You are on page 1of 12

Job No. Document No. Rev.

PROPOSAL PROP-BPK-CIV-001 00

SHEET 1 OF 8

SALAK BRINE HEAT RECOVERY BINARY POWER PLANT

METHODOLOGY AND EXECUTION PLAN

METODE LAND CLEARING

Issue Record

00 15 Jul 2021 Issued for Construction Nurul Huda


By Date
Rev Date Reason for Issue Prepared Checked Approved
No. Client
EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

REVISION HISTORY

Amendment Revision Amender Name Amendment


Date Number
15 JUL 2021 00 Nurul Huda Issued for Review

PROP-BPK-CIV-001 Page 2 of 12 Rev. 00


EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

TABLE OF CONTENTS

1. UNDERSTANDING LAND CLEARING..................................................................................................... 4


2. LAND CLEARING EQUIPMENT............................................................................................................... 4
3. LAND CLEARING PROCESS.................................................................................................................. 5
4. LAND CLEARING WORKING METHOD.................................................................................................. 6
5. FACTOR THAT AFFECT LAND CLEARING............................................................................................ 9

PROF-BPK-PRO-CIV-001 Page 3 of 12 Rev. 00


EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

1. Understanding Land Clearing

       Land clearing work is a site job to be estimated or in other words an "exact" job,
because the amount of production is erratic and the work is one to the other. The
equipment used and the way chosen for this land clearing job determines the amount
of production.

2. Land Clearing Equipment

Various equipment that can be used in land clearing work can be seen in the table
below

Flat cropping Immersion


with the face of the tree inside
Demolition ground land with Diurug dengan
Area Root or on it Blow tanah.

MEDIUM CLEANING (tree diameter 5-20 cm).

Chainsaw, Axe, Large disc


1-4 Ha Blade Bulldozer Chainsaw Machine.. Blade Bulldozer plows, torn discs

HEAVY CLEANING : (tree diameter > 20 cm)

Chainsaw, Axe,
1-4 Ha Blade Bulldozer Chainsaw Machine.. Blade Bulldozer

The right and correct method of work will greatly affect the productivity of the tool,
to determine which method is appropriate depending on many factors such as the
volume/specification of the project and the time available..

PROF-BPK-PRO-CIV-001 Page 4 of 12 Rev. 00


EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

3. Land Clearing Process

In the process of land clearing, common things include:

a. Underbrushing

Is an activity that leads to the repair of trees with a maximum diameter of 30


cm with the aim to facilitate the implementation..

b. Felling / Cutting

PROF-BPK-PRO-CIV-001 Page 5 of 12 Rev. 00


EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

Is a tree felling activity that is more than 30 cm in diameter..

c. StockPilling of Log

The activity of collecting the timbers which are then collected into piles of
wood at a certain distance, it is necessary to note the existence of a pile path
that corresponds to the direction of the wind.

4. Land Clearing Working Method

To determine which motode is most appropriate depends on many factors such as


project volume/specifications and available time..

PROF-BPK-PRO-CIV-001 Page 6 of 12 Rev. 00


EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

 Methods The overthrow and slashing


This method is carried out simultaneously , for this activity is known by several
methods , including the following:

a. Perimeter Method / Deep Snail Method

Suitable applied to the area average, after the plot area to be opened has been
determined , then the bulldozer began to cut down or uproot the tree , from the
outside heading into , around the plot area with motion bulldozer bedrlawanan
with needle clock.

b. Methods Out Crop / methods Snails Affairs

Same as methods perimeter, the difference lies in the movement of the


bulldozer , the method is slashing / overthrow starting from the middle of the plot
area leading out to the motion of the bulldozer in the direction of the needle
hour.

c. Contour Method
PROF-BPK-PRO-CIV-001 Page 7 of 12 Rev. 00
EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

The method is applied to the area is hilly , bulldoer cut down , cut down on ats
hill to the bottom in the area with an altitude that is equal (contour that is the
same).

d. Zigzag Method

Just like the perimeter and out crop methods , the ig zag method can be applied
to flat areas.

e. Piling Stacking Method


PROF-BPK-PRO-CIV-001 Page 8 of 12 Rev. 00
EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

Generally, the results of felling trees , branches ditumpukan lengthwise direction


of the direction of wind and follow the line of contour, the distance demolished
bulldozers approximately 15-20 m, so that later on within stacks of each other
be approximately 30-50 m.

f. Harroing Method / Threaded Spring Method

One of the methods that have the efficiency of work the highest , the method is
having the efficiency of work 98,8 %.

PROF-BPK-PRO-CIV-001 Page 9 of 12 Rev. 00


EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

5. Factors That Influence Of Land Clearing

Faktor-faktor berikut menurut pengalaman pengaruhnya besar terhadap aktivitas


dan produktivitas land clearing:

a. Kelebatan pepohonan

According to experience, the following factors have a major influence on land


clearing activities and productivity:

 Number of trees
 Size of the trees
 The violence
 Root state
 Clump-clump that exist.

b. Land Use After Work

Should we consider whether the purpose of the land clearing is later , for
example, to the benefit of making dams, roads highway or for the purposes
of another. Because of the things referred to will be a material consideration
in choosing a method and apparatus are used to work land clearing.

c. Circumstances and Power Support Land

Factors state of the ground and the power capacity of the soil also must we
consider , including the factors of this are:

PROF-BPK-PRO-CIV-001 Page 10 of 12 Rev. 00


EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

 The thickness of the top soil.


 Type / type of soil that exists .
 Water content in the soil
 Rock state
d. Topography

Including the factors topographic them are:

 Field slope .
 Channels that exist .
 Swamp - marsh are there .
 Big rock .
 Hill..

Circumstances topoagrafi referred very influential on the equipment that is


used in land clearing.

e. Climate and Rain Conditions

Usually all phases of employment land clearing, influenced also by the


difference / change in temperature and rainfall that fell during work land
clearing implemented.

f. Job Specifics
Factors specifically is among others can depend on the terms / conditions
of the following :

 Size of the work area .


 Completion of the work that is done .

PROF-BPK-PRO-CIV-001 Page 11 of 12 Rev. 00


EPC of Pumping System for transporting biodiesel at benete area
Civil Work Procedure

 Disposal of former clearing. Soil conservation .


 And other factors ..

PROF-BPK-PRO-CIV-001 Page 12 of 12 Rev. 00