885
0.765 6.885
0.657 5.913
0.657 5.913
0.657 5.913
0.657 5.913
0.657 5.913
0.657 5.913
0.657 5.913
0.657 5.913
0.873 7.857
0.873 7.857
0.657 5.913
0.657 5.913
0.765 6.885
0.765 6.885
0.765 6.885
0.873 7.857
0.873 7.857
0.657 5.913
0.873 7.857
0.873 7.857
19.566 177
Wall
Concrete
Volume Concrete (bags)
26.9388 242.4492
26.9388 242.4492
0.8892 8.0028
4.707 42.363
59.4738 536

CHB
Area Total (minus
the windos &
doors) No. of CHB
277.2358 3465.4475
211.135 2639.1875
92.71 1158.875
581.0808 7264

ment Mortar Plaster


Sand (cu.m.) At
1.4447592 34.236
Beam
Concrete
Volume Concrete (bags)
16.369 147.321
2.6016 23.4144
9.1476 82.3284
16.369 147.321
2.6016 23.4144
47.0888 423.7992

Plaster for column


Area Volume
10.08 0.4032
8.64 0.3456
7.2 0.288
Total
Slab
Footing
Wall Concrete
Beam
Column
CHB
Overall Total
Gravel (cu.m)
27.39134
22.4172
19.8901
69.7
Concrete (bags) Sand (cu.m)
133.056 7.392
325.728 18.096
52.272 2.904
62.208 3.456
43.2 2.4
27.648 1.536
645 35.784

Sand (cu.m) Gravel ( cu.m)


0.3825 0.765
0.3825 0.765
0.4365 0.873
0.4365 0.873
0.3825 0.765
0.3825 0.765
0.3285 0.657
0.3285 0.657
0.3285 0.657
0.3285 0.657
0.3285 0.657
0.3285 0.657
0.3285 0.657
0.3285 0.657
0.4365 0.873
0.4365 0.873
0.3285 0.657
0.3285 0.657
0.3825 0.765
0.3825 0.765
0.3825 0.765
0.4365 0.873
0.4365 0.873
0.3285 0.657
0.4365 0.873
0.4365 0.873
9.783 19.566
Sand (cu.m) Gravel ( cu.m)
13.4694 26.9388
13.4694 26.9388
0.4446 0.8892
2.3535 4.707
29.7369 59.4738
Cement Mortar
Cement (bags) Sand (cu.m.)
476.4489408 26.35143552
375.57912 20.772528
146.60282 8.108308
999 55.233

Plaster
Cement (bags) Sand (cu.m.)
10 0.547776
Beam

Sand (cu.m) Gravel (cu.m)


0.81845 16.369
0.13008 2.6016
0.45738 9.1476
0.81845 16.369
0.13008 2.6016
2.35444 47.0888
Cement (bags) Sand (cu.m.)
7.2576 0.4032
6.2208 0.3456
5.184 0.288
19 1.037
summary
Total
Concrete (bags) Sand
929 249.701
645 35.784
536 29.7369
852.7992 26.15944
196 9.783
1375 76.0515352
4534 427.2158752
Mortar Slab
Area Cement (bags)
696.9864 301
Gravel (cu.m)
14.784
36.192
5.808
6.912
4.8
3.072
71.568
Plaster
At Cement (bags)
492.24 141.76512
492.24 141.76512
192.14 55.33632
1176.62 339
Plaster
Perimeter Area
1.3 212.797
1.2 39.024
1.2 91.476
1.3 212.797
1.2 39.024
Gravel
69.7
71.568
59.4738
47.0888
20.603
-
268.4336
Sand (cu.m.)
246.211 Slab
Bathroom
Sand (cu.m.)
7.87584
7.87584
3.07424
18.826
Plaster
Volume Cement (bags)
8.51188 153.21384
1.56096 28.09728
3.65904 65.86272
8.51188 153.21384
1.56096 28.09728
429
Area of standard
Area
tile use
441.611 0.093
142.912 0.041
Sand (cu.m.)
8.51188
1.56096
3.65904
8.51188
1.56096
23.805
Tiles
No. of tiles
4749 12"x12 "
3486 8"x8'
Wood Fram
Total Area
696.9864
10.8
8.64
7.2

Scaffolding
Number of
Column

8
7
9
Members Volume
Slab 69.69864
Footing 71.568
Column 19.566
Beam 47.0888
Total
Area
Wall 671.5288

diameter bars
10
12
16
20
Formworks

Wood Frame
Number of
Total Area divided by:
Plywoood
2.88 242.00916666667
2.88 3.75
2.88 3
2.88 2.5
Total 252

Scaffolding
Total height
Height
(TL)

8.4 67.2
7.2 50.4
6 54
Total

Total 2x2" Total 2x3"


7454.859475 1201.2
3603.6
2007.72
13066.179475
Rebars
10% Volume Weight
6.969864 54713.4324
7.1568 56180.88
1.9566 15359.31
4.70888 36964.708
tal 163218.3304
Vertical Bar Horizontal Bar
1074.44608 1443.78692

bars
81609.1652
16321.83304
48965.49912
16741.83304
orks

2x2" lumber
(x29.67)
7180.411975
111.2625
89.01
74.175
7454.859475
Vertical Support
2x3"
(TL x 7 from
book )
470.4
352.8
378
1201.2

Assorted Nails
865.6059475
360.36
200.772
1426.7379475
Tie Wire

1094.268648
1123.6176
307.1862
739.29416
3264.366608
Total SBL
2518.233
Assorted Nails
718.0411975
11.12625
8.901
7.4175
745.4859475
Horizontal Support
2x2"
(TL x 21, from
book)
1411.2
1058.4
1134
3603.6
Total No. of Bars
420
Diagonal Bracing
2x2"
(TL x 11.7, from
book)
786.24
589.68
631.8
2007.72
Tiles
Area