You are on page 1of 1

DPWH CHECKLIST FOR FLOOD CONTROL STRUCTURE ALONG MAJOR/PRINCIPAL RIVER BASINS

Name of Project:
Check (✓) the
Location: appropriate Remarks
box
Project Cost: Type of Structure:
1. Current Project Status
a. Continuation of on-going/phase-implemented project with RDC
Endorsement If with RDC
Endorsement,
b. New Proposal with RDC Endorsement
please attach
c. New Proposal without RDC Endorsement
2. Covered by a Foreign-Assisted Project (FAP)
a. Yes If yes, indicate
b. No what FAP
3. Identified as Flood Prone Area under the Study on Nationwide
Flood Risk Assessment and Flood Mitigation Plan for the Selected
Areas (NFRAFMP)
a. Under 18 Major River Basins
Refer to
b. New Proposal with RDC Endorsement
NFRAMP
c. New Proposal without RDC Endorsement
4. Status of the Project
a. With Feasibility Study or Master Plan (date completed: ________) If with study (a)
b. With Pre-Feasibility Study/Technical Study (date completed: _______) or (b), please
c. Without Study attach soft copy

5. Protects Structure within 1 Kilometer Radius


a. National Bridge Please attach
Location Map and
b. National Road
identify project
c. Public Building (Hospital, Municipality/City Hall, School) *Encircle which site and structure
6. Protect is
a. Rehabilitation If not a, or b, or
b. Upgrading/Improvement c, or d, please
specify here the
c. New Construction scope
d. Desilting/ Dredging/ Deepening ________
7. Located within
a. City If traversing
b. 1st class municipality more than one
c. 2nd class municipality (1), please
specify how
d. 3rd class municipality many cities or
e. 4th class municipality municipalities
f. 5th class municipality _________

8. With ROW
a. Yes If with ROW,
please state the
b. No amount of ROW
9. Within Buildable Zone
Refer to Multi-
a. Yes Hazard Map (If you
do not have one,
b. No go to DENR or
DOST)
Validated and submitted by:

LESLIE ANTHONY S. MOLINA


District Engineer

You might also like