COATING
MAS
CONSTRUCTIONS Doc No.: MAS-BGRL-TE-JP-A4- 1 3,
Rev - 00
coNsr-nrnxr I M/s
I CONSULTANT luv* rnacrEBEL ENGINEERINc
TRACTEBEL ENGINEERING
conrnacroR I M/s
I CONTRACTOR
ll
ws MAS
nms coNSTRUCTIoNS
CONSTRUCTIONS
1 MAS CONSTRUCTIONS r,
BGRL/TRACTEBEL
PRE,PARED CHECKED
CHECKED I APPROVED
APPROVEI)
NAME: r,pffi*knna
lNai*m, 1GGDA*a^/@/il RA*.wkaw
SIGNATURE: \1>vd tg6,rUf,, ,'^$S s+=
DATE: ,olrXr] % lo>lzrro
TROCEI}URS FOR FIELD JOINT 14
COATING Ep
{it.E#
r.-*r6u1q/&*I:
gGssGy*Gs
MAS
CONSTRUCTIONS Doc No.: MAS-BGRL-TE-JP-A4- 1 3,
Rev - 00
!a3toir:i,"f
INDEX
1.0 Purpose -J
a
2.0 Reference J
11.0 Documentation
12.0 Note 7
iff!-.-,*u**t
,'r{'i#,li;l*:i;,r}
*
it- t"-... ..*l't'"ii
""D",ii
nro. MAS-BGRL-TE-Jp-A4- 1 3,Rev -00 Page 2 of8
PROCEDURE FOR T'IELD JOINT 6,fu_
MAS
COATING @
CONSTRI}CTIONS Doc No. : MAS-BGRL-TE-JP-A4- I 3,
Rev - 00
1.0 PIJRPOSE:
This procodure covers the method for joint coating of field weld joints, coating repair of Field
weld joints and pre-coated pipe sections.
2.0 REFERENCE:
r BGRL/TRACTEBEL specification-
r L
ASTM D-149: Standard Test Methods of Dielectric Breakdown voltage and Dielectric strength of
-; solid electrical insulating materials at commercial frequencies.
1 . ASTM D-257: Standard Test Methods for D-C Resistance or conductance of insulating materials.
o DIN EN12068 Class C: Cathodic Protection-External Organic Coatings for the Corrosion
;-
Protection of Buried Steel Pipelines.
r Manufactures Test certificates/result for each batch ofjoint lrepair coating material.
r Date of manufacture & expuy for each batch ofjoint lrcpar coating material-
o Specific application inskuctions forpipelinejoint / repair coating.
o Specific storage & handling instruction for coating materials.
3.0 cOATHG,MATERTAIS:
r Joint coating material shall be Heat Shrink Wrap around sleeves "HTLP 80'and coating repair L
shall be "PERP" of NOs RAYCIffiM or equivalent.
c Raychem heat shrink sleeve HTLP-8O suitable for the following pipe diameters:
1 HTLP 80 2 PERP
-l Epoxy - Part A and Part B 4 Mixing sticks, cups etc.
5 Applicator pads 6 EPOXYhandpump
7 LPG Torch, Regglators, Hose pipes I LPG cylinder
9 Wet film thickness gauge. 10 Contact pyrometer
11 Silicon hand roller (curved) 12 Silicon hand roller (straighQ
Standard safety wears such as gloves, goggles,
13 t4 Portable peel tester.
helmets, apron, asbestos leg guards etc.
l5 Mobile blasting equipment. t6 Coating thickness gauge.
t7 Holiday detector. 18 Digital thennometer
t9 Hygrometer.
r Prior to use ofjoint coating materiqls, following documents need to be verified & referred.
a. Manufacfurer's test certificates / result of each batch of materials.
b. Date of manufacture and expiry.
o. Specifrc applioation instructions.
d. Specific storage & handling instructions.
SURFACEP-RDPAR TIONFORCOA,TINGAPPLICATION:
The ends of existing coating on both sides of weld joint shall be inspected, un-bounded coating, if
any, shall be removed and ends shall be chamfered at an angle of 15o from pipe line surface.
Before application of coating material, pipe surface shall be thoroughly cleaned of oil, gre:me or
any foreign rnaters by wiping with rags soaked with non-naphtha based suitable solvents such as
benzene and dried followed by compressed air blasting using mineral abrasive / coarse sand in
accordance with SSPC - SPl code.
