Professional Documents
Culture Documents
JOSON - Joshua C. - 5AR-1 - Assignment No. 9 - Rule 7 - Compre 2
JOSON - Joshua C. - 5AR-1 - Assignment No. 9 - Rule 7 - Compre 2
Architecture
Comprehensive Course 2
Second Semester 2023 - 2024
Arch. Juliet B. Ramos
5AR-1
RULE 7
Assignment no. 9
Joshua C. Joson
1. or below the surface of the lot, which Answer: A
entails excavation and backfill works 5. an imaginary prism within the fully
a. below grade enclosed areas and courts of a
b. basement footprint proposed building or structure shall
fit.
c. typical floor
a. AMVB
d. height of building
b. REDEVELOPMENT
Answer: A
c. AMBF
2. the point reference on the highest
adjoining natural grade (ground d. TYPICAL FLOOR
surface), as established by the proper Answer: A
government authority. 6. a regularly replicated floor plan or
a. established grade elevation area, usually for the tower
b. projection component of a proposed building or
structure.
c. below grade
a. above grade
d. ofb
b. storey
Answer: A
c. typical floor
3. must be adjusted so AMVB must be
exceeded d. basement footprint
a. AMBF Answer: C
b. TGFA 7. if only 1 RROW services a lot and
such is only 4 to 5 meters wide, a
c. STOREY
BHL of _ storeys or _ meters max
d. BHL shall be observed regardless of use or
Answer: B occupancy, lot size, lot dimensions,
4. the lowest point of elevation of the lot frontage and the like
finished surface of the ground considerations.
between the exterior wall of a a. 2.5, 1.5
building and a point and a distant b. 2.5, 7.6
from said wall, or the lowest point of
c. 2.5, 7.5
elevation of the finished surface of
the ground between exterior wall of a d. 10.5, 7.5
building and a property line, if it is Answer: C
less than. 8. or on immediately above the surface
a. grade of the lot
b. basement level a. ambf
Answer: B c. OFB
17. BHL X DESIRED HEIGHT d. AMVB
a. basement level Answer: A
b. vertical penetrations 21. to crosscheck the _ against the
c. projection allowable maximum _, convert the _
into its approximate area by dividing
d. resultant height
it with the _. before converting the _
Answer: D to its area component, check for the
18. the physical setting for any effects of the incremental setbacks
building/structure whereby the level on the TGFA for each floor of the
or intensity of development covering proposed building or structure.
such property is regulated by DC a. amvb, tgfa, amvb, bhl
stipulated under this Code, by other
b. area of the ambf
agencies of the national government
concerned with physical c. development control
development, by the LGU concerned d. above grade
and by the deed of restrictions Answer: A
(force). 22. is the ratio between GFA of a
a. lot building and the TLA of the
b. podium lot/property on which it stands.
c. air transportation office (ato) a. AREA OF THE AMBF
d. tower b. FLAR
Answer: A c. AMBF
19. must not be that of the ground floor d. REDEVELOPMENT
and should be repeated or replicated Answer: B
throughout large portions of or 23. the limit of the total volume of space
throughout the entire that can be occupied by a proposed
building/structure. building or structure above grade
a. low rise level.
b. above grade a. basement footprint
c. storey
b. allowable maximum volume b. floor to floor height
of building above grade c. tower
c. development potential of lot d. floor plate
d. floor to floor height Answer: B
Answer: B 28. of any proposed or existing
24. or above the surface of the lot up to building/structure should not exceed
the air above it subject to the the prescribed FLAR multiplied by
application of the BHL; this is the the TLA
area wherein most construction work a. FLOOR TO FLOOR
take place HEIGHT
a. basement level b. GFA
b. above grade c. STOREY
c. below grade d. BHL
d. ambf, bhl, amvb Answer: B
Answer: B 29. for lots and buildings or structures
25. measured from the outermost face of a. projection
the basement walls of the building or b. development control
structure
c. building
a. floor plate
d. outside
b. basement footprint
Answer: B
c. area of the ambf
30. shall mean stairs, fire escapes,
d. above grade elevator shafts, pip shafts, vertical
Answer: B shafts, vertical ducts, and the like
26. AMBF X BHL - VOLUME and their enclosing walls which
a. AMVB enclose area such as machine room
b. RESULTANT HEIGHT and closets, storage rooms and
closets, covered balconies and
c. PSO
terraces, interior walls and columns
d. AMBF and other interior features and the
Answer: A like.
27. the perpendicular distance or vertical a. projection
measurement between the uppermost b. 2, 6
surfaces of 2 successive floor of a
c. vertical penetrations
proposed building or structure
a. allowable maximum volume d. high rise
d. tower Answer: A
69. is determined by dividing the GFA of
Answer: C
a building and structure by the TLA
66. the outermost and topmost vertical or
a. TYPICAL FLOOR
angular planes of a proposed
building or structure that shall b. FLAR
govern the limits of its walls and c. DEVELOPMENT
roof POTENTIAL OF LOT
a. Floor to Floor Height
d. LOT
b. Floor Plate
Answer: B
c. Outermost Faces of the 70. the fully enclosed component of the
Buildings building or structure situated
d. Resultant Height of Building between the established grade and
the first of atypical floor of the
Answer: C
building or structure's tower
67. shall be primarily determined by the
component;
vertical projections of the outermost
a. tower
faces of the AMBF up to a height
prescribed by the applicable BHL b. podium
a. BUILDING PROJECTIONS c. grade
b. AMVB d. ambf
c. ESTABLISHED GRADE Answer: B
ELEVATION 71. help determine the development
potential and/or the carrying capacity
d. OFB
of all lots and/or proposed
Answer: D developments
a. rrow, amvb
b. basement level c. Basement Footprint
c. development levels of lot d. development potential of lot
d. development control Answer: B
Answer: D 75. the podium for a __ use or
72. is situated between the imaginary occupancy shall not be higher than _
footprint prism and projections prism storeys or _ m from established
a. redevelopment grade.
