S&G MERCO

PLANT DESIGN PROJECT 2500 T / d


ALMILLO PLANT

FACILITIES CRITERION DESIGN

PROJECT N ° 20211 ME525S

REV BY REVIEWED ISSUED BY DATE


TO Green field H. Parra Internal review 29/06/2021
B Green field H. Parra Internal review
C Green field H. Parra Internal review
D Green field H. Parra Internal review
CRITERION DESIGN

GREENFIELD PROJECT 2500 T / d Document:


Leaf:
Section: 1 Plant Design
Initial Review: H. Parra Date: 29/06/21 Rev .:
Final revision: H. Parra Date: Rev .:

SECTION DESCRIPTION DATE

1 Index 29/06/21
2 Abbreviations 29/06/21
3 Codes 29/06/21
4 Schedule 29/06/21
5 Crushing 29/06/21
CRITERION DESIGN

GREENFIELD PROJECT 2500 T / d Document:


Leaf:
Section: 2 Plant Design
Initial Review: H. Parra Date: 29/06/21 Rev .:
Final revision: H. Parra Date: Rev .:

Abbreviations Definition

h Hours
d Days
to Years
m3 / h cubic meters per day
g/T grams per ton
T Metric ton
T/d Tons per day
T/h Tons per hour
T/a Tons per year
h/d Hours per day
SG Specific Gravity
cm centimeter
kg / month kilograms per month
m meters
CALCULATION MEMORY

GREENFIELD PROJECT 2500 T / d Document:


Leaf:
Section: 3 Plant Design
Initial Review: H. Parra Date: 29/06/21 Rev .:
Final revision: H. Parra Date: Rev .:

Codes Description
TO Information provided by the company that requires the service
B Designer criteria
C Engineering Manual Data
D Practical standards in the industry
AND Calculations
GREENFIELD PROJECT FROM 2500 T / d
Document:
Sheet:
Section: 4 General Data
Initial Revision: H. Parra Date: 01/06/21 Rev .: .
Last Revision: H. Parra 01/06/21 Rev .: .

ROM CHARACTHERISTICS

Mineral Characteristics
Mineral Formula SG %
Alabandite MnS 4.05 0.79%
Bornite Cu5 FeS4 5.6 0.05%
Chalcopyrite CuFeS2 4.1 0.06%
Sphalerite (Zn,Fe)S 4 1.19%
Stibnite SbS3 4.6 2.19%
Galena PbS 7.6 1.73%
Tetrahedrite Cu12 Sb4 S13 5.2 0.33%
Gold Au 19.3 0.00%
Pyrite FeS2 4 10.63%
Polybasite (Ag, Cu)16 Sb2 S11 3.5 0.40%
Barite BaS4 4.5 1.49%
Rhodochrosite Mn(CO)3 3.6 3.14%
Quartz SiO2 2.6 78.00%

Assays of ROM Unit Nominal Desing Source


Copper % 0.22 0.22 A
Lead % 1.5 1.5 A
Zinc % 0.8 0.8 A
Gold g/T 5.94 5.94 A
Silver g/T 482.19 482.19 A

Tonnage to be treated
Annual tonnage T/a 912500 912500 A
Day d 365 336 A
Day tonnage T/d 2500 2717 A
Hour tonnage T/h 104.17 113.22 A
Availability % 100 92 B

Feed characteristic
Average humidity % 2 2 A
Specific Gravity gr / cm3 3.180 3.180 A
Work index - wi kw-h / Tc 12 12 B
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 PLANT DESIGN
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

The design criteria used in the selection of the tanks were based on the respective calculations of the reagent
consumption described in the calculation memory. To identify the appropriate tanks, we have used the
KOZEGHO company catalog, a document on which we have based on the selection of both tanks and their
agitators. In the same way, the choice of secondary equipment for each stage has been based on catalogs.
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - FERROSILICON PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

FERROSILICON

The Ferrosilico arrives in powder in BIG BAG with bags inside, with a capacity of 1000 Kg. This reagent
arrives from Arequipa in trucks that load a maximum of 20 T, after the arrival of the cargo trucks to the
mining unit, (Orders are monthly), they are unloaded by forklift to the reagent warehouse. For
preparation, the required daily BIG BAGs are transferred by forklift directly to the preparation area; in
this case the reagent dosing is direct by means of dosing pumps.