The abrasive blast materials / coarse sand should be dry and free from any impurities, inclusions or
oil and shall be rernoved after blasting usiag btush or compressed air before application of coating.
Blast cleaning operation should not be carried out if relative humidity exceeds 80Yo.
The comprcssed air used for blasting operation should be dry & free &om oiletc... it should be
6q*ffir checked at the time of start of blast cleaning and thereafter, every 4 }ks. By checking separators &
trap installed on compressors.
. After blast cleaning, the cleaned pipe surface shall be inspected for defects such as silvets,
laminations, leafrnf,-scores and indentation slugs etc... & repaired by grinding as directed
by
BGRL/TRACTEBEL fi eld Engineer.
o The standard finish for cleaned pipe surface should conform to SA 2 % Swedish Standard SIS
055900. The pipe after blasting should have an anchor pattem of 50 to 70 p. This
shall be
measured using iy Electrometerl press 'o' Film / comparator. AII required rnaterial / equipments
shall be made available at site for carry out inspection'
The surface to be pre-heated to 70o C + 10" C with LPG burners prior to application of
primer. The
temperature should be checked using digital temperature indicator.
The heat shrink sleeve shall be wrapped around the joint after applying mixed primer,
overlapping
the existing pipe coating by 100 mm on each side.
patch off to
The wraparotrnd sle€ve should be wrapped around the prpe by positioning the closer
one side of the pipe in one side l0'Oclock or 2'O clock position having the edge of the under
laying layer facing upward with the upper layer overlapping minimum by 100 mm-
by
The sleeve shall be"tightly around the pipe joint by heating with LPG torch and forth followed
have
*11*, pr*r*ing-over t[e surface when heated above 125o C. The frnished coating should no
entrapped air"bubbles. The coating should not be disturbed until the adhesive has solidified
and
shall have a finished overlap afteishrinking to the pipe coating by 100mm on both sides of CTE
coated pipe and 5Qmm on both side of 3LPE coated pipes'
seam, extra
For maintaining the required coating thickness, removal of entrapped air from the weld
hot melt adhesive shail be appliel on both side of the weld seam as per requirement before
wrapping around the sleeve.
on the prepared
pre-heating a coat'of 100% solvent free liquid epoxy primer shall be applied
surface. ffffp-gO sleeves shall be applied uu p*t the joint coating procedure mBntioned above'
a
ar}a, pinholes
a For repair of defective areas less than 100 CM', the coating around the defective
shall be proper$
etc... shall be removed to give a shape similar to the truncated cone. The area
metted with gas torch and
brush cleaned. The truncatJ cone shall be filled with mastic compound,
adjoining pipe coating. A heat
smoothened so thalit is finished to the sarne thickness as that of the
pipe coating' The patch
.irriot patch shall be positioned extending at least 50mm on the adjoining
shall be heat shrunk with the help of LPG torch and roller'
i;r;n,,,,.c1,l
Page 6 of 8
Doc No. MAS-BGRL-TE-JP-A4-1 3,Rev -00
PROCEDURE B'OR FIELD JOINT
COATING
MAS
CONSTRUCTIONS Doc No. : MAS-BGRL-TE-JP-A4- I 3,
Rev - 00
r No failure either adhesion to steel, adhesion to backing or adhesion to pipe coating is perrnitted,
The test is accepted only when peeled strip comes out only from the adhesive layer of the joint
coating. The required peel strength shall be as per DIN - 306i2.
r In case joint fails in the peel test, following methodology is to be adopted.
t Stop flrrther joint coating until remedial measures are taken against the cause of failure.
I Two more coated joints (randomly setrected) of that day productions are subjected to peetr testing
and if any of these fails, the entire production of the day is to be rejected.
r Determine the cause of failure of coating.
r The coating operation should recommence only after remedial measures are taken and accepted by
MECON /GArL (I) LTD.
11. DOCUMENTATION:
12.0 NOTE:
-o9r$N Any other procedure not covered here but as per contractual terms shall also form a part of work
w&,
S-."t*\
\U \\
case of any conflicts between this procedure and contract specification, then later shall govem.
MAS CONSTRUCTIONS
APPROYED
oqloJ*zo oe f ozlwza
'HP':HOLDPOINT
BGRI-ITRACTEBEL
PROJECT : LAYINGOF3 LPE COATED STEEL PIPELINE INBIDAR
ON SEAM
No. ofJoints