M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1

PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700


105

FORM 1
for

PROPOSED 5 STAR HOTEL & SERVICED


APARTMENT
AT PREMISES NUMBER 4A, J B S HALDEN AVENUE KOLKATA- 700 105. P.S.: PRAGATI MAIDAN.
DISTRICT: 24 PGN. (SOUTH).

SUBMITTED TO
STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY,
GOVT. OF WEST BENGAL

PROJECT PROPONENT
FABWORTH PROMOTERS PRIVATE LIMITED

IT-9, Ninth Floor, “Mani Square”

164/1, Manicktala Main Road, Kolkata- 700 054

Page 1 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

FORM 1

(I) BASIC INFORMATION


Sl. Item Detail
No.
1. Name of the projects/s PROPOSED 5 STAR HOTEL & SERVICE
APARTMENT
2. Sl. No. in the schedule Sl. No. 8 (a)
3. Proposed capacity / area / Proposed addition of 17002.46 Sqmt. principally
length/tonnage / to be handled/ at 2 nos. Mezzanine floors and Ground level
command area/ lease area/ number of Service areas like Sub-Station, Gate Goomty, Gas
wells to be drilled Bank etc.
Proposed No. of Rooms:
Hotel: 281;
Serviced Apartment: 208
Up to date project Cost: Rs. 1200 Cores.
4. New/ Expansion/Modernization Expansion
5. Existing Capacity/ Area etc. • Type of Project : 5 STAR CATEGORY
HOTEL
• Area of Land : 22711.11
m2(5.611 Acre); (22.71Ha)
• Built up area: 88924.17m2

Project Configuration:
3 level combined Basements + Combined
(Ground + Mezzanine 1 + First + Mezzanine 2 +
Second Floor) at upper levels for services and
Restaurant, Banquets, Bars, Nite Club, , Health
Club & SPA, Gymnasium, meeting room etc.
+ 1 Tower from 3rd - 23rd floors for Hotel
+ 1 Tower from 3rd- 28th floors for Serviced
Apartment.

Room/Apartment wise capacity:


Hotel:-
• No. of Rooms: 298
Serviced Apartment:-
• No. of Rooms: 196

6. Category of Projects i.e. ‘A’ of ‘B’ Category B

Page 2 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

Sl. Item Details


No.
7. Dose it attract the general condition? If No
Yes, please specify.
8. Dose it attract the special condition? If No
Yes, please specify.
9. Location Mouza: Bonchtola, J.L. No.: 4; P.S: Pragati
Maidan, Opposite to Dhapa Stack Yard;
District:24 PGN.(South).Under jurisdiction of
Kolkata Municipal Corporation at its Ward no.-
58, Borough no.-VII
Land use pattern as per municipal Land + Building
record
Site co-ordinate Latitude- 22.54833; Longitude-88.38278
District Kolkata
State West Bengal
10. Nearest Railway Station/Airport along with Sealdah Railway Station (Terminal
distance in km. Station & HQ of Eastern railway) –km
from project site.
NSCBI Airport, Kolkata –km from project
site.
11. Nearest Town, city, District Headquarters’ along Within Kolkata City at upcoming Central
with distance in km. Business District.
12. Village Panchayats, ZillaParishad, Municipal Head Quarter of Kolkata Municipal
Corporation, Local body (complete postal Corporation:
addreses with telephone nos. to be given)
13. Name of the applicant M/SFABWORTH PROMOTERS PRIVATE
LTD.
14. Registered Address 4A J B S Halden Avenue, Kolkata-700
105
15. Address for correspondence: IT-9, Ninth Floor, “Mani Square”;
164/1, Manicktala Main Road,
Kolkata- 700 054.
Name Shri Sanjay Jhunjhunwala
Designation (Owner/Partner/CEO) Director
Address IT-9, Ninth Floor, “Mani Square”;
164/1, Manicktala Main Road,
Kolkata- 700 054.
Pin Code 700054
E-mail teagl@mani-group.com
Telephone No. (+91 33) 2340 7100
Fax No. (+91 33) 2340 7263

Page 3 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

16. Details of Alternative Sites examined, if any. NA


Location of these site should be shown on a
topo sheet
17 Interlinked Projects No
18. Whether separate application of interlinked No
project has been submitted?
19. If yes, date of submission NA
20. If no, reason NA
21. Whether the proposal involves No
approval/clearance under: if yes, details of the
same and their status to be given.
(a) The Forest (conservation) Act, 1980?
(b) The Wildlife (Protection) Act, 1972?
(c) The C. R.Z Notification, 1991?
22. Whether there is any Government Order/Policy No
relevant/ relating to the site?
23. Forest land involved (hectares) NA
24. Whether there is any litigation pending against No.
the project and / or land in which the projects is
purpose to be set up?
(a) Name of the Court
(b) Case No.
(c) Orders/ directions of the court, if any
and its relevance with the proposed
project.