General Data Unit Nominal Design Source

Treated mineral T/d 2072 2253 A


Treated mineral T/h 86 94 A
Ferrosilicon Consumption g/T 250 250 A
Ferrosilicon Consumption kg / d 518 563 A
Ferrosilicon Consumption kg / month 15543 16895 A
Sp Gr Ferrosilicon 6.80 6.80 A
FERROSILICON Preparation

Ferrosilicon solution m3 / d 0.076 0.0828 A


Preparation % 100 100 D
Toilet m3 / d - - D
Ferrosilicon consumption Kg / d 518 563 A
Frequency of preparation d 1 1 D

Distribution

Drawer pump DMS cc / min 52.9 57.5 A


GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - LIME PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

LIME PLANT

The lime arrives as a bulk solid in a big bag, with polypropylene bags inside to protect the lime, in a
capacity of 1000 kg. This reagent arrives from Arequipa in trucks that load a maximum of 45 Tons, after
the arrival of the cargo trucks to the mining unit, the orders will be monthly for big bags of lime, which
are unloaded by forklift to the reagent depot. For the preparation of the milk of lime, the big bags
necessary for the daily preparation are transferred directly to the preparation area by means of the
forklift, for the process of making the milk of lime.

General Data Unit Nominal Design Source

Mill treatment ore T/d 1871 2033 A


Mill treatment ore T/h 77.94 85 A
Lime Consumption g/T 693 753 A
Lime Consumption kg / d 1278 1389 A
Lime Consumption kg / month 38346 41680 A
Sp Gr Lime 3.2 3.2 A
Lime Preparation

Lime solution m3 / d 24 26 A
Preparation % 5 5 D
Toilet m3 / d 24 26 A
Lime Kg / d 1278 1389 A
Frequency of preparation d 1 1 D

Lime tank
Selection of Model - TCP31800 D
Number 2
Dimension D
diameter m 3.24 D
height m 4.46 D
Volume m3 31.8 D
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - LIME PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

LIME PLANT
Unit Nominal Design Source

Mechanical stirrer
Number 1 D
Dimension
Lenght m - 4.0 D
Propeller diameter m - 1.2 D
Power HP - 3.0 D

Distribution

Grinding cc / min 4722 5133 A


Conditioner I - Zinc Flotation cc / min 12143 13199 A
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - Z-6 PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

POTASSIUM AMYL XANTHATE PLANT (PAX, Z-6)

PAX arrives in solid in the form of pellets in polypropylene bags with bags inside, with a capacity of 25
Kg. This reagent arrives from Arequipa in trucks that load a maximum of 10 Tons, after the arrival of the
cargo trucks to the mining unit. PAX bags will be ordered every 2 months, and are unloaded by forklift to
the reagent warehouse. For the preparation of the PAX mix, the bags necessary for the daily
preparation are transferred by forklift directly to the preparation area, then transferred to the reagent
preparation process.

General Data Unit Nominal Design Source

Mill treatment ore T/d 963 1047 A


Mill treatment ore T/h 40 44 A
PAX Consumption g/T 120 130 A
PAX Consumption kg / d 115.6 126 A
PAX Consumption kg / month 3467 3769 A
Sp Gr PAX 1.1 1.1 A
PAX Preparation

PAX solution m3 / d 1.0 1.1 A


Preparation % 10 10 D
Toilet m3 / d 1.0 1.1 A
PAX consumption Kg / d 115.6 126 A
Frequency of preparation d 1 1 D

PAX tank
Selection of Model - TPP130 D
Number 2 D
Dimension
diameter m - 1.23 D
height m - 1.5 D
Volume m3 - 1.7 D
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - Z-6 PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

POTASSIUM AMYL XANTHATE PLANT (PAX, Z-6)


Unit Nominal Design Source

Mechanical stirrer
Number 1 1 D
Dimension
Lenght m - 1.2 D
Propeller diameter m - 0.14 D
Power HP - 0.34 D

Distribution

Conditioner I - Pb-Ag Flotation cc / min 72 78 A


GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - Z-11 PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

SODIUM ISOPROPYL XANTHATE PLANT (SIPX, Z-11)

SIPX arrives as solid in the form of pellets in polypropylene bags with inner bags, with a capacity of 25
Kg. This reagent arrives from Arequipa in trucks that load a maximum of 10 Tons, after the arrival of the
cargo trucks to the unit. mining, (orders for SIPX bags will arrive every 2 months), are unloaded by
forklift to the reagent warehouse. For the preparation of the SIPX mixture, the bags necessary for the
daily preparation are transferred by forklift directly to the preparation area, for subsequent dosing.

