Professional Documents
Culture Documents
1. A large industrial firm purchases several new word processors at the end of each year,
the exact number depending on the frequency of repairs in the previous year. Suppose
that the number of word processors, X, purchased each year has the following proba-
bility distribution
x 0 1 2 3
probability 1/10 3/10 2/5 1/5
a. If the cost of desires model is $1200 per unit and at the end of the year a refund
of 50X 2 dollars will be issued, how much can this firm expect to spend a new word
processors during this year?
b. Find expected value and variance for 2X 2 − 4.
Sol:
a) [5] The expect money to spend=E(1200X) − E(50X 2 ) = 1200E(X) − 50E(X 2 )
where E(X) = 0(1/10) + 1(3/10) + 2(2/5) + 3(1/5) = 17/10 and E(X 2 ) = 0(1/10) +
1(3/10) + 4(2/5) + 9(1/5) = 37/10 so
E(1200X) − E(50X 2 ) = 1200(17/10) − 50(37/10) = 1885
b) [4] E(2X 2 − 4) = 2E(X 2 ) − 4 = 2(37/5) − 4 = 10.8,
V (2X 2 − 4) = 4V (X 2 ) = 4(E(X 4 ) − (E(X 2 ))2 ), where E(X 4 ) = 0(1/10) + 1(3/10) +
16(2/5) + 81(1/5) = 22.9, so V (X) = 4(22.9 − (3.7)2 ) = 36.84
2. The density function of the continuous random variable X, the total number of hours
in units of 100 hours that a family runs a vacuum cleaner over a period of one year is
x
0<x<1
f (x) = 2−x 1≤x<2
0 otherwise.
Find the average number of hours per year that families run their vacuum cleaner.
Sol: [8]
R1 R2
The average number of hours per year=100(E(X)) = 100( 0 x2 dx + 1 x(2 − x)dx) =
100([x3 /3]10 + [x2 + x3 /3]21 ) = 100(1) = 100
1
a. What is the probability that in a given hour the staff cannot accommodate the
patient traffic?
b. What is the probability that more than 20 emergencies arrive during a 3-hour shift?
Sol:
a) [3] λ = 5 per hour, so P (X > 10) = 1 − P (x ≤ 10) = 1 − 0.9863 = 0.0137
b) [3] λ = 15 per 3 hour, so P (X > 20) = 1 − P (x ≤ 20) = 1 − 0.917 = 0.083
4. A roofing contractor offers an inexpensive method of fixing leaky roofs. However, the
method is not foolproof. The contractor estimates that after the job is done, 10 percent
of the roofs will still leak.
a. The resident manager of an apartment complex hire this contractor to fix the roof
a six building. What is the probability that after the work has been done, at least two
of these roofs will still leak?
b. The contractor offers a guarantee that pays $100 if a roof still leaks after he has
worked on it. If he works on 81 roofs, find the mean and standard deviation of the
amount of money that he will have to pay as a results of this guarantee.:
Sol:
a) [4] X follows Binomial distribution with n = 6, p = 0.1, so
P (X ≥ 2) = 1 − [P (X = 0) + P (X = 1)] = 1 − (C06 (0.1)0 (0.9)6 + C16 (0.1)1 (0.9)5 ) ==
1 − 0.8857 = 0.1143
b) [4] n = 81, p = 0.1, E(100X) = 100E(X) = 100(81 ∗ 0.1) = 810,
√
σ100X = 100 81 ∗ 0.1 ∗ 0.9 = 270
5. A lawyer commutes daily from his suburban home to his midtown office the average
time for a one-way trip is 24 minutes, with a standard deviation of 3.8 minutes. Assume
the distribution of the trip time to be normally distributed.
a. What is the probability that a trip will take at least 1/2 hour?
b. If the office opens at 9:00am and the lawyer leaves his house at 8:45am daily, what
percentage of the time is he late for work?
c. If he leaves the house at 8:35am and coffee is served at the office from 8:50am until
9:00am. What is the probability the has misses coffee?
d. Find the length of time above which find the slowest 15% of trips.
e. Find the probability that 2 of the next 3 trips will take at least 1/2 hour?