∗ Capacity corresponding to sectarian activity (such as production capacity for


manufacturing, mining lease area and production capacity for mineral production, area
for mineral exploration, length for linear transport infrastructure, generation capacity
for power generation etc.

Page 4 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

(II) ACTIVITY

1. Construction, operation or decommissioning of the project involving actions, which


will cause physical changes in the locality (topography, land use, changes in water
bodies etc.)

S. Information / Checklist Yes / Details thereof (with approximate


No. Confirmation No quantities/ rates, wherever possible) with
source of information data
1.1 Permanent or temporary change in The Project Site has been allotted to the
land use, land cover or topography No developer by Kolkata Metropolitan
including increase in intensity of land Development Authority and the site is
use (with respect to local land use earmarked for construction of 5 Star Hotel
plan) and Hospitality as per the Master Plan.
1.2 Clearance of existing land, No Before handing over the property to the
vegetation and buildings? Developer, the existing structures had been
demolished by the said Govt. authority.
1.3 Creation of new land uses? No The proposed site is earmarked for the
development of 5 Star Hotel and Serviced
Apartment which both are in Hospitality
Category.
1.4 Pre-construction investigations e.g. Yes Soil testing has been conducted for finding
bore houses, soil testing? sub-soil characteristics for foundation
design and water table level. The reports
have been submitted in earlier application.
1.5 Construction works? Yes Construction of 2 towers, one for 5 Star
Hotel and other for Serviced Apartment
having some combined areas for other
hospitality services.
1.6 Demolition works? No The land had been delivered vacant by the
said Govt. Authority.
1.7 Temporary sites used for Yes The local workmen commuting from their
construction works or housing of residences or different mess at nearby
construction workers? locality

1.8 Above ground buildings, structures Yes • The entire floor wise development
or earthworks including linear statistics of the project including all
structures, cut and fill or the above or below ground
excavations structures is being submitted in
Project Concept Report.
• As there is a requirement of
earthwork excavation in the tune of

Page 5 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

1,20,000 Cum, The top-soil has been


preserved for landscaping . The other
good earth has been used for filling
work as well as plinth development.
The excess earth amounting around
30,000 Cum has been transported in
covered trucks at a suitable site as
approved by concerned authority.
1.9 Underground works including YES 3 levels basement for car parking and other
mining or tunneling? hospitality amenities. However no mining or
tunneling is involved.
1.10 Reclamation works? No No reclamation work is required.
1.11 Dredging? No No dredging work is required.
1.12 Offshore structures? No Not applicable, since it is a Real Estate
Development within city area.
1.13 Production and manufacturing No No production or manufacturing process is
processes? involved.
1.14 Facilities for storage of goods or Yes • Separate raw material handling yards
materials? would be used for construction
materials like cement, reinforcement,
sand, stone chips etc. and those will
be stored in earmarked / covered
areas within the project premises.
• During occupancy, there would be
storage of perishable food and non-
food items; Diesel for generator sets
etc.
• All these materials are stored
following Health, Safety and
Environment standards of the
Operating Company.

1.15 Facilities for treatment or disposal Yes Construction Waste:


of solid waste or liquid effluents? Solid waste generated during construction
phase are mainly comprises of wastages of
reinforcement steel, broken AAC block-
pieces, loose mortar, insulation materials,
packaging material, empty cement bags,
waste paper, cardboard packing material etc.
usable/recyclable materials will be sold off to
recyclers. Unusable materials will be used for
land development activities. It has been