General Data Unit Nominal Design Source

Tailing Bulk Pb-Ag T/d 907 986 A


Tailing Bulk Pb-Ag T/h 37.8 41 A
SIPX Consumption g/T 100 109 A
SIPX Consumption kg / d 91 99 A
SIPX Consumption kg / month 2722 2959 A
Sp Gr SIPX 1.12 1.12 A
SIPX Preparation

SIPX solution m3 / d 0.9 1.0 A


Preparation % 10 10 D
Toilet m3 / d 0.8 0.9 A
SIPX consumption Kg / d 91 99 A
Frequency of preparation d 1 1 D

SIPX tank
Selection of Model - TPP320 D
Number 2 D
Dimension
diameter m - 1 D
height m - 1.50 D
Volume m3 - 1.10 D
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - Z-11 PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

SODIUM ISOPROPYL XANTHATE PLANT (SIPX, Z-11)


Unit Nominal Design Source

Mechanical stirrer
Number 1 1 D
Dimension
Lenght m - 1.20 D
Propeller diameter m - 0.14 D
Power HP - 0.34 D

Distribution

Conditioner I - Pb-Ag Flotation cc / min 87 95 A


GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - R242 PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

AEROFLOAT PLANT (R242)

The R242 arrives liquid in iron cylinders with a capacity of 165 Kg. This reagent arrives from Arequipa in
trucks that load a maximum of 5 T, after the arrival of the cargo trucks to the mining unit, (cylinder
orders are every 3 months), they are unloaded by forklift to the reagent warehouse. For preparation, the
required daily cylinders are transferred by forklift directly to the preparation area; in this case the
reagent dosing is direct by means of dosing pumps.

General Data Unit Nominal Design Source

Mill treatment ore T/d 963 1047 A


Mill treatment ore T/h 40 44 A
R242 Consumption g/T 10 11 A
R242 Consumption kg / d 9.63 10.47 A
R242 Consumption kg / month 289 314 A
Sp Gr R242 1.14 1.14 A
R242 Preparation

R242 solution m3 / d 0.008 0.0092 A


Preparation % 100 100 D
Toilet m3 / d - - D
R242 consumption Kg / d 10 10 A
Frequency of preparation d 1 1 D

Distribution

Conditioner I - Pb-Ag Flotation cc / min 2.3 2.5 A


GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT ZINC SULPHATE PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

ZINC SULPHATE PLANT

Zinc Sulfate arrives as a solid in the form of fine white crystals in polypropylene bags with bags inside,
with a capacity of 25 Kg. This reagent arrives from Arequipa in trucks that load a maximum of 5 Tons.
After the arrival of the cargo trucks to the mining unit, the monthly orders of Zinc Sulfate bags are
unloaded by forklift to the reagent warehouse. For the preparation of the Zinc Sulfate mixture, the bags
necessary for the daily preparation are transferred by forklift directly to the preparation area, for
subsequent dosing at the corresponding points.

General Data Unit Nominal Design Source

Mill treatment ore T/d 963 1047 A


Mill treatment ore T/h 40 44 A
ZnSO4 Consumption g/T 100 109 A
ZnSO4 Consumption kg / d 96 105 A
ZnSO4 Consumption kg / month 2889 3141 A
Sp Gr ZnSO4 1.18 1.18 A
Zinc Sulphate Preparation

Zinc Sulphate solution m3 / d 0.9 1.0 A


Preparation % 10 10 D
Toilet m3 / d 0.87 0.94 A
Zinc Sulphate consumption Kg / d 100 109 A
Frequency of preparation d 1 1 D

Zinc Sulphate tank


Selection of Model - TPP100 D
Number 2 D
Dimension
diameter m - 1.23 D
height m - 1.5 D
Volume m3 - 1.7 D
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT ZINC SULPHATE PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

ZINC SULPHATE PLANT


Unit Nominal Design Source

Mechanical stirrer
Number 1
Dimension
Lenght m - 1.2 D
Propeller diameter m - 0.2 D
Power HP - 0.7 D

Distribution

Conditioner I - Pb-Ag Flotation cc / min 658 715 A


GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - COPPER SULPHATE PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

COPPER SULPHATE PLANT

Copper Sulfate arrives as a solid in the form of fine blue crystals in polypropylene bags with a capacity
of 25 Kg. This reagent arrives from Arequipa in trucks that load a maximum of 30 Tons. After the arrival
of the cargo trucks to the mining unit, we proceed to unload, (Copper Sulfate orders are every 2
months), by forklift to the reagent warehouse. For the preparation of the Copper Sulfate mixture, the
bags necessary for the daily preparation are transferred by forklift directly to the preparation area, then
by means of an electric key the bags are transferred to the reagent preparation circuit.

