You are on page 1of 11

Pressure Vessel Test Certificate

Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)


Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/01
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/01)
No. of the pressure vessel SWP – 7.0 Kg/cm2, Sr. No. PE2244
Location: WTP
4. Name & address of manufacturer - M/s ; NA
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2019 Thickness of wall/shell
- 5.0/6.0 mm
b) Date on which vessel was first taken into use - 2019
c) Safe working pressure recommended by manufacturer - 7.0 Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 5.0 mm, 5.1 mm & D= 6.0 mm, 6.0 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 7.0 Kg/cm2
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436
Pressure Vessel Test Certificate
Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)
Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/02
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/02)
No. of the pressure vessel SWP – 8.5Kg/cm2, Sr. No. PE2385
Location: TG Building
4. Name & address of manufacturer - M/s ; NA
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2019 Thickness of wall/shell
- 6.0/8.0 mm
b) Date on which vessel was first taken into use - 2019
c) Safe working pressure recommended by manufacturer - 7.0 Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 6.0 mm, 6.1 mm & D= 8.0 mm, 8.0 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 7.0 Kg/cm2
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436
Pressure Vessel Test Certificate
Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)
Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/03
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/03)
No. of the pressure vessel SWP – 7.0Kg/cm2, Sr. No. ARR301AQ
Location: AQC boiler
4. Name & address of manufacturer - M/s ; Shree Samarth Tech
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2018 Thickness of wall/shell
- 8.0/8.1 mm
b) Date on which vessel was first taken into use - 2018
c) Safe working pressure recommended by manufacturer - 7.0 Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 8.0 mm, 8.1 mm & D= 8.1 mm, 8.2 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 7.0 Kg/cm2
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436
Pressure Vessel Test Certificate
Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)
Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/04
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/04)
No. of the pressure vessel SWP – 7.0Kg/cm2, Sr. No. ARP301PH1
Location: PH1-A
4. Name & address of manufacturer - M/s ; Shree Samarth Tech
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2018 Thickness of wall/shell
- 8.0/8.1 mm
b) Date on which vessel was first taken into use - 2018
c) Safe working pressure recommended by manufacturer - 7.0 Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 8.0 mm, 8.1 mm & D= 8.1 mm, 8.2 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 7.0 Kg/cm2
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436
Pressure Vessel Test Certificate
Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)
Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/05
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/05)
No. of the pressure vessel SWP – 232PSI, Sr. No. ESK/520-2753/18-19
Location: TG Builiding
4. Name & address of manufacturer - M/s ; Ingersoll Rand
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2019 Thickness of wall/shell
- 6.0/6.1 mm
b) Date on which vessel was first taken into use - 2019
c) Safe working pressure recommended by manufacturer - 232PSI Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 6.0 mm, 6.0mm & D= 6.1 mm, 6.0 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 232PSI
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436
Pressure Vessel Test Certificate
Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)
Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/06
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/06)
No. of the pressure vessel SWP – 7.0Kg/cm2, Sr. No. ARR301PH2
Location: PH1-B
4. Name & address of manufacturer - M/s ; Shree Samarth Tech
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2018 Thickness of wall/shell
- 8.0/8.2 mm
b) Date on which vessel was first taken into use - 2018
c) Safe working pressure recommended by manufacturer - 7.0 Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 8.0 mm, 8.1 mm & D= 8.1 mm, 8.2 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 7.0 Kg/cm2
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436
Pressure Vessel Test Certificate
Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)
Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/07
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/07)
No. of the pressure vessel SWP – 3.0Kg/cm2
Location: DM Plant
4. Name & address of manufacturer - M/s ; NA
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2019 Thickness of wall/shell
- 5.0/6.0 mm
b) Date on which vessel was first taken into use - 2019
c) Safe working pressure recommended by manufacturer - 3.0 Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 5.0 mm, 5.1 mm & D= 6.0 mm, 6.1 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 3.0 Kg/cm2
