You are on page 1of 2

No Description

Equipment
Filling pup trial with Ultrasonic Flow Meter (UFM) (calibration certificate expired
1 on Jul 21)

2 Pressure pump has been repaired


Additional Weighing scale to be considered for foam pig weighing during drying
3
(ORF & GOP)
4 DO Meter to be consider

5 KSB pump repair to be expedite to reduce filling water duration and existing
manifold to be modify
Compressor with flow rate > 1000 CFM; with 15 Barg SPJ (only for 1 week
6
duration) to be revisit for pigging at ORF
Compressor at least 100 CFM flow to be provided at GOP for driving chemical
7 injection pump

8 Air Dryer flow rate > 1000 CFM during drying SPJ to be revise
Hydraulic Torque wrench M 65 to be provided during SDV installation WO has
9
been issued to CMP
10 Dew point meter will be provided by Teknik Nusantara (max 2 days duration)
11 Air Compressor 920 CFM for Chemical injection pump
Consumable
1 Additional Chemical (corrosion inhibitor) arrival to be expedite
2 Pig available :
Pig medium Density 8 EA
Pig low density 9 EA
New Bidi pig 1, Spare seal 2 Set Used 2 Pcs
Poly Pig 1 New and 3 Used (1 still in good condition recommend to use for
flooding)
3 Gauging Plate 3 Pcs
Nitrogen for Purging Gas Line awaiting instruction for mobilization WO has been
4 issued to Aneka gas, Additional WO with pigging scheme during drying to
accelerate reaching O2 content target will be required.

5 Seal pig door (QOC) 2 pcs remaining; to be considered to have additional 2 spare
more
Spare Gasket 12 Pcs 20” for SDV, and interchange blind spade and spacer has
6
been received at site and consider to relocate at TSF from warehouse
7 Insulation gasket to be relocate to TSF
N2 bottle to be provided for leak test SDV and Pig launcher portion at GOP SPB to
8 be issued.

Remaining pipeline portion at ORF that not leak tested yet, Considering using N2
9 bottle or ISO tank with booster pump.
Status Action

Filling pump already trial


UFM need to be re-calibrated Anggi

Done Anggi

Available Site Anggi

EHS

Khafidz

Khafidz

Will be send to Barge Before


Rudi/Anggi
conduct Hydrostatic Test
Khafidz

Khafidz

After Hydrotest Pipeline Khafidz


Available at PH or Proceed SPJ Anggi

Available Site 12 drum Khafidz

Available Site Anggi


Available Site Anggi
Available Site 5 ea spare seal Anggi

Available Site Anggi

Available Site Anggi

Khafidz

Process SPB Anggi

Process Mobilization to TSF Pranto/Anggi

Process Mobilization to TSF Pranto/Anggi

Process SPB Khafidz

Khafidz