Sol:
a) [3] X ∼ N (24, (3.8)2 ), so P (X > 30) = 1 − P (Z < 30−24 3.8
) = 1 − P (Z < 1.58) =
0.0571
b) [3] P (X > 15) = 1 − P (Z < 15−243.8
) = 1 − P (Z < −2.37) = 0.9911, he will be late
in 99.11% of the time.
c) [4] P (X > 25) = 1 − P (Z < 25−243.8
) = 1 − P (Z < 0.26) = 0.3974
2
d) [4] P (X < x) = 0.15, or P (Z < z) = 0.15 → z w 1.04, then x = 3.8(1.04) + 24 =
27.952
e) [4] Y : number of trips which take at least 1/2 hour, then Y ∼ Bin(3, 0.057), and
P (Y = 2) = C23 (0.057)2 (1 − 0.057) = 0.0092
T = 10X + (5 − X) = 9X + 5
−n
First,E(X) = n M N
= 5(2/20) = 0.5, V ar(X) = n MN
(1 − M
N
)( N
N −1
) = 5(0.1)(1 −
0.1)(15/19) = 0.322
so E(T ) = 9E(X) + 5 = 9.5,
√
V ar(T ) = 92 V ar(X) = 81(0.355) = 28.755, σT = 28.755 = 5.362
Sol:
R1
a) [4] P (X > 0.4) = 0.4 (12x2 − 12x3 )dx = (4x3 − 3x4 )|10.4 = 4 − 3 − (0.256 − 0.0768) =
3
0.8208
b) [5] By definition of cd F (x)
Z x 0R
x≤0 0
x≤0
x
F (x) = f (t)dt = 0
(12y 2 − 12y 3 )dy 0<x<1 = 4x3 − 3x4 0<x<1
−∞
1 x≥1 1 x≥1
8. The number of flaws on a VHS magnetic tape produced continuously at a factory fol-
lows a Poisson distribution with an average of 0.01 flaws per meter. A standard VHS
cassette tape contains 250 meters of magnetic tape.
a. What is the probability that there are at least two flaws in a single VHS cassette
tape?
b. What is the probability that there are no flaws in a single VHS cassette tape; that
is, a tape is flawless?
c. In a random sample of 20 cassettes, what is the probability that at least three of
them are flawless?
Sol:
Let X represent the number of flaws in single VHS cassette tape, then X ∼ P (λ =
0.01 × 250 = 2.5) h −2.5 0 i
e 2.5 e−2.5 2.51
a) [3] P (X > 2) = 1 − [P (X = 0) + P (X = 1)] = 1 − 0!
+ 1! = 0.7127
−2.5 0
b) [4] P (X = 0) = e 0!2.5 = 0.0821
c) [4] Let Y represent the number of flawless VHS cassette tapes out of the 20 tapes.
Then Y ∼ B(20, 0.0821).
P (Y > 3) = 1 − [P (Y = 0) + P (Y = 1) + P (Y = 2)]
1 − 20 (0.0821)0 0.917920 + 20 (0.0821)1 0.917919 + 20
0 1 2
(0.0821)2 0.917918 = 0.2233
9. For each of the following determine the value of c for which p(x) is a pmf:
a. p(x) = c(1/6)x , x = 1, 2, 3, · · ·
b. p(x) = cx, x = 1, 2, 3, · · · , n
Sol:
P
The value of constant c is found from the condition all x p(x) = 1
a) [4] Using the geometric formula
∞
X 1
qk = , |q| < 1,
k=0
1−q
4
we get
∞ ∞
!
X
x
X
x 1 c
1=c (1/6) = c (1/6) − 1 =c −1 =
x=1 x=0
1 − 1/6 5
hence c = 5.
b) [5] Recall that
n
X n(n + 1)
k=
k=1
2
therefore n
X n(n + 1)
c =1
x=1
2
2
and hence c = n(n+1)
.
10. Twenty percent of all cars manufactured by a certain company have a defective trans-
mission system. If a dealer has sold 200 of these cars, what is the probability that it
will need to service at most 50 of them?
Sol: [5]
p = 0.2, n = 200, so np = 40 > 10, npq = 32 > 10
P (X 6 50) = P (Z 6 50−40+0.5
√
32
) = P (Z < 1.86) = 0.9686
11. A machine to fill cereal boxes produces fills (in ounces) that are normally distributed.
Suppose that its standard deviation σ can be carefully adjusted. What is the largest
value of σ that will allow the actual value dispensed to be within one ounce of the
mean with probability at least 0.95?
Sol:[5]
X ∼ N (µ, σ 2 )
P (µ − 1 6 X 6 µ + 1) > 0.95 → P ( µ−1−µ σ
6 Z 6 µ+1−µ
σ
) = P ( −1
σ
6 Z 6 σ1 ) > 0.95
→ Φ( σ1 ) − Φ( −1
σ
) = 2Φ( σ1 ) > 0.95 → Φ( σ1 ) > 0.975 → σ1 > 1.96 → σ 6 0.51