DMM - 01- 05
DISTRIBUTION MAINTENANCE MANUAL
ISSUE DATE: May 24, 2005

DMM-01-05

MAINTENANCE OF SUBSTATION
ROOM
( ‫)ﺻﻴﺎﻧﺔ ﻏﺮف اﻟﻤﺤﻄﺎت‬

Technical Support Department


Maintenance Standard and Improvement Division
‫ﺍﻟﺸﺭﻜﺔ ﺍﻟﺴﻌﻭﺩﻴﺔ ﻟﻠﻜﻬﺭﺒﺎﺀ‬ DISTRIBUTION MAINTENANCE MANUAL
DMM No. 01- 04
Saudi Electricity Company
ISSUE DATE: REPLACES:
DISTRIBUTION TRANSFORMER FIELD TESTING
Page i of iii

TABLE OF CONTENTS

Page

1.0 INTRODUCTION 1

2.0 ENVIRONMENTAL CONDITIONS AND PROBLEM REVIEW 3


2.1 Environmental Conditions 3
2.2 Problem Review 3

3.0 SUBSTATION INSPECTION 7


3.1 Identification of Defects 8

4.0 ESTIMATION OF MANHOURS AND MATERIALS 12

5.0 PROCEDURE FOR REPAIRS 13

5.1 Cracks Repair 13


5.2 Water Leak Repairs 22
5.3 Rust Spot Repairs 27
5.4 Delamination / Spalling 28
5.5 Sagging of Roof 28
5.6 Sagging of Floor5.17 29
5.7 Plaster Defects 30
5.8 Access Blocked 30
5.9 Rodent Entry Holes 30
5.10 Cover Plates 31
5.11 Door Repairs 31
5.12 Door Steps 31
5.13 Substation Room Painting 31
5.14 Non-functional Accessories 32
5.15 Final Clean-up 32

6.0 FLOW CHARTS FOR REPAIR PROCEDURES 33

New X Addition Changes Revision


‫ﺍﻟﺸﺭﻜﺔ ﺍﻟﺴﻌﻭﺩﻴﺔ ﻟﻠﻜﻬﺭﺒﺎﺀ‬ DISTRIBUTION MAINTENANCE MANUAL
DMM No. 01- 04
Saudi Electricity Company
ISSUE DATE: REPLACES:
DISTRIBUTION TRANSFORMER FIELD TESTING
Page ii of iii

7.0 PROCEDURE FOR DEMOLITION 42


7.1 Criteria for Demolition 42
7.2 Protection to Distribution Equipment During Demolition 43
7.3 Safety of Equipment 43
7.4 Procedure for Demolition 43

8.0 QUALITY CONTROL 45

New X Addition Changes Revision


‫ﺍﻟﺸﺭﻜﺔ ﺍﻟﺴﻌﻭﺩﻴﺔ ﻟﻠﻜﻬﺭﺒﺎﺀ‬ DISTRIBUTION MAINTENANCE MANUAL
DMM No. 01- 04
Saudi Electricity Company
ISSUE DATE: REPLACES:
DISTRIBUTION TRANSFORMER FIELD TESTING
Page iii of iii

APPENDICES
Page

Appendix A1 Inspection Report 47

Appendix A2 Procedure for Handling Water Flooding of Cable Trenches in 51


Substation Room

Appendix A3 Repair Tools & Equipment 54

Appendix A4 Material Testing Laboratories and List of Tests 59

New X Addition Changes Revision


‫ﺍﻟﺸﺭﻜﺔ ﺍﻟﺴﻌﻭﺩﻴﺔ ﻟﻠﻜﻬﺭﺒﺎﺀ‬ DMM - 01- 05
Saudi Electricity Company
ISSUE DATE: REPLACES:

MAINTENANCE OF SUBSTATION ROOMS


Page 7 of 60

3.0 SUBSTATION INSPECTION

The initial inspection of the substation room should be made by the Substation
Equipment Inspector as per the Substation Inspection Schedule and a report in the
Substation Room Inspection Report form should be prepared (Appendix–A1). The
Inspection Report should be given to the Substation Room Maintenance Segment
(SRMS) which shall make a further detailed qualitative and quantitative expert
inspection and fill out details in the same Report.

Based on this Inspection Report, a final decision regarding civil maintenance work
such as the repair work to be performed by the SRMS and/or by Contractor shall be
made. During inspection, all the safety precautions shall be observed by the concerned
inspectors as described in Section 1.3.

New X Addition Changes Revision


‫اﻟﺸﺮآﺔ اﻟﺴﻌﻮدﻳﺔ ﻟﻠﻜﻬﺮﺑﺎء‬
Saudi Electricity Company

SUBSTATION ROOM INSPECTION REPORT

To be filled by S/S Room Maint.:


OA:_______________ Substation No.:_____________________ Job No.________________ Date:__________
Division: ____________________ Location: ____________________ Work Order No._________________________
Date:

t or
ac
G ce Fan rs

T ntr
n t ne
s
oo te h

R y C
D r S enc

Fe aus itio

U k b SE
EN o
Ve r ps

A ts rs

G C
C ms b

oo ns

gh to

h d
ea la

oo r

or y
D le T

Ex Con

W kb
Li tila
B fS

W ers
Fl m
W l1
W l2
W l3
R l4

C r

O e
u

or
oo

ab

n
al
al
al
al

th
at
Defects Observed Remarks
ol

ir
W

1 Minor cracks
2 Major cracks
3 Water leaks
4 Rust spots
5 Delamination
6 Spalling
7 Collapsed
8 Sagging/settlement
9 Plaster defects
10 Repairs required
11 Access blocked
12 Rodent entry hole
13 Cover plate
14 Repaint
15 Not working
16 Lock
Observations:

Estimated cost (SR):


Inspected by (S/S Eq. Maint.):_____________________
Materials:_______________ Labor:___________________
Signature:_____________ Date:___________________
Total:____________________________________________

Inspected by (S/S Rm. Maint.):____________________ Work Order Completion Date:________________________

Signature: Date: Actual Work Completion Date:_______________________

Note: Work accepted by (S/S Rm. Maint.):__________________

Wall-1: Wall with main door Wall-2: Right of Wall-1 Signature:_______________ Date:____________

Wall-3: Opposite Wall-1 Wall-4: Left of Wall-1 Approved by S/S Rm. Maint. Sup.:
Mark 'URGENT' if necessary
‫اﻟﺸﺮآﺔ اﻟﺴﻌﻮدﻳﺔ ﻟﻠﻜﻬﺮﺑﺎء‬
Saudi Electricity Company

INSPECTION REPORT
Substation Room Structure

(Page 2)
Division:_________________ Substation No.______________________
MATERIALS
Estimated Actual Local Purchase
No. Material Description Issue Unit Stock No.
Quantity Quantity Qty Cost (SR)

MANHOURS
Manhours LOCATION
No. Craft Estimated Actual
1 Mason
2 Carpenter
3 Welder
4 Electrician
5 Painter
6 Laborer
7
8
9
10

You might also like