Page 6 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

designed to reuse/recycle 100% of the


construction waste as the project is in the
vicinity of a throbbing recycle business hub of
Kolkata.
Solid Waste (Post Occupancy):
Solid waste post occupancy would be of two
types, organic waste and inorganic waste.
There would be 880 Kg of total wastes to be
generated. The wastes would be segregated
at source and to be disposed off as per
stipulated guidelines.
Liquid Waste:
As the fixtures fitted in the project are mostly
water-efficient more than 40% reduced
water consumption than base-line building.
Total waste water generation, post
occupancy in the building would be 450 KLD.
A 450 KLD sewage treatment plant (STP)
based on Nano-Digestor which works on the
principle Sequential-Batch-Reactor process is
proposed to be set-up in the project. Treated
wastewater, meeting the relevant norms will
be used for toilet flushing & landscaping
purposes within the complex. Treated
wastewater, in excess will be stored in the
pond during dry season and would becharged
into the municipal drainage system during
monsoon.
1.16 Facilities for long term housing No Operational staff would be working in shifts
but moving from their residences. However
the developer will provide all necessary
facilities like HRA, conveyance allowance etc.
for their services.
1.17 New road, rail or sea traffic during No Not applicable. Existing road system will be
construction or operation? used. Internal roads/driveways have been
constructed.
1.18 New road, rail, air waterborne or No
other transport infrastructure
Not Applicable.
including new or altered routes
and stations, ports, airports etc.?
1.19 Closure or diversion of existing No
transport routes or infrastructure
Not Applicable.
leading to changes in traffic
movements?

Page 7 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

1.20 New or diverted transmission lines No There will be no shifting of electrical


or pipelines? transmission lines.
1.21 Impoundment, damming, culver No No Impoundment, damming, culver ting,
ting, realignment or other charges realignment or other charges to the
to the hydrology of watercourses hydrology of watercourses is involved.
or aquifers?
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water No During construction & post occupancy water
from ground or surface waters? have been sourced from Kolkata Municipal
Corporation supply system and tankers
ferried to the site.
1.24 Changes in water bodies the land No The surface drainage will not be affected.
surface affecting drainage or run-
off?
1.25 Transport of personal or materials Yes Available public transport will be used by the
for construction operation or construction personnel. Goods carriers of
decommissioning? different categories will be used for transport
of material during construction/operation
phase. On an average 20 trucks per day have
been offloading the materials at site.
1.26 Long-term dismantling or No Not applicable
decommissioning or restoration
works?
1.27 Ongoing activity during No Not applicable
decommissioning which could have
an impact on the environment?
1.28 Influx of people to an area in either Yes Since it is a hospitality project, there would
temporarily or permanently? be temporary influx of people for a short
duration. Moreover around 200 numbers of
service staff will be always stationed at the
project catering the guests. However
comparing the population density of this
project with any other high end residential or
office area, it is just a small fraction of those.
During construction phase around 600
workmen at a time have been engaged
temporarily.
Room availability:
• JW Marriot Hotel: 281 rooms.
• Serviced Apartments: 208 rooms.
1.29 Introduction of alien species? No Not applicable
1.30 Loss or native species or genetic No Not applicable
diversity?

Page 8 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

1.31 Any other actions? No Not applicable

2. Use of natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources which are non-renewable or in
short supply):

S. Information / Checklist Yes / Details thereof (with approximate quantities/


No. Confirmation No rates, wherever possible) with source of
information data
2.1 Land especially Yes A land area of 5.61 Acres (2.27 Ha) has been
undeveloped or agricultural earmarked for development of Hospitality project by
land (ha) Kolkata Municipal Development Authority.
2.2 Water (expected source & Yes Water to be extracted from trunk line of Municipal
competing users) unit: KLD Supply. Details of Water requirement and Water
Balance Charts, please refer Annexure:
2.3 Minerals (MT) No Not applicable
2.4 Construction material – Yes Construction material required for th construction
stone, aggregates, sand / project:
soil (expected source – MT) S. Material Quantity
No.
1 RMC (Cum) 52963
2 Steel (MT) 4158
3 Cement (Bag) 63556
4 AAC Blocks (Cum) 79445
5 Sand (cft) 311225
Apart from ‘sand’ all the materials will be sourced
from authorized vendors located within 150 Km.
Sand will be sourced from local material supplier and
sourced from Damodar river, 200 Km. apart.
2.5 Forests and timber (source Yes The door frames, wooden flooring materials are
– MT) sourced from certified vendors having licenses to
procure and sell of those products. Approximate
quantity: 65.00 Cum
2.6 Energy including electricity Yes • Power Requirement (5 Star Hotel) =3069 KW
and fuels (source, • Power Requirement (Serviced Apartment) =
competing users) Unit: fuel 1135 KW.
(MT), energy (MW) • Source: CESC and DG Sets of capacities: 2200
KVA X 3 (for Hotel); 250 KVA X 2 (for Serviced
Apartment). Fuel (HSD) Requirement:
2KL/day.
2.7 Any other natural resources Yes Solar Street lights and Hot water systems have been
(use appropriate standard installed to reduce conventional energy
units) substantially.

