You are on page 1of 1

EST. PORT DISB.

MV ORIENT PLUTO
At RDMP Pertamina Balikpapan Construction Jetty, Balikpapan - Indonesia
Discharging : Project Cargo 876FRT - Liner Out

LOA : 120 M
GRT : 7252 Currency in USD
At Jetty
Description Calculation
Net Charge + VAT
Harbour Dues, 1 period = 10days : 0.110 (tariff) x 7252 (grt) x 1 period = 797.72 797.72
Quay Dues : 0.1111 (tariff) x 7252 (grt) x 1.25 days = Paid by RDMP Project 0.00
(Fixed tariff) : 75.23 (tariff) x 2 (in/out) = 150.46
Sea Pilot Dues 672.60 739.86
(Variable tariff) : 0.0360 (tariff) x 7252 (grt) x 2 (in/out) = 522.14
Harbour Pilot (Fixed tariff) : 75.23 (tariff) x 2 (in/out) x 75% = 112.85
Dues 504.45 554.90
(Variable tariff) : 0.0360 (tariff) x 7252 (grt) x 2 (in/out) x 75% = 391.61
(Fixed tariff) : 770.8597 (tariff) x 2 (in/out) x 3.5 hours = 5,396.02
Tug Dues 5,797.05 6,376.76
(Variable tariff) : 0.0079 (tariff) x 7252 (grt) x 2 (in/out) x 3.5 hours = 401.04
Light Dues : 0.034 (tariff) x 7252 (grt) = 246.57 246.57
Vessel Traffic Services : 25 (tariff) = 25.00
Hot work permit, for 3 days period : 600 (cost) (if any) = if any
Service boat for Port Health/Quarantine
checking Covid19 at anchorage before Pilot On : 300 (cost) per trip x 2 trips VV = 600.00
Board
Cutting and Grinding : 2500 (cost) = if any
Board Stevedore liner out : 4.5 (cost) x 876.00 RT = 3,942.00
Unlashing labour cost : 0.5 (cost) x 876.00 RT = can be done by ship crew
Agency Fee : including PKKA, contribution charges to Pertamina/PTK, clearence in/out (lumpsum) = 3,500.00
Total 16,782.81

You might also like