Professional Documents
Culture Documents
03 DP Slides Operations and Supply Chain
03 DP Slides Operations and Supply Chain
1
Agenda
ge da
X Operations and Supply Chain Organization
X Vision
X Organization
X Quality
X Investments
2
OSCO Vision
Respond
R d to the
h bbusiness
i requirements
i in
i
the most effective and efficient way
3
Strategic Pillars
X Continuous improvement
Continuous Strategic
Improvement Planning
Site manager
6
Truly global manufacturing footprint with 40
production facilities in 26 countries worldwide
Thimister, Belgium
Chekhov Russia
Chekhov,
Lebbeke-Wieze, Belgium
Heule-Kortrijk, Belgium Nuth, The Netherlands
Zundert, The Netherlands
Banbury, UK
St. Albans, VT, US
St Helens, UK + Kagerod,
g Sweden
Chester, UK
Pennsauken, NJ, US
St. Hyacinthe, Canada Lodz, Poland
Eddystone, PA, US
Louviers, France +
Robinson, IL, US + Meulan, France +
Dijon, France
American Canyon, CA, US + + Dübendorf, Switzerland
Norderstedt,, Germanyy Tsukaguchi Japan
Tsukaguchi,
Verbania-Intra, Italy Zuzhou, China
Abidjan Zone, San Sisto, Italy
Monterrey, Mexico Ivory Coast
Vic Gurb, Spain
Toluca, Mexico San Pedro, Alicante, Spain
Ivory Coast
Cocoa:
X Origin factories focussed on access to the beans with
limited product range
X Cocoa sites in consuming countries focussed on
blending of different origins and service to the
customers
X Integratedd sites ffocussed
d on the
h cocoa requirements for
f
the chocolate
Chocolate:
X Specialties (like white, nuts products etc.) are
centralized in a limited number of sites per region
X S
Standard
d d products
d are produced
d d close
l to the
h customers
and are used for capacity balancing
8
Advantages of our factory footprint
9
Supporting growth while staying cost leader
+21%
Liquor
q
Pressing
+22%
Chocolate liquid
2008 2011
X Headcount evolution (factory headcount excl consumer)
+3%
3.538 3.531 3.528
3.185
92.2% 91.0%
79.4% 82.6%
Liquid chocolate 89.1% 81.2%
11
Continuous Improvement
12
Continuous improvement
One+
X Main Objectives
X Install a common process and way of working for the group
To improve the efficiency and the effectiveness
To improve transparency and interchangeability
To facility the rotation of people between sites and functions
X Create a pool of people that are ready to take over line functions
Get to know the (production) processes
Get to know the plants and the people
Experts in the continuous improvement methodomogy
X Implementation.
X Supported by an external specialist (on the job training)
X First focus on the plants:
Finalized 3 pilot sites (US, France and Japan)
Started with the wave 2 plants (Belgium, Malaysia & US)
X Next steps: Widen the scope to other processes and other functional areas
X Results achieved
X Yearly savings of about 4 mio Euro for the 3 pilot sites
13
Continuous improvement
One+
14
Continuous improvement
One+
X No ‘real’ root cause analysis X RCAs are done several times per week
X We had bad meetings but didn’t know it X We know what a good meeting looks like
X Managed from lagging indicators X KPIs are looked at daily & challenged
X Production results not being challenged X A better understanding of OEE and its
components
15
Continuous improvement
Quality
X Background:
X Quality requirements in the market are changing
X BC wants to be leading from a quality point of view
X Implementation
X BRC certification and site audits
Strenghtening of the internal audit team
Sharing of issues and best practices
Training
X Better separation on existing lines to avoid contamination
X Investments
X Increased awareness
X Results:
X 29 sites are BRC certified
16
Continuous improvement
Strategic equipment sourcing
Through data analysis, interviews and workshops with the sites, the following
main levers that will drive the savings for the technical spend were identified:
18
Investments support the growth of our
business
In CHFm
Additional growth
IT
5% Upgrade / efficiency gains
on existing sites
Maintenance
4% 250
3%
3%
3%
CAPEX as % of sales
170
153
144 145
115
19
Process & Technology
Development
20
Engineering
roasting
X Heating,
Heating cooling,
cooling heat recuperation etc
etc.
X Output improvements as mentioned above
X Improving
p gpprocess y
yields
21
Sales & Operations Planning
22
Sales and Operations planning
X Main objectives:
X Achieve the required internal and external service levels (98% OTIF)
X Manage capacity utilization (80-85% for chocolate – 90-95% for cocoa)
X Reduce the stock coverage year-on-year
X E h
Enhancement
t off the
th regional
i l S&OP processes
X Improved communication
X Better forecasting
X Global S&OP
X Align interregional flows
X Report global inventory evolution and capacity utilization
X Improved visibility to prevent unexpected regional demand
X Coordinate the planning aspects on projects for global accounts
X Results
X Stock coverage has improved by 10% over the last 3 years
X Service levels have been stable or improved
23
Raw Material Optimization
24
Raw material saving projects
X Main Objectives
X Recipe improvements: Work with R&D to reduce the
costs of the materials
X Better control and improvement of the yields in the
plants
l t
X Reduction of waste and rework
X Reduction of overweight
X T
Transport t optimization
ti i ti
X Implementation
X Cross functional project teams are working under the
lead of the regional OSCO managers
X Results achieved
X Projects in Americas and Europe resulted in an
annual saving of more than 14 Mio CHF
25
CSR
Energy Savings & CO2 reduction
26
CSR in Operations
Energy savings and CO2 reduction
X Target:
X Reduce the CO2 emissions from the plants and owned DC’s by 20% per ton over the
next 4 years
X Results at the end of year 2:
X Energy consumption per ton has been reduced by 11,8%
X Main actions taken: Examples
p
X Awareness
Target setting and translation into bonus targets for key people
Introduction of KPI’s with monthly reporting
Introduction of an energy management system
One of the key topics in the continuous improvement program
X Process optimization
Output improvement on existing equipments and lines
O
Optimized d shut-down
h d procedures
d
Right sizing of equipments
Free cooling
Insulation
X Technology
Installation of new breakers on the roasting lines to reduce gas consumption by 25%
New hydraulic groups on presses
Economizers on boilers and roasters
BC Competitive Advantages