Page 9 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

3. Use, storage, transport, handling or production of substances or materials, which


could be harmful to human health or the environment or raise concerns about actual
or perceived risks to human health.

S. Information / Checklist Yes Details thereof (with approximate


No. Confirmation / No quantities/ rates, wherever possible)
with source of information data
3.1 Use of substance or materials, which No No use and storage of hazardous
are hazardous (as per MSIHC rules) chemicals (as per MSIHC rules) during
to human health or the environment operation phase is anticipated. However
(flora, fauna, and water supplies) there may be some handling of spent oil,
from backup DG sets. Suitable
management practice will be adopted.
HSD (low-sulphur variety) will be used for
DG sets.

3.2 Changes in occurrence of disease or No Suitable drainage and waste


affect disease-vectors (e.g. insect or management systems is being and will
water borne diseases) be adopted in both the construction
and post occupancy phases, which will
restrict stagnation of water or
accumulation of wastes. This will
effectively restrict the reproduction
and growth of disease vectors.
3.3 Affect the welfare of people e.g. by No There would not be any adverse effect
changing living conditions? on the environment, health and safety
of the local populace due to
construction and operation of the
project. On the contrary, some better
effects on the locality are ensured:
• Generation of some 200 white
collar jobs.
• Property prices would go up so
be the affluence of the
property owners.
• Attracts foreign tourists and so
the foreign currencies.
• The >20% greenbelt within the
project acts as dust and carbon
sink and may have effects on
local ambient air-quality.
3.4 Vulnerable groups of people who No NA

Page 10 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

could be affected by the project e.g.


hospital patients, children, the
elderly etc.
3.5 Any other causes No NA

4. Production of solid wastes during construction or operation or decommissioning


(MT/month)

S. Information / Checklist Yes / Details thereof (with approximate quantities/ rates,


No. Confirmation No wherever possible) with source of information data
4.1 Spoil, overburden or No
Not Applicable.
mine wastes
4.2 Municipal waste Yes Adequate number of collection bins, separately for
(domestic and or organic and inorganic waste will be provided as per
commercial wastes). Municipal Solid Waste (Management and Handling) Rule,
2000.
The non-biodegradable – recyclable wastes will be sold
to recyclers and the in-organic inert materials & the bio-
degradable solid wastes will be disposed off in
consultation with the concerned Civic Body
4.3 Hazardous wastes (as Yes The only hazardous wastes in the project will be
per Hazardous Waste used/spent oil from standby DG sets, which is classified
Management Rules) as Hazardous Waste Category 5.1 as per Hazardous
Wastes (Management and Handling). Amendment Rules,
2003. Spent oil will be carefully stored in HDPE drums
under isolated storage, and periodically sold to
authorized recyclers. All precautions will be taken to
avoid spillage from the storage.
S. Information / Checklist Yes / Details thereof (with approximate quantities/ rates,
No. Confirmation No wherever possible) with source of information data
4.4 Other industrial process No Not applicable.
wastes
4.5 Surplus products No Not applicable.
4.6 Sewage sludge or other Yes Some quantities of dry sludge from STP will be generated
sludge from effluent during operation phase. Such dried sludge will be
treatment donated to local cultivator and piggery for using it as
manure.
4.7 Construction or Yes Solid waste during construction phase would mainly
demolition wastes comprises of concrete debris with bits and pieces of
steel, insulation materials, packaging material cement
bags, waste paper, cardboard packing material etc.
usable/ recyclable materials have been sold off to

Page 11 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

recyclers. Otherwise it would be used as filler material


for road construction, drop-slab at toilet blocks; ground
improvement etc. 100% of construction waste would be
either reused or recycled for this project.
4.8 Redundant machinery No
NA.
or
4.9 Contaminated soils or No
Not Applicable
other
4.10 Agricultural wastes No Not Applicable.
4.11 Other solid wastes Yes Packing materials, hard board, etc. will be segregated
and sold to the vendors.
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. Information / Checklist Yes Details thereof (with approximate