General Data Unit Nominal Design Source

Mill treatment ore T/d 907 986 A


Mill treatment ore T/h 38 41 A
CuSO4 Consumption g/T 420 457 A
CuSO4 Consumption kg / d 381 414 A
CuSO4 Consumption kg / month 11434 12428 A
Sp Gr CuSO4 1.05 1.05 A
Copper Sulphate Preparation

Copper Sulphate solution m3 / d 3.79 4.12 A


Preparation % 10 10 D
Toilet m3 / d 3.43 3.73 A
Copper Sulphate consumption Kg / d 381 414 A
Frequency of preparation d 1 1 D

Copper Sulphate tank


Selection of Model - TPP5700 D
Number 2 D
Dimension
diameter m - 1.95 D
height m - 2 D
Volume m3 - 5.7 D
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - COPPER SULPHATE PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

COPPER SULPHATE PLANT


Unit Nominal Design Source

Mechanical stirrer
Number 1 D
Dimension
Lenght m - 1.20 D
Propeller diameter m - 0.16 D
Power HP - 0.74 D

Distribution

Conditioner I - Zinc Flotation cc / min 2632 2861 AND


GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - MIBC PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

METHYL ISOBUTYL CARBINOL PLANT

The MIBC arrives liquid in plastic cylinders with a capacity of 25 Kg. This reagent arrives from Arequipa
in trucks that load a maximum of 5 Tons, after the arrival of the cargo trucks to the mining unit, (orders
are every 3 months), are unloaded by forklift to the reagent warehouse. For preparation, the required
daily cylinders are transferred by forklift directly to the preparation area; in the case of this reagent, the
dosage is added directly by means of dosing pumps.

General Data Unit Nominal Design Source

Mill treatment ore T/d 1871 2033 A


Mill treatment ore T/h 78 85 A
MIBC Consumption g/T 24 26 A
MIBC Consumption Kg / d 45 49 A
MIBC Consumption Kg / month 1347 1464 A
Sp Gr MIBC 0.81 0.81 A
MIBC Preparation

MIBC solution m3 / d 0.1 0.1 D


Preparation % 100 100 D
Toilet m3 / d - - D
MIBC consumption Kg / d 45 49 A
Frequency of preparation d 1 1 D

Distribution

Conditioner I - Pb-Ag Flotation cc / min 12 13 A


Conditioner III - Zinc Flotation cc / min 10 10 A
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - FLOCCYLANT PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

FLOCCULANT PLANT

The Flocculant arrives in the form of powder in plastic bags with a capacity of 25 Kg. This reagent
arrives from Arequipa in trucks that load a maximum of 5 T, after the arrival of the cargo trucks to the
mining unit, (orders of flocculant sacks are every 3 months), they are transported by forklift to the
reagent warehouse. For the preparation of the Flocculant, the bags necessary for the daily preparation
are transferred by forklift directly to the preparation area, then by means of dispensers they are
transferred to the corresponding points.

General Data Unit Nominal Design Source

Mill treatment ore T/d 883 959 A


Mill treatment ore T/h 37 40 A
FLOCCULANT Consumption g/T 25 27 A
FLOCCULANT Consumption kg / d 22 24 A
Flocculant Consumption kg / month 662 720 A
Sp Gr Flocculant 1.1 1.1 A
Flocculant Preparation for Mixing tank

Flocculant solution m3 / d 4.41 4.80 A


Preparation % 0.50 0.50 D
Toilet m3 / d 4.39 4.77 A
Flocculant consumption Kg / d 22 24 A
Frequency of preparation d 1 1 D

Flocculant tank
Selection of Model - TPP5700 D
Number 2 D
Dimension
diameter m - 1.95 D
height m - 2 D
Volume m3 - 5.7 D
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - FLOCCULANT PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

FLOCCULANT PLANT
Unit Nominal Design Source

Mechanical stirrer
Number 1 1 D
Dimension
Lenght m - 1.5 D
Width m - 1.7 D
Power HP - 1.5 D

Distribution

Tailing cc / min 3062 3328 A


GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - LEAD NITRATE PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - SULFURIC ACID PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

SULFURIC ACID PLANT


Unit Nominal Design Source

The Sulfuric Acid arrives as a liquid in plastic IBC drums with a capacity of 1200 Kg. This reagent
arrives from the port of in trucks that load a maximum of 30 Tons, after the arrival of the cargo trucks to
the mining unit, it is unloaded to the reagent warehouse. For the preparation, the necessary daily drums
are transferred by means of a forklift directly to the preparation area. In the case of this reagent, the
dosage is direct by dosing pumps.

