QUALITY REPORT

EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT


REGENCY OF JOMBANG ; INDONESIA

DATE 11 September 2020 DATE 11 September 2020


LOCATION Road Construction Work LOCATION Road Construction Work

Brickwall From MRH Brickwall From MRH

DATE 11 September 2020 DATE 11 September 2020


LOCATION Road Construction Work LOCATION Road Construction Work

Brickwall From MRH Brickwall From MRH


PT. ADHI KARYA (PERSERO)
TBK
DEPARTMENT OF INFRASTRUCTURE II
CONSTRUCTION DIVITION IV
`
EMISSION REDUCTION IN CITIES PROGRAMME SOLID WASTE MANAGEMENT:
(ERIC-1) REGENCY OF JOMBANG ; INDONESIA

SUBMITTAL FOR MATERIAL APPROVAL


ITEM NO. 8.5 Walls and Floors NUMBER ERIC.JBG/PROC/MAT/015/Sep/2020
ITEM 8.5.1 Brick Wall DATE September 18, 2020

NO. MATERIAL PRODUCT/BRAND/TYPE/CAP. SUBCONTRACTOR/ SUPPLIER

1 Brick wall Batu Bata Press MRH Bata Press MRH Mojosari
5cm x 11 cm x 22 cm

DRAWING
SPECIFICATION 8-3 Particular Technical Specification
ATTACHMENT
BROCURE (Attached)
SAMPLE (Attached)

APPROVED `
STATUS OF APPROVAL REVISED
CHANGED

ENGINEER/ EMPLOYER'S NOTE :

NOTE :
If within 28 days of this request of work there is no response, then this request of is considered to have been approved
Made and Submitted by Checked and Approved by Known and Approved by
CONTRACTOR IMPLEMENTATION CONSULTANT EMPLOYER
PT. ADHI KARYA (Persero), Tbk. FITCHNER GMBH & CO. TECHNICAL DIRECTOR PPK PPLP SATKER WIL 1

Ir. ANANG SUDIBYO Ir. Mohamad Effendi, MM. WIDY SAPARINA, ST,MT'
CONTRACTOR REPRESENTATIVE DEPUTY RESIDENT ENGINEER NIP. 19880917201012 2 004
DATE : DATE : DATE :

You might also like