No. Confirmation / No quantities/ rates, wherever possible) with
source of information data
5.1 Emissions from combustion of fossil Yes The operation of proposed project does not
fuels from stationery or mobile envisage any major air pollutant sources
sources except operation DG sets during power
failure and vehicular movement.
Use of low Sulphur content ultra-pure Diesel
reduces SO2 emissions from the DG sets.
HSD use : 2KL/Day
LPG consumption: 300 KG/day.
Source: CESC and DG Sets of capacities: 2200
KVA X 3 (for Hotel); 250 KVA X 2 (for Serviced
Apartment). Fuel (HSD) Requirement:
2KL/day.
DG sets would be operated in case of power
cut which is also very rare at Kolkata.
Stack height would as per the stipulation of
the concerned Authority.
S. Information / Checklist Yes Details thereof (with approximate
No. Confirmation / No quantities/ rates, wherever possible) with
source of information data
5.2 Emissions from production processes No Not Applicable.
5.3 Emissions from materials handling Yes Fugitive emission due to handling, loading &
including storage or transport. unloading activities is envisaged during
construction. However, this will be restricted
to the construction phase and to the
construction site only which is being
controlled by use of water sprinkler, dust
screen etc. High boundary wall acts as an
erosion control measure during construction.

Page 12 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

5.4 Emissions from construction Yes This will be restricted to the construction
activities including equipment. phase and the construction site only.
Adequate measures have been taken to
minimize the dust emission as well as soil
erosion.
5.5 Dust or odors from handling of Yes Dust is likely to be generated during
materials including construction excavation, back-filling and hauling
materials, sewage and waste operations along with transportation
activities during the construction phase.
Water sprinkling system and tarpaulin cover
will be provided over stored raw material to
reduce the dust emission.
5.6 Emissions from incineration of waste No Strictly restricted.
5.7 Emissions from burning of waste in No
open air (e.g. slash materials, Strictly restricted.
construction debris)
5.8 Emissions from any other sources No
6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. Information / Checklist Yes / Details thereof (with approximate


No. Confirmation No quantities/ rates, wherever possible) with
source of information data
6.1 From operation of equipment e.g. Yes All the machinery will be of reputed make
engines, ventilation plant, and will comply with national / international
crushers standards that take care of air and noise
pollution control / vibration control. Hence,
no significant impact due to operation of
machineries is anticipated. Source of noise
during post occupancy will be from standby
DG sets, which will be in operation only
during power failure. Noise free D G Sets
would be installed as per CPCB norms.
S. Information / Checklist Yes / Details thereof (with approximate
No. Confirmation No quantities/ rates, wherever possible) with
source of information data
6.2 From industrial or similar No Not applicable. Boiler details are attached as
processes an Annexure.
6.3 From construction or demolition Yes During construction activities some noise will
be generated from machineries. Adequate
precautions will be taken to maintain the
noise level well within the permissible limits.
6.4 From blasting or pilling Yes Piling works involved have been done by
rotary rigs surrounded by diaphragm walls.

Page 13 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

6.5 From construction or operational Yes In construction phase daily movement of


traffic trucks containing materials are envisaged.
Separate entry & exit will be provided for
smooth movement of traffic. Trained guards
and parking attendants would be deployed
for localized traffic management and smooth
in and out movements of the vehicles from
the project complex.
6.6 From lighting or cooling systems Yes Noise from Cooling tower is around 85-95
dB(A) and suitable noise abetment method
will be adopted.
6.7 From any other sources No Not applicable.

7. Risks of contamination of land or water from releases of pollutants into the ground or
into sewers, surface waters, groundwater, Coastal waters or the sea:

S. No. Information / Checklist Yes / Details thereof (with approximate


Confirmation No quantities/ rates, wherever possible) with
source of information data
7.1 From discharge of sewage or No The construction site waste water would be
other effluents to water or to the routed through a inspection pit /
land (expected mode and place of sedimentation basin prior before final
discharge) disposal to the public drainage system.
Sewage from toilet blocks during
construction phase will be treated in
disposable septic tank system, which would
be carried by municipal truck after
completion of construction and/or
installation of STP.