General Data

Mill treatment ore T/d 1000 1087 TO


Effluent flow m3 / h 81 88 TO
Sulfuric Acid Consumption g / m3 191 207 TO
Sulfuric Acid Consumption kg / month 11157 12127 D
Sp Gr Sulfuric Acid 0.81 0.81 TO

Sulfuric Acid Preparation

Sulfuric Acid solution m3 / d 0.2 0.2 D


Preparation % 98 98 D
Toilet m3 / d - - D
Sulfuric Acid consumption Kg / d 372 404 AND
Frequency of preparation d 1 1 D

Distribution

Recirculation flow dosage cc / min 140 152 AND


GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - COPPER SULPHATE PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - FERRIC SULPHATE PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - FERRIC SULPHATE PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - FOCCULANT PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - FOCCULANT PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - BORAX PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - SODIUM NITRATE PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - FLUORSPAR PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 PLANT DESIGN
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

THICKNESS HOPPER

General Data Unit Nominal Design Source

Tonnage per hour T/h 156.25 169.83696 A


Ability T 195.31 212.29756 A
%Humidity % 2 2 A
Mineral density T / m3 3.185 3.185 B
Corrected density T / m3 1.911 1.911 A
Total volume m3 102.205 111.09239 A
Availability % 100 92 B

Hopper

T T 195.31 212.30 A
Vtotal m3 102.205 111.09 A
𝜌𝑐𝑜𝑟𝑟𝑒𝑔𝑖𝑑𝑎 T / m3 1.911 1.911 A
𝜌𝑚𝑖𝑛𝑒𝑟𝑎𝑙 T / m3 3.185 3.185 B
𝐹𝑒𝑣 0.4 0.4 D
to m 4.22648 4.59 A
x m 2.11324 2.30 A
h m 1.05662 1.15 A
β ° 45 45 D

Grill

Long m 4.22648 4.59 A


Width m 4.22648 4.59 A
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 PLANT DESIGN
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

FINE HOPPER
Unit Nominal Design Source

General Data

Tonnage per hour T/h 156.25 169.84 A


Ability T 190.29 206.84 A
%Humidity % 2.00 2.00 A
Mineral density T / m3 3.19 3.19 B
Total volume m3 73.59 79.98 A
Availability % 100 92 B

Hopper

T TM 187.50 203.80 A
Vtotal m3 73.58712 79.99 A
𝜌𝑐𝑜𝑟𝑟𝑒𝑔𝑖𝑑𝑎 TM / m3 2.55 2.55 A
𝜌𝑚𝑖𝑛𝑒𝑟𝑎𝑙 TM / m3 3.185 3.185 B
𝐹𝑒𝑣 0.2 0.2 D
D m 3.9192 4.26 A
H m 8.2708 8.99 A
h m 4.9128 5.34 A
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - LIME PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

FEEDERS
Unit Nominal Design Source

APRON FEEDER

Tons per hour T/h 156.25 169.83696 A


SG T / m3 3.185 3.185 B
Percentage of solids % 98 98 B
Availability % 100 92 B

Model BW 1020
Apron width m - 1 C
Power Kw - 20 C
Feed size max. mm - 600 C
Ability T/h - 200 C

GRIZZLY FEEDER

Tons per hour T/h 156.25 169.83696 A


SG T / m3 3.185 3.185 B
Percentage of solids % 98 98 B

Model VF544-2V TM
Width m - 1.3 C
Length m - 4.9 C
Power Kw - 15 C
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 PLANT DESIGN
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

DUST COLLECTOR
Unit Nominal Design Source

General Data

Tons per hour T/h 156.25 169.83696 A


SG T / m3 3.185 3.185 B
Percentage of Solids % 98 98 B
Availability % 100 92 B

TEAM

Model DF0 3-48 DONALDSON

Air consumption m3 / h - 33.8 C


Air pressure PSI - 90 C
Number of filters - 24 C
Equipment weight lbs - 8100 C
Width m - 4
Height m - 3.5 C
Long m - 2 C
Power Kw - 3.72 C
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - Z-6 PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