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436
Pressure Vessel Test Certificate
Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)
Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/08
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/08)
No. of the pressure vessel SWP – 3.0Kg/cm2
Location: DM Plant
4. Name & address of manufacturer - M/s ; NA
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2019 Thickness of wall/shell
- 5.0/6.0 mm
b) Date on which vessel was first taken into use - 2019
c) Safe working pressure recommended by manufacturer - 3.0 Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 5.0 mm, 5.1 mm & D= 6.0 mm, 6.1 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 3.0 Kg/cm2
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436
Pressure Vessel Test Certificate
Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)
Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/09
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/09)
No. of the pressure vessel SWP – 3.0Kg/cm2
Location: DM Plant
4. Name & address of manufacturer - M/s ; NA
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2019 Thickness of wall/shell
- 5.0/6.0 mm
b) Date on which vessel was first taken into use - 2019
c) Safe working pressure recommended by manufacturer - 3.0 Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 5.0 mm, 5.1 mm & D= 6.0 mm, 6.1 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 3.0 Kg/cm2
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436
Pressure Vessel Test Certificate
Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)
Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/10
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/10)
No. of the pressure vessel SWP – 3.0Kg/cm2
Location: DM Plant
4. Name & address of manufacturer - M/s ; NA
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2019 Thickness of wall/shell
- 5.0/6.0 mm
b) Date on which vessel was first taken into use - 2019
c) Safe working pressure recommended by manufacturer - 3.0 Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 5.0 mm, 5.1 mm & D= 6.0 mm, 6.1 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 3.0 Kg/cm2
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436
Pressure Vessel Test Certificate
Form No. 9 (Rule 67 of the Chhattisgarh Factories Rules 1962)
Date of Test : 11.02.2021 Due Date : 10.08.2021
Report No.- RKP/CP/20-21/AMCP/PV/11
1. Name of Occupier of factory - M/s NUVOCO Vistas Corporation Limited
(Arasmeta Cement Plant)
2. Situation & Address of the Factories - P.O- Gopal Nagar,
Dist. – Janjgir Champa (C.G)
3. Name, description & Distinguishing - AIR RECEIVER (Id: PV/11)
No. of the pressure vessel SWP – 3.0Kg/cm2
Location: DM Plant
4. Name & address of manufacturer - M/s ; NA
5. Nature of process in which it is used - For storage & supply of compressed air
6. Particulars of Pressure Vessel
a) Date of Construction - 2019 Thickness of wall/shell
- 5.0/6.0 mm
b) Date on which vessel was first taken into use - 2019
c) Safe working pressure recommended by manufacturer - 3.0 Kg/cm2
d) Date of previous examination or test - Done by us on 26.04.2019
7. Date of last hydraulic test (if any) And pressure applied -
8. Is the pressure vessel in open, exposed to weather or damp - Under Shed
9. What parts, if any, were inaccessible - Internal Construction
10. What examination & test were made - Ultrasonic test was conducted. The results
(specify pressure If hydraulic test was carried out) are S= 5.0 mm, 5.1 mm & D= 6.0 mm, 6.1 mm
11. `Condition of pressure vessel - Good
12. Are the required fitting & appliances provided - Yes
In accordance with the rules for pressure plants ?
13. Are all fittings & appliances properly maintained - Yes, safety valve, pressure gauge, And in
good condition ? drain valve provided.
14. Repair, if any required and period within which they - Nil
Should be executed and other condition which the
person making examination thinks it necessary to
specified for securing safe working pressure
15. Safe working pressure, calculated from the dimension - 3.0 Kg/cm2
And from the thickness and other data ascertained
by present Examination, due allowance being made
for conditions Of working if unusual of exceptionally
severe (State minimum Thickness of walls
measured during the examination)
16. Where repairs affecting the safe working pressure are - No as such repair is required.
required, state the following working pressure before
the expiration of the period specified In (14)

I certified that on 11.02.2021, the pressure vessel described above was thorough examination and for such and so far
as its construction permit made accessible for thorough examination and for such tests as were necessary for thorough
examination that on the said date. I thoroughly examined this pressure vessel including its fittings and that the above is
a true report of my examination.

RAMESH KUMAR PATEL Office Cum Residence


B.E. (Mechanical) Durg (Chhattisgarh)
RECOGNISED BY THE DIRECTORATE INDUSTRIAL Mobile # 99261-91171
HEALTH & SAFETY (CHIEF INSPECTOR OF FACTORIES Phone # 0788-4060315
GOVT. OF C.G. RAIPUR E-mail : yes_ramesh@yahoo.com
APP NO. : DIHS/C.G./RPR/C.C./2020/4327366436

You might also like