During post occupancy sewage will be


treated in a well-designed STP. 100% of the
treated sewage (315KLD) will be used for
non-critical purposes like toilet flashing, car
washing & irrigation. Treated wastewater in
excess meeting relevant discharge norm
would either be into the municipal drainage
systems.
7.2 From handling, storage, use or No The only hazardous wastes in the project will
spillage of hazardous materials be used / spent oil from standby DG sets. It
will be stored in drums and kept in covered
shed. Handling of spent oil will be done on
concrete platform.

Page 14 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

7.3 By deposition of pollutants No Dust will be generated during construction


emitted to air into the land or into phase from earthworks, movement of
water vehicles and by wind erosion of areas cleaned
of vegetation. Appropriate fugitive dust
control measures, including watering,
sprinkling of water on exposed areas and
dust covers for trucks would be employed to
minimize any impacts. Thus no significant air
quality impacts from fugitive dust emissions
are anticipated during construction and
during operation phase of the project.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build- No Not applicable
up of pollutants in the
environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect
human health or the environment

S. Information / Checklist Yes / Details thereof (with approximate quantities/


No. Confirmation No rates, wherever possible) with source of
information data
8.1 From explosions, spillages, fires No Best Engineering practice and following of EHS
etc from storage, handling use or made it as zero accident projects. During
production of hazardous construction, all labors will be provided with
substances suitable personal protective equipment (PPE) as
required under the health & safety norms
provided.
S. Information / Checklist Yes / Details thereof (with approximate quantities/
No. Confirmation No rates, wherever possible) with source of
information data
8.2 From any other causes No Not applicable
8.3 Could the project be affected by No The study area falls in Zone-lll according to
natural disasters causing Indian Standard Seismic Zoning Map. Structures
environmental damage (e.g. have been designed with adequate Seismic
Floods, earthquakes, landslides, safety factors.
cloudburst etc)?

Page 15 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

9. Factors which should be considered (such as consequential development) which could


lead to environmental effects or the potential for cumulative impacts with other
existing or planned activities in the locality.

S. Information / Checklist Yes Details thereof (with approximate quantities/


No Confirmation / rates, wherever possible) with source of
. No information data
9.1 Lead to development of supporting Yes Internal road will be constructed by the project
utilities, ancillary development or proponent.
development stimulated by the Electricity will be supplied by CESC. Usable/
project which could have impact on recyclable solid wastes from construction
the environment e.g.: activities will be sold off to recyclers. Unusable
materials will be used to land development
• Supporting infrastructure activities. Unusable materials, if in excess will be
(roads, power supply, waste disposed off in consultation with the concerned
or waste water treatment, Authority.
etc.) Wastewater will be collected through a well-
• Housing Development designed sewer network leading to STP in post
• Extractive industries occupancy phase.
• Supply industries In the post-occupancy phase, treated
• other wastewater to the tune of 315 KLD(90% of 350
KLD) will be used for non-critical purposes like
for toilet flushing, car washing, irrigation purpose
etc. within the Complex. Treated wastewater, in
excess will be stored in the water-body.
Post Occupancy phase solid waste will comprise
of organic and inorganic fractions. It would be
disposed as per Municipal norms.
Temporary sanitation facilities will be provided in
the construction phase.
9.2 Lead to after-use of the site, which No Not applicable
could have an impact on the
environment
9.3 Set a precedent for later No Not applicable
development
9.4 Have cumulative effects due to No Not applicable
proximity to other existing or
planned projects with similar
effects.

Page 16 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

(lll) ENVIRONMENTAL SENSITIVITY

S. Areas Name/identity Aerial distance (within 15 km.)


No. proposed project location
boundary
1 Areas protected under None
international conventions,
national or local legislation
East Kolkata Wetland
for their ecological,
landscape, cultural or other
related value
2 Areas which are important or • River Hooghly
sensitive for ecological
• Around 7 km in West
reasons: Wetlands, • East Calcutta
Direction.
watercourses or other water Wetland Boundary
• Within 1 Km.
bodies, coastal zone, in East direction
biospheres, mountains, w.r.t the Project
forests. site.
3 Areas used by protected, None
important or sensitive species
of flora or fauna for breeding,
nesting, foraging, resting,
over wintering, migration
4 Inland, coastal, marine or None
-
underground waters
5 State , National boundaries None -
6 Routes or facilities used by None
the public for access to
-
recreation or other tourist,
pilgrim areas

S. Areas Name/identity Aerial distance (within 15


No. km.) proposed project
location boundary
7 Defense Coast Guard Training Center properties Within 2.5 km distance
installations from the project site.
8 Densely The Project Site is within Kolkata City.
populated or Densely populated area is around the
built-up area project site

Page 17 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

9 Areas occupied School:


by sensitive man- 1) DPS Ruby Park • 5.5 km from Project Site
made land uses 2) Loreto Girls • 4.2 km from Project Site
(hospitals, 3) Loreto Convent • 3.1 km from Project Site
schools, places of 4) Calcutta Boys School • 5.0km from Project Site
worship, 5) Salt Lake CA School • 5.9 km from Project Site
community 6) Don Bosco Park Circus • 5.3 km from Project Site
facilities) College:
1. Lady Brabourne College • 5.5 km from Project Site
2. St. Xavier’s College • 6.3 km from Project Site
3. Govt. College of Leather • 3.2 km from Project Site
Technology
• 3.3 km from Project Site
4. National Institute of Fashion
• 3.1 km from Project Site
Technology
5. The WB National Institute of
Judicial Science

University:
1) Jadavpur University 2nd Campus • 2.3 km from Project Site
2) Jadavpur University • 9.5 km from Project Site
3) Calcutta University • 5.8 km from Project Site
4) Presidency University • 5.7 km

Hospital: • 4.3 km.


1) Appolo Gleneagles • 4.3 km from Project
2) AMRI Salt Lake • 4.2 km from Project Site
3) Columbia Asia Hospital • 7.0 km from Project Site
4) Medica Super-Specialty Hospital • 7.6 km from Project Site
5) RN Tagore Heart Research
• 4.6 km from Project Site
6) Nilratan Sarkar Medical Collage
10 Areas containing River Hooghly
important, high
quality or scarce
resources East Calcutta Wetland Boundary in SE 7.0 km from Project site
(ground water direction w.r.t the Project site. in West Direction
resources,
surface Opposite to project site
resources, within 1.0 km
forestry,
agriculture,
fisheries, tourism,

Page 18 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

minerals)
11 Areas already None
subjected to
Pollution or
environmental
damage. (those
Not Applicable
where existing
legal,
environmental
standards are
exceeded)
12 Areas susceptible None
to natural hazard
which could
cause the project
to present
environmental
problems
Not Applicable
(earthquakes,
subsidence,
landslides,
erosion, flooding
or extreme or
adverse climatic
conditions)

(lV) Proposed Terms of Reference for EIA studies: As per EIA Notification, 2006 the
proposed project falls under Section 8(a), hence does not require EIA Studies.

Page 19 of 20
M/s FABWORTH Proposed 5 Star Hotel and Serviced Apartment at FORM 1
PROMOTERS PVT. LTD. Premises no.4A J B S Halden Avenue, Kolkata-700
105

I do hereby give this undertaking that the data and information given in the application and
enclosures are true to the best of my knowledge and belief and I am aware that if any part of
the data and information submitted is found to be false or misleading at any stage, the project
will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Correspondence Address: Shri Sanjay Jhunjhunwala


M/S FABWORTH DEVELOPERS PRIVATE LIMITED
IT-9, Ninth Floor, “Mani Square"
164/1, Manicktala Main Road.
Kolkata – 700 054.

Date: 21stNovember, 2016


Place: Kolkata

Note
1. The projects involving clearance under Coastal Regulation Zone Notification 1991 shall
submit with application a C.R.Z. map duly demarcated by one of the authorized
agencies, showing the project activities, w.r.t. C.R.Z. (at the stage of TOR) and the
recommendations of the State Coastal Zone Management Authority (at the stage of EC).
Simultaneous action shall also be taken to obtain the requisite clearance under the
provisions of the C.R.Z. Notification, 1991 for the activities to be located in the CRZ.

2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere


Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the
map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the
project location and the recommendations or comments of the Chief Wildlife Warden
thereon (at the stage of EC)

3. All correspondence with the Ministry of Environment & Forests including submission of
application for TOR / Environmental Clearance, subsequent clarifications, as may be
required from time, participation in the EAC Meeting on behalf of the project proponent
shall be made by the authorized signatory only. The authorized signatory should also
submit a document in support of his claim of being an authorized signatory for the
specific project.

Page 20 of 20