a. c-3, 12, 36
b. building projection
b. c-3, 12, 64
c. covered areas
c. 1, 5, 3, 15
d. building bulk
d. 2, 6
Answer: B
73. new physical development Answer: A
(consisting mainly of new 76. FLAR
construction and fit-out work) within a. floor to lot area ratio
a lot that is open for development, b. typical floor
vacant, unutilized, c. floor to floor height
development-committed or within
d. vertical penetrations
adjacent/contiguous lots which are
similiarly situated have a common Answer: A
continuous frontage along the main 77. uncovered areas for helipads,
road right of way. airconditioning cooling towers or
a. projection ACCU balconies, overhead water
tanks, roof decks, laundry areas and
b. building
cages, wading or swimming pools,
c. redevelopment whirlpool or jacuzzis, terraces,
d. new development gardens, courts or plazas, balconies
Answer: D exceeding _ sqm, fire escape
74. set the roof height limit and structures and the like
configuration as well as to determine a. grade
the limits of incremental setbacks b. 60
applicable to the height of the c. 10
proposed building or structure, a
d. GFA
diagonal line at an allowed angle or
slope must be then drawn from the Answer: C
center of the rrow 78. low rise from _ to _ storey, from _m
a. Height of Building to max of _ m above established
grade
b. Outermost Faces of the
a. 6, 5, 3, 15
Buildings
b. 1, 10, 3, 15 c. projection
c. 1, 5, 3, 15 d. building projections
d. 3, 9 Answer: C
Answer: C 82. shall exclude provisions for courts at
79. if a greater building or structure grade level
height is desired, consult existing a. OFB
zoning ordinances or other b. AMBF
applicable laws for possible relief; if c. AMVB
relief cannot be sought, explore
d. TGFA
sub-grade (basement level) solutions
or reduce the desire floor to floor Answer: B
heights in case it is greater than _ 83. the optimized extent of physical
meters. development that may be introduced
a. 200 into the lot without causing undue
damage, effects, or hardship on the
b. above grade
end-users of the proposed
c. BHL development or on neighboring
d. 3 occupants, entities, or hardship on
Answer: D the end-users of the proposed
80. the intersection of the angular plane development or on neighboring
and the vertical prism based on the occupants, entities, properties, lands,
ambf shall complete the applicable developments or the environment
ofb for the lot. (whether man-made or natural) and
a. AMBF with the proposed building/structure
capable of being supported by
b. AMVB, TGFA, AMVB,
existing utility, transportation and
BHL service systems or by proposed
c. STOREY expansions/upgrading of such
systems within the immediate future.
d. AT GRADE
a. carrying capacity of lot
Answer: A
b. basement level
81. roof eaves, trellis, canopy/media
agua, porte cochere, balcony, decks, c. basement level
deck/cantilevered terraces d. new development
sun-breaker, cantilevers, signage
Answer: A
support, flag and lightning support,
84. all measurements pertaining to _
gondolas/window cleaning systems
shall be made from the outermost
and the like,
faces of the exterior walls and roof
a. established grade elevation
or from the bottom surface of the
b. covered areas
lowermost floor of the a. PROJECTION
building/structure b. AMVB
a. building bulk
c. AMBF
b. redevelopment
d. RESULTANT HEIGHT OF
c. floor plate
BUILDING
d. basement footprint
Answer: C
Answer: A 89. a 3 dimensional physical
85. the gross expanse of a floor development erected within a lot or
measured from the outermost edges property or any combination of or all
of floor slabs and which may or may of its 3 different levels (at grade,
not be representative of the typical below grade, above grade)
floor of a proposed building/structure [structure]
a. floor to floor height a. basement level
b. typical floor b. building
c. storey c. projection
d. floor plate d. new development
Answer: D Answer: B
86. AMBF / TLA 90. may also be expressed in cubic
a. GFA meters must not exceed the
b. AIR TRANSPORTATION established AMVB above grade.
OFFICE (ATO) a. building projection
projections b. 101.5
Answer: D c. 1.5
95. GFA + NON GFA AREAS - ALL d. 3, 9
REQ FOR COURTS AT ALL Answer: C
FLOORS UNDER RULE 8 99. generally measured from the
a. TGFA established grade line to the topmost
portion of the proposed building or
structure
a. BHL
b. TOWER
c. PODIUM
d. OFB
Answer: A
100. all areas ___ of the AMBF but
within the lot lines shall be
considered open spaces. (impervious
and unpaved)
a. typical floor
b. outside
c. basement footprint
d. basement level
Answer: B