ELECTROMAGNET
Unit Nominal Design Source

General Data

Tons per hour T/h 156.25 169.83696 A


SG T / m3 3.185 3.185 B
Percentage of Solids % 98 98 B
Availability % 100 92 B

Model ELIM-828C

Recommended extraction height mm 280 C


Power Kw 3 C
Dimensions
B mm 800 C
C mm 680 C
D mm 700 C
AND mm 580 C
F mm 440 C
G mm 511 C
I mm 6 C
J mm 72 C
K mm 40 C
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 PLANT DESIGN
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

METAL DETECTOR
Unit Nominal Design Source

General Data

Tons per hour T/h 156.25 169.83696 A


SG T / m3 3.185 3.185 B
Percentage of Solids % 98 98 B
Availability % 100 92 B

Model MD 1000 MiningLand

Power Kw - 3 C
Dimensions
TO mm - 1090 C
B mm - 50 C
C mm - 400 C
D mm - 470 C
AND mm - 730 C
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 PLANT DESIGN
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

CHANCADO GIRDLE SCALE


Unit Nominal Design Source

General Data

Tons per hour T/h 156.25 169.83696 A


SG T / m3 3.185 3.185 B
Percentage of Solids % 98 98 B
Availability % 100 92 B

Model 10-20-1 PRESSURE

Number of weighing rollers - 1 C


Number of load cells - 1 C
Accuracy (±) % - 0.5 C
Roller diameter mm - 120 C
Belt speed m/s - 2 C
Conveyor width mm - 900 C
Number of idlers in the weighing area - 6 C
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 PLANT DESIGN
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

BELT SCALE IN DMS


Unit Nominal Design Source

General Data

Tons per hour T/h 40.126 43.615217 A


SG T / m3 3.185 3.185 B
Percentage of Solids % 98 98 B
Availability % 100 92 B

Model 10-17-2 PRESSURE

Number of weighing rollers 2 C


Number of load cells 2 C
Accuracy (±) % 0.25 C
Roller diameter mm 120 C
Belt speed m/s 2 C
Conveyor width mm 900 C
Number of idlers in the weighing area 6 C
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 PLANT DESIGN
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

AUTOMATIC SAMPLERS
Unit Nominal Design Source

General Data

Kilograms Kg 57.765 62.788043 A


SG 3.185 3.185 B
Percentage of Solids % 98 98 B
Availability % 100 92 B

Model HAMMER

Velocity m / s2 - 2.5 C
Bandwidth mm - 900 C

Model ROTARY

Velocity m / s2 - 0.6 C
Bandwidth mm - 900 C
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - FLOCCULANT PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - LEAD NITRATE PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - SULFURIC ACID PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:

SULFURIC ACID PLANT


Unit Nominal Design Source

The Sulfuric Acid arrives as a liquid in plastic IBC drums with a capacity of 1200 Kg. This reagent
arrives from the port of in trucks that load a maximum of 30 Tons, after the arrival of the cargo trucks to
the mining unit, it is unloaded to the reagent warehouse. For the preparation, the necessary daily drums
are transferred by means of a forklift directly to the preparation area. In the case of this reagent, the
dosage is direct by dosing pumps.

General Data

Mill treatment ore T/d 1000 1087 TO


Effluent flow m3 / h 81 88 TO
Sulfuric Acid Consumption g / m3 191 207 TO
Sulfuric Acid Consumption kg / month 11157 12127 D
Sp Gr Sulfuric Acid 0.81 0.81 TO

Sulfuric Acid Preparation

Sulfuric Acid solution m3 / d 0.2 0.2 D


Preparation % 98 98 D
Toilet m3 / d - - D
Sulfuric Acid consumption Kg / d 372 404 AND
Frequency of preparation d 1 1 D

Distribution

Recirculation flow dosage cc / min 140 152 AND


GREENFIELD PROJECT FROM 2500 T / d

DESIGN CRITERIA Document:


Sheet:
Section: 6 REAGENTS PLANT - PLANT
Initial Revision: H. Parra Date: Rev .:
Last Revision: H. Parra Date: Rev .:
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - COPPER SULPHATE PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - FERRIC SULPHATE PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - FERRIC SULPHATE PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - FOCCULANT PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - FOCCULANT PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - BORAX PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - SODIUM NITRATE PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0
GREENFIELD PROJECT FROM 1000 T / d

DESIGN CRITERIA Document: DC-03


Sheet: 6 of 6
Section: 6 REAGENTS PLANT - FLUORSPAR PLANT
Initial Revision: H. Parra Date: 6/13/2020 Rev .: TO
Last Revision: H. Parra Date: 9/26/2020 